Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD19-00703
StatusFinaled
Name STEED CONSTRUCTION
Site Address 110 N 27TH ST
Project NameGravity Payments
Customer Number 
ePlanReviewYes
Description
(GRAVITY PAYMENTS) Permit is to remodel an existing 10,692 sq. ft. business building (5,346 sq. ft. basement + 5,346 sq. ft. main floor). Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior walls, removal of select exterior storefront entry door, removal and replacement of exterior storefront windows, removal of select door/door frames, removal of select floor finishes, removal of select millwork, construction of interior non-bearing walls to create a conference room, (3) meeting rooms, an open break area and select wall infill, an IT room, a deploy room, (3) phone rooms, a collaboration room, a vestibule, a reception area, a lounge area, open office areas and a break area, select new interior and exterior door/door frames, select new framed walls at restrooms existing walls to deck above, select new interior storefront windows, new Hi/Lo drinking fountain, millwork, select new suspended acoustic and gypsum ceiling, light fixtures, new rooftop mechanical heat pumps, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This basement only building is Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 11/8/201911/26/2019 DONE
mailed 12-2-19
First Notice 9/19/201910/29/2019 DONE
mailed 11-1
BLD-Final9/9/20199/9/20199/9/2019PPASS
DetailsDave Hannah
Mike Phone #: ###-####
Permanent Occupancy  9/9/2019 DONE
FIRE-Final Inspection8/29/20198/30/20198/30/2019APASS
DetailsJim Page
Previously noted items have been corrected except for the round type door hardware that is still on 3 doors, the mech room door, janitors closet and large room southside basement, round type door hardware needs to be replaced with code compliant door hardware before BLD final, hardware change will be verified during BLD final per conversation with Dave Hannah. Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are placed with current inspection tags, final life fire safety inspection is complete, card has been signed for fire alarm, fire sprinkler and life safety.

Mike Phone #: ###-####
FIRE-Final Inspection8/26/20198/27/20198/27/2019PCANC
DetailsJim Page
FIR permit for fire alarm \s needs to be finaled before life fire safety inspection can be completed, last fire alarm inspection resulted in a fail, this request is cancelled.

Mike Phone #: ###-####
FIRE-Final Inspection8/23/20198/26/20198/26/2019PFAIL
DetailsTroy Cobbley
Provide knox box, provide annual inspection for fire sprinkler system, provide single action hardware for the three doors in basement, provide address as discussed,

Mike Phone #: ###-####
Print Occupancy Form  8/26/2019 DONE
BLD-Ceiling Grid Inspection8/1/20198/2/20198/2/2019PPASS
DetailsDave Hannah
Mike Phone #: ###-####
BLD-Framing/Rough-in6/20/20196/21/20196/24/2019PPASS
DetailsDave Hannah
Mike Phone #: ###-####
Issue PAID IN FULL permit  6/10/2019 DONE
emailed nate.walrath@steedconstruction.com
to sign building permit
Print Occupancy Form  6/10/2019 DONE
Plan assigned to (JG)4/11/20194/11/20196/6/2019 PASS
DetailsJavier Guzman
3rd rev comp, 04/24 L2 Gravity Payments ePlan, pend DR
PLANS/APPL TAKEN TO FRONT DESK  6/6/2019 DONE
Permit Ready to Issue  6/6/2019 DONE
all met: nate.walrath@steedconstruction.com

NEED
GC FORM
REVISED VALUE
Routing - Design Review5/25/2019 6/4/2019 PASS
DetailsAndrea Tuning
Routing - PLAN CHECK5/25/2019 5/29/2019 PASS
DetailsJavier Guzman
Routing - PLAN CHECK5/9/2019 5/13/2019 PASS
DetailsJavier Guzman
Routing - Design Review5/9/2019 5/9/2019 FAIL
DetailsAndrea Tuning
Provide a 5-foot setback from the south property line to the proposed trash enclosure. The 5-foot setback area shall be landscape to screen the enclosure from public view.
Meet all Public Works standards for the proposed trash enclosure. Please see the memo dated January 11, 2019 from Public Works in regard to solid waste.
The elevations proposed do not match the elevations approved under Design Review application DRH19-00003. The applicant should submit elevations that match the approved Design Review application or obtain a Design Review modification.
Route to Impact Fee Review4/24/20194/27/20194/25/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
1st review completed  4/24/2019 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK4/11/2019 4/24/2019 FAIL
DetailsJavier Guzman
Routing - MECHANICAL4/11/2019 4/16/2019 PASS
DetailsTroy James
Routing - PUBLIC WORKS4/11/2019 4/15/2019 PASS
DetailsAngela Hardy
Routing - Design Review4/11/2019 4/12/2019 FAIL
DetailsAndrea Tuning
Provide a 5-foot setback from the south property line to the proposed trash enclosure. The 5-foot setback area shall be landscape to screen the enclosure from public view.
Meet all Public Works standards for the proposed trash enclosure. Please see the memo dated January 11, 2019 from Public Works in regard to solid waste.
The weather protection devices on the west elevation will be allowed to encroach a maximum depth of 2-feet into the 27th Street setbacks (20-feet) or obtain a variance to allow further encroachment.
Relocate the proposed bicycle parking to be located outside of the planter islands. The parking shall be conveniently located and visible to individuals utilizing alternative modes of transportation and comply with ordinance standards in regard to dimensions and location.
Routing - Addressing4/11/2019 4/11/2019 PASS
DetailsDoug Chausow
Intake Approval  4/11/2019 PASS
DetailsJavier Guzman
Intake Approval  4/2/2019 FAIL
DetailsMichael Hanson
Provide location of fire extinguishers (existing and new)
Provide structural engineering demonstrating existing structure can support new roof top equipment.
Application received  3/6/2019 DONE
Application submitted via PDS Online on Mar 6 2019 10:07AM
(F) Reprint permit  3/6/2019 DONE