BLD-Conference | 10/18/2019 | 10/18/2019 | 10/18/2019 | P | PASS |
Mike Jordan
|
|
|
All items have been taken care of. Phone #: ###-#### Inspection requested via web by Mark Fischer
|
DOC - Permit Finaled | 10/18/2019 | 10/18/2019 | 10/18/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 10/18/2019 | 10/18/2019 | 10/18/2019 | P | PASS |
Mike Jordan
|
|
|
All items have been taken care of. Phone #: ###-#### Inspection requested via web by Mark Fischer
|
BLD-Final | 9/25/2019 | 9/25/2019 | 9/25/2019 | P | FAIL |
Mike Jordan
|
|
|
Please call ###-#### prior to heading over. Thanks Phone #: ###-#### Inspection requested via web by Mark Fischer. Provide tempered glazing next to front door. Egress ladder required for egress from basement bedroom in backyard.
|
BLD-Wall cover | 7/1/2019 | 7/1/2019 | 7/1/2019 | P | PASS |
Mike Jordan
|
|
|
Please call Mark Stevens half hour before arriving at ###-####. All insulation in garage and house is complete. There are some additional interior walls receiving insulation for sound barrier but I wanted to have everything inspected prior to the interior wall cavity was filled. All additional air sealing locations have been filled per Inspectors direction. Inspection requested via web by Mark Fischer. Ok to sheet rock.
|
BLD-Framing/Rough-in | 6/25/2019 | 6/26/2019 | 6/26/2019 | P | PASS |
Mike Jordan
|
|
|
Approve framing for insulation on house and garage. Please come after 4pm. Inspection requested via web by Mark Fischer
|
BLD-Conference | 6/21/2019 | 6/21/2019 | 6/21/2019 | A | DONE |
Mike Jordan
|
|
|
Come inspect framing portion to OK for spray foam of interior walls of house for first floor and basement. Review new portal frame support as well. Requested early morning inspection prior to insulation contractor arrival. Inspection requested via web by Mark Fischer. Needs mech. rough in inspection prior to insulation. Complete sealing of top plate and bottom plate penetrations on interior walls. Strap top plate at plumbing vent pentrations in master bedroom. Complete lateral bracing on A05 truss.
|
Routing - MECHANICAL | 6/20/2019 | | 6/20/2019 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Conference | 6/17/2019 | 6/17/2019 | 6/17/2019 | A | PASS |
Mike Jordan
|
|
|
Inspect Garage Portal Frame Walls for Framing and Nailing Schedule. Need inspection approval as the Mason''s are wanting to finish exterior work and would like to cover the front walls. Also have the ESR report for the RTECH foam board used in the roofing. Please call Mark Stevens 30mins prior to arriving at ###-####. Inspection requested via web by Mark Fischer. The R tech foam insulation is ok as installed.
|
BLD-Wall Bracing | 6/17/2019 | 6/17/2019 | 6/17/2019 | A | PASS |
Mike Jordan
|
|
|
Inspect Garage Portal Frame Walls for Framing and Nailing Schedule. Need inspection approval as the Mason''s are wanting to finish exterior work and would like to cover the front walls. Also have the ESR report for the RTECH foam board used in the roofing. Please call Mark Stevens 30mins prior to arriving at ###-####. Inspection requested via web by Mark Fischer
|
BLD-Conference | 6/5/2019 | 6/6/2019 | 6/6/2019 | A | DONE |
Mike Jordan
|
|
|
Preliminary inspection of framing progress to date. Please call Mark Stevens at 1 ###-#### 30 minutes prior to arrival. Inspection requested via web by Mark Fischer. Provide nails on portal frame. Need ESR report for foam insulation. Also walk through on framing.
|
BLD-Conference | 4/9/2019 | 4/9/2019 | 4/9/2019 | P | CANC |
Mike Jordan
|
|
|
Need OK on depth of structural footers in basement before pour. Phone #: ###-#### Inspection requested via web by Mark Fischer
|
BLD-Footing | 4/9/2019 | 4/9/2019 | 4/9/2019 | P | PART |
Mike Jordan
|
|
|
Need OK on depth of structural footers in basement before pour. Phone #: ###-#### Inspection requested via web by Mark Fischer. Interior column pad footings in basement.
|
BLD-Wall Bracing | 3/26/2019 | 3/27/2019 | 3/27/2019 | A | CANC |
Mike Jordan
|
|
|
stem wall // Mark or ###-#### Phone #: ###-####
|
BLD-Foundation | 3/27/2019 | 3/27/2019 | 3/27/2019 | A | PASS |
Mike Jordan
|
|
|
stem wall // Mark or ###-#### Phone #: ###-####. Stemwall for new garage ok.
|
BLD-Footing | 3/22/2019 | 3/25/2019 | 3/25/2019 | A | PASS |
Mike Jordan
|
|
|
Travis Phone #: ###-####. footings for new garage ok.
|
OVERRIDE | | | 3/19/2019 | | |
|
|
|
|
OVERRIDE | | | 3/19/2019 | | |
|
|
|
|
OVERRIDE | | | 3/19/2019 | | |
|
|
|
|
OVERRIDE | | | 3/19/2019 | | |
|
|
|
|
OVERRIDE | | | 3/19/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 3/18/2019 | 3/18/2019 | 3/19/2019 | | PASS |
Josh Bogle
|
|
|
3/22 remodel, paper
|
Routing - MECHANICAL | 3/18/2019 | | 3/19/2019 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 3/19/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/19/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/19/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/19/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Permit Ready to Issue | | | 3/19/2019 | | DONE |
|
|
|
met
(if parcel owner is not acting as GC we will need RP and GC form from contractor)
|
Telephone call | | | 3/19/2019 | | DONE |
|
|
|
called owner, Mark and informed him that permit is ready and what fees are due.
|
Issue PAID IN FULL permit | | | 3/19/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 3/18/2019 | 3/18/2019 | 3/18/2019 | A | PASS |
Josh Bogle
|
|
|
took in as a level two - routed to Mechanical
|
Routing - PLAN CHECK | 3/18/2019 | | 3/18/2019 | | PASS |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 3/8/2019 | 3/8/2019 | 3/8/2019 | A | DONE |
Ethan Mansfield
|
|
|
|
Routing Walk-In (BLD) | 3/8/2019 | 3/8/2019 | 3/8/2019 | A | FAIL |
Josh Bogle
|
|
|
missing as-builts & engineering calcs
|
Routing - PLAN CHECK | 3/8/2019 | | 3/8/2019 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 3/8/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 3/8/2019 | | | |
|
|
|
|