BLD-Final | 12/9/2019 | 12/10/2019 | 12/10/2019 | P | PASS |
Tony Young
|
|
|
Building final. Please call Nic a half hour before inspection. Thanks, Phone #: ###-#### Inspection requested via web by Nic Van Diepen
|
DOC - Permit Finaled | 12/10/2019 | 12/10/2019 | 12/10/2019 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 12/9/2019 | 12/9/2019 | 12/9/2019 | P | PART |
Tony Young
|
|
|
Building final. Please call Nic a half hour before inspection. Thanks, Phone #: ###-#### Inspection requested via web by Nic Van Diepen// needs fire caulking
|
Zoning Approval | 12/6/2019 | 12/6/2019 | 12/6/2019 | | DONE |
Leon Letson
|
|
|
|
BLD-Energy code compliance | 12/4/2019 | 12/5/2019 | 12/5/2019 | A | DONE |
Tony Young
|
|
|
Crawl space insulation inspection. Thanks, Phone #: ###-#### Inspection requested via web by Nic Van Diepen
|
BLD-Other | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | PASS |
Tony Young
|
|
|
Attic drywall inspection. Phone #: ###-#### Inspection requested via web by Ed Kron
|
BLD-Conference | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | PASS |
Tony Young
|
|
|
drywall seperation; Phone #: ###-####
|
BLD-Energy code compliance | 10/14/2019 | 10/15/2019 | 10/15/2019 | A | PASS |
Tony Young
|
|
|
Wall insulation inspection. Thanks, Phone #: ###-#### Inspection requested via web by Nic Van Diepen
|
BLD-Framing/Rough-in | 10/11/2019 | 10/14/2019 | 10/14/2019 | A | PART |
Tony Young
|
|
|
Framing and airseal inspection. Please call Nic a half hour before inspection. Thanks, Phone #: ###-#### Inspection requested via web by Nic Van Diepen,, ok to insulate,, minor truss brace fixes needed
|
BLD-Framing/Rough-in | 10/11/2019 | 10/11/2019 | 10/11/2019 | P | PART |
Tony Young
|
|
|
Framing and airseal inspection. Please call Nic a half hour before inspection. Thanks, Phone #: ###-#### Inspection requested via web by Nic Van Diepen// ,, ok to insulate.. minor corrections on trusses
|
BLD-Framing/Rough-in | 9/20/2019 | 9/20/2019 | 9/20/2019 | P | PASS |
Tony Young
|
|
|
Shear inspection. Please call Nic a half hour before inspection. Thanks Phone #: ###-#### Inspection requested via web by Nic Van Diepen
|
BLD-Wall cover | 9/20/2019 | 9/20/2019 | 9/20/2019 | P | PART |
Tony Young
|
|
|
Truss party wall sheetrock inspection. Please call Nic a half hour before inspection. Thanks Phone #: ###-#### Inspection requested via web by Nic Van Diepen// work in progress,, ok
|
BLD-Wall Bracing | 9/9/2019 | 9/9/2019 | 9/9/2019 | P | PART |
Tell Riley
|
|
|
Party wall inspection. Please call Nic a half hour before inspection. Thanks, Phone #: ###-#### Inspection requested via web by Nic Van Diepen//party wall construction ok per plans//
|
BLD-Footing | 8/15/2019 | 8/15/2019 | 8/15/2019 | P | PART |
Tony Young
|
|
|
Derik Phone #: ###-####,, work in progress,, ok
|
BLD-Footing | 8/14/2019 | 8/15/2019 | 8/15/2019 | A | NR |
Tony Young
|
|
|
Derik Phone #: ###-####
|
OVERRIDE | | | 8/13/2019 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/13/2019 | | DONE |
|
|
|
|
Telephone call | | | 8/13/2019 | | DONE |
|
|
|
called Steve-he was out so talked to LInda-she will let Steve know that all 4 townhouses are ready and let him know how much is owed
|
Issue PAID IN FULL permit | | | 8/13/2019 | | DONE |
|
|
|
|
Plan assigned to (J_N) | 7/12/2019 | | 8/13/2019 | | DONE |
Jenny Nelson
|
|
|
07/31 townhouses L2 Paper. 1st complete 7/25, UL or GA #, code year, failed DR
|
Routing - MECHANICAL | 8/13/2019 | | 8/13/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 8/13/2019 | | 8/13/2019 | | PASS |
Jenny Nelson
|
|
|
|
Case Summary (BLD) | | | 8/13/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/13/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 8/13/2019 | | DONE |
|
|
|
Need
RP
DO NOT ISSUE WITHOUT BLD19-02593
|
Routing - Design Review | 8/6/2019 | | 8/6/2019 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLANNING | 7/12/2019 | | 8/6/2019 | | PASS |
Leon Letson
|
|
|
|
Plan resubmittals received | | | 8/5/2019 | | DONE |
|
|
|
Two copies each of full set of plans and manual j stamped and taken to plan reviewer
|
1st review completed | | | 7/25/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 7/23/2019 | | 7/25/2019 | | FAIL |
Jenny Nelson
|
|
|
UL or GA #, code year
|
Routing - MECHANICAL | 7/12/2019 | | 7/23/2019 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 7/12/2019 | 7/15/2019 | 7/15/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 7/12/2019 | | 7/15/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 7/12/2019 | | 7/15/2019 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/12/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/12/2019 | | DONE |
|
|
|
|
Intake Approval | | | 7/12/2019 | | PASS |
|
|
|
|
Application received | | 7/12/2019 | | | |
|
|
|
|
Routing - Design Review | 7/18/2019 | | | | FAIL |
|
|
|
As a condition of approval, the appliant was required to flip one of the units within each duplex so the garage doors are separated from one another to avoid garage domination. (DRH18-00090 and DRH18-00512).
|