Permit Information
Permit NumberBLD19-02065
StatusFinaled
Name ESI
Site Address 390 S CAPITOL BLVD
Project NameMOD Pizza TI
Customer Number 
ePlanReviewYes
Description
(MOD Pizza TI) Permit is to build out a new 2,781 sq. ft. restaurant in a new shell space constructed under BLD18-04470 in the existing development at Capitol and Front Streets. Note: site work and envelope including HVAC units and exterior lighting in compliance with 2015 IECC was approved with the shell permit. Work to include: construction of non-bearing interior walls and doors; modification to exterior patio railing; suspended ceilings; electrical power and interior lighting; mechanical including new RTU and pizza oven exhaust system; plumbing; kitchen equipment; millwork and interior finishes in compliance with Chapter 8 of the 2015 IBC. Special inspections required per attached Form 310. All work shall comply with the approved drawings, the plan review report, and all applicable codes. DRH12-00319, DRH18-00459, & CUP12-00067 per Planning and Zoning. This building is fully Fire Sprinklered with an approved Fire Alarm system for A2 occupancy. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 12/7/201912/30/2019 DONE
mailed 1-1-20
First Notice 11/1/201911/27/2019 DONE
BLD-Final10/21/201910/22/201910/22/2019APASS
DetailsDave Hannah
Josh Phone #: ###-####
Zoning Approval10/22/201910/22/201910/22/2019 PASS
DetailsKatelyn Menuge
Permanent Occupancy  10/22/2019 DONE
FIRE-Final Inspection10/17/201910/18/201910/18/2019APASS
DetailsTroy Cobbley
**PASS Fire Final. Tenant GC still waiting on core&shell to be finaled. Perm Occ signed.MAS**
josh Phone #: ###-####
BLD-Final10/17/201910/17/201910/17/2019PPART
DetailsMike Jordan
Ok for temp occ. Will be ok for perm occ. once life/safety signs perm. and shell and core has bee signed off.
FIRE-Final Inspection10/16/201910/17/201910/17/2019APART
DetailsMike Jordan
JOSH Phone #: ###-####. A temp. occupancy is given upon the condition that the South west exterior emergency light is repaired and functional by the end of today (10-17-19)
FIRE-Final Inspection10/16/201910/16/201910/16/2019PCANC
DetailsTroy Cobbley
Need the shell/core building permit finaled first. I spoke to josh about this. jOSH Phone #: ###-####
FIRE-Final Inspection10/9/201910/9/201910/9/2019PFAIL
DetailsJim Page
Final inspection for core and shell life fire safety has not been completed under BLD18-04470, permit is still in issued status. Final fire sprinkler inspections for FIR19-00233 and FIR19-00234 for core and shell has not been completed. Final fire sprinkler inspection for TI fire sprinkler modifications, FIR19-00573, has not completed. Final fire alarm inspection for TI fire alarm install, FIR19-00663 has not been completed. Final life fire safety for core and shell, final inspections for all FIR permits needs to be completed before TI life fire safety inspection will be completed.

Josh Phone #: ###-####
BLD-Framing/Rough-in9/9/20199/10/20199/11/2019PPASS
DetailsDave Hannah
Josh Phone #: ###-####
BLD-Framing/Rough-in8/29/20198/29/20198/29/2019PPART
DetailsDave Hannah
Josh Phone #: ###-#### ok to one side if ok with elec.
Print Occupancy Form  7/30/2019 DONE
Issue PAID IN FULL permit  7/30/2019 DONE
Plan assigned to (JAR)6/12/20196/12/20197/25/2019 DONE
DetailsJulie Romig
1st Rev Comp - 2nd Rev Comp - L3 MOD TI
Routing - PLAN CHECK7/25/2019 7/25/2019 PASS
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  7/25/2019 DONE
Permit Ready to Issue  7/25/2019 DONE
MET ANDREA.SPEED@GRAPHITEDESIGNGROUP.COM
NEED
GC
Rev Val
MET
ACHD
Routing - PLAN CHECK7/19/2019 7/24/2019 FAIL
DetailsJulie Romig
Routing - PLUMBING7/24/2019 7/24/2019 PASS
DetailsDaryl Spivey
May require additional backflow protection on installed equipment. Per plan and ISPC
Routing - MECHANICAL7/24/2019 7/24/2019 PASS
DetailsTroy James
Routing - PUBLIC WORKS7/24/2019 7/24/2019 PASS
DetailsAngela Hardy
Routing PW Solid Waste7/24/2019 7/24/2019 PASS
DetailsEvan Carpenter
Sharing enclosure with Trader Joe's
Routing - Design Review7/19/2019 7/19/2019 PASS
DetailsKatelyn Menuge
Route to Impact Fee Review7/8/20197/11/20197/9/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
Routing - FIRE6/12/20196/12/20197/8/2019 PASS
DetailsMark Scharfen
07.08.2019-Completed fire review. Uploaded rev_fire 07.08.2019.pdf
1st review completed  7/8/2019 FAIL
DetailsJulie Romig
Routing - PLAN CHECK6/12/2019 7/8/2019 FAIL
DetailsJulie Romig
Routing PW Environmental6/12/2019 7/2/2019 PASS
DetailsRick Christenson
Routing - MECHANICAL6/12/2019 6/17/2019 PASS
DetailsTroy James
Routing - PLUMBING6/12/2019 6/13/2019 PASS
DetailsDaryl Spivey
May require additional backflow protection on installed equipment. Per plan and ISPC.
Routing Off Site - C.D.H6/12/2019 6/13/2019 PASS
DetailsJulie Romig
Routing - Design Review6/12/2019 6/12/2019 FAIL
DetailsKatelyn Menuge
String lights, large window graphic and mural require Design Review Approval. Obtain approval or remove from building permit.
Routing - PLANNING6/12/2019 6/12/2019 PASS
DetailsNicolette Womack
Routing - Addressing6/12/2019 6/12/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS6/12/2019 6/12/2019 PASS
DetailsAngela Hardy
Intake Approval  6/11/2019 PASS
Plan Reviewer's activity  6/8/2019 PASS
Plan intake review approved
Intake Approval  6/6/2019 FAIL
(6-6-19) Refer to the circled items in the plan intake checklist. Resolve each item as directed. CJW
Application received  6/5/2019 DONE
Application submitted via PDS Online on Jun 5 2019 12:51PM