BLD-Final | 11/27/2019 | 11/29/2019 | 11/29/2019 | P | NR |
Jim Storey
|
|
|
Randal Phone #: ###-#### need cdhd sign off// ele temp tco/ special insp. close out report.
|
FIRE-Final Inspection | 11/27/2019 | 11/29/2019 | 11/29/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Card signed. Randal Phone #: ###-####
|
FIRE-Final Inspection | 11/27/2019 | 11/27/2019 | 11/27/2019 | P | FAIL |
Troy Cobbley
|
|
|
Provide small documents, mount the K class fire extinguisher, provide emergency lights and repair the exit sign in the back kitchen area, provide building address as discussed.
Randy Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/25/2019 | 11/25/2019 | 11/25/2019 | P | PASS |
Tell Riley
|
|
|
Randall Phone #: ###-####
|
Inspection Record Card- Bld | | | 11/18/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 11/12/2019 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/12/2019 | | DONE |
|
|
|
plan mod approved and paid
|
Permit Ready to Issue | | | 11/12/2019 | | DONE |
|
|
|
**PLAN MOD - DO NOT REISSUE**
|
Plan assigned to (JG) | 10/24/2019 | 10/24/2019 | 11/7/2019 | | PASS |
Javier Guzman
|
|
|
11/11 plan mod McDonald's
|
Routing - PLAN CHECK | 10/30/2019 | | 11/7/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing - FIRE | 10/30/2019 | 10/30/2019 | 11/6/2019 | | PASS |
Erika Akin
|
|
|
Attached revised comments to case for plan mod
|
Routing Off Site - C.D.H | 10/30/2019 | | 11/6/2019 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by Central District Health Department Sam Grossklaus
|
Routing PW Environmental | 10/30/2019 | | 11/5/2019 | | PASS |
Rick Christenson
|
|
|
|
Routing - Design Review | 10/30/2019 | | 10/30/2019 | | PASS |
Katelyn Menuge
|
|
|
Exhaust fan will be screened by building parapet.
|
Routing - MECHANICAL | 10/30/2019 | | 10/30/2019 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 10/30/2019 | | 10/30/2019 | | PASS |
Morgan Webb
|
|
|
REPLACING FRYER WITH A LARGER CAPACITY FRYER
|
BLD-Framing/Rough-in | 10/24/2019 | 10/24/2019 | 10/24/2019 | P | PART |
Tell Riley
|
|
|
Randell Phone #: ###-####//ok when blocking added per structural detail//discussed onsite//front entry upper walls//
|
Plan Modification Accepted | | | 10/24/2019 | | DONE |
|
|
|
Replacing existing older commercial fryer with a newer larger capacity commercial fryer in the kitchen
|
BLD-Framing/Rough-in | 10/22/2019 | 10/22/2019 | 10/22/2019 | P | PART |
Tell Riley
|
|
|
Randall Phone #: ###-####//framing in progress//no issues//ok to continue//
|
BLD-Other | 10/18/2019 | 10/18/2019 | 10/18/2019 | P | PART |
Tell Riley
|
|
|
nailing for framing // Randall Rosher ###-####//shear nailing for parapet walls ok//
|
Issue PAID IN FULL permit | | | 9/19/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/19/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 9/16/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 9/16/2019 | | DONE |
|
|
|
MET CDURANT@TROUTARCHITECTS.COM & STROUT@TROUTARCHITECTS.COM
RP
GC FORM
REVISED VALUE
|
Plan assigned to (JG) | 8/14/2019 | 8/14/2019 | 9/14/2019 | | PASS |
Javier Guzman
|
|
|
09/16 2nd rev, L3 McDonalds Orchard ePlan
|
Routing - PLAN CHECK | 9/10/2019 | | 9/14/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 9/10/2019 | | 9/14/2019 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by KPFF Engineer
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/14/2019 | | DONE |
|
|
|
|
Routing - Design Review | 9/10/2019 | | 9/10/2019 | | PASS |
Katelyn Menuge
|
|
|
DRH19-00201
|
Route to Impact Fee Review | 9/5/2019 | 9/8/2019 | 9/6/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 8/14/2019 | 8/14/2019 | 9/5/2019 | | PASS |
Mark Scharfen
|
|
|
09.05-completed fire review. Uploaded rev_fire 09.05.2019.pdf
|
1st review completed | | | 9/5/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 8/14/2019 | | 9/3/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing - Erosion and Sediment | 8/28/2019 | | 8/29/2019 | | PASS |
Michael Zawacki
|
|
|
Prime contractor to act as RP.
|
Routing Off Site - STRUCTURAL | 8/14/2019 | | 8/28/2019 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by KPFF Engineer
|
Routing PW Environmental | 8/15/2019 | | 8/19/2019 | | PASS |
Rick Christenson
|
|
|
|
Routing - MECHANICAL | 8/14/2019 | | 8/19/2019 | | PASS |
Troy James
|
|
|
No mechanical work shown
|
Routing - PLANNING | 8/14/2019 | | 8/16/2019 | | PASS |
David Moser
|
|
|
|
Routing - Addressing | 8/14/2019 | | 8/15/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/14/2019 | | 8/15/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLUMBING | 8/14/2019 | | 8/15/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Design Review | 8/14/2019 | | 8/15/2019 | | FAIL |
Katelyn Menuge
|
|
|
Please provide 7 required bicycle parking stalls.
|
Intake Approval | | | 8/12/2019 | | PASS |
|
|
|
|
Application received | | | 8/2/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 2 2019 8:25AM
|