Permit NumberBLD19-00682
StatusFinaled
Name HC COMPANY INC
Site Address 6074 N DISCOVERY WAY Unit: 125
Project NameSystem One Holdings - Ste 125
Customer Number 
ePlanReviewYes
Description
(SYSTEM ONE HOLDINGS – COLUMBIA BUILDING - SUITE #125) //Plan modification to remove select demo work from scope of work, adding half height walls, create a new conference room, select new suspended acoustic ceiling and electrical work. 5-21-2019 JG// Permit is to combine an existing 3,088 sq. ft. business space with the adjacent 4,117 sq. ft. vanilla space on the north end of the building (vanilla created under BLD18-03324) to create a new office tenant space that is 7,211 sq. ft. within the existing building. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select door/door frame, removal of select interior nonbearing walls, removal of select ceiling, select construction of wall infill and add new interior window, millwork, select new suspended acoustic ceiling, electrical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/25/20196/25/20196/25/2019PPASS
DetailsTell Riley
john Phone #: ###-####//final complete per plans//
FIRE-Final Inspection6/24/20196/25/20196/25/2019APASS
DetailsJim Page
Previously noted items have been corrected, suite number will be installed before BLD final. Fire sprinkler inspection complete, fire alarm inspection is complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection for area of work complete.

John Phone #: ###-####
First Notice 7/5/20196/25/2019 DONE
Permanent Occupancy  6/25/2019 DONE
FIRE-Final Inspection6/24/20196/24/20196/24/2019PFAIL
DetailsJim Page
Emergency lights by east side entry and west side office space did not operate when A/C power was isolated. FIR permit for fire sprinklers needs to be finaled before fire life safety inspection can be completed. Provide suite number for tenant space.

John Phone #: ###-####
BLD-Ceiling Grid Inspection6/19/20196/19/20196/19/2019PPASS
DetailsTell Riley
John Phone #: ###-####//grid ok per plans//
BLD-Framing/Rough-in5/24/20195/24/20195/24/2019APASS
DetailsJim Sly
Call Jon Craft 30 minutes prior. Phone #: ###-#### Inspection requested via web by Jonathan Craft
CHANGE STATUS TO (ISS)  5/22/2019 DONE
Print Occupancy Form  5/22/2019 DONE
Plan assigned to (JG)4/26/20194/26/20195/21/2019 PASS
DetailsJavier Guzman
Plan Mod, Click Funnels - Suite #125
Routing - PLAN CHECK5/13/2019 5/21/2019 PASS
DetailsJavier Guzman
Permit Ready to Issue  5/21/2019 DONE
MET EMAIL JTHOMAS@HCCO-INC.COM
Plan Mod Approved
Need-
Revised value for Plan Mod
Plan Reviewer's activity  5/7/2019 DONE
DetailsJavier Guzman
Prescreen Plan Mod
Provide and show the following:
• Provide top of wall bracing section details
• Provide new suspended acoustic ceiling section details
• With the new conference room, the northern portion of the office is going to require emergency lighting and exit signs. Therefore, provide and show emergency lighting and exist sign locations.
• The new conference room will require receptacle outlets to comply with the 2017 NEC articles 210.71 and 210.52(A)(1)-(A)(4)
(I will email the NEC 2017 code sections so that you may view)
Telephone call  4/29/2019 DONE
Spoke with Tucker to confirm this plan mod app is for this permit. That we are still waiting on the signed building permit to be sent back before we can start the plan mod in EPlan. (Sent a reminder to HC COMPANY to please sign the building permit and email it back)
Print Occupancy Form  4/26/2019 DONE
Issue PAID IN FULL permit  4/26/2019 DONE
Plan Modification Accepted  4/26/2019 DONE
plan mod accepted-changes to walls, doors & ceilings no longer to be demolished-sheets G001, AD001 & A112-assigned to JG
Route to Impact Fee Review3/20/20193/23/20193/21/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
Plan assigned to (JG)3/13/20193/13/20193/20/2019 PASS
DetailsJavier Guzman
3/22 L2 Click Funnels ePlan
Routing - PLAN CHECK3/13/2019 3/20/2019 PASS
DetailsJavier Guzman
1st review completed  3/20/2019 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  3/20/2019 DONE
Permit Ready to Issue  3/20/2019 DONE
MET
Need GC
Need rev cert of val
Routing - Addressing3/13/2019 3/13/2019 PASS
DetailsDoug Chausow
Suite 125
Routing - PUBLIC WORKS3/13/2019 3/13/2019 PASS
DetailsAngela Hardy
Intake Approval  3/11/2019 PASS
DetailsJavier Guzman
Intake Approval  3/6/2019 FAIL
DetailsMichael Hanson
This permit has failed prescreen due to the following:
1. Provide FE location for this space
2. Provide lighting information.
3. Provide door hardware information.
Application received  3/4/2019 DONE
Application submitted via PDS Online on Mar 4 2019 4:14PM