BLD-Framing/Rough-in | 7/9/2020 | 7/10/2020 | 7/10/2020 | A | PASS |
Brandon Shaw
|
|
|
OK to sheet roof deck and cover front porch...
|
BLD-Wall Bracing | 9/27/2019 | 9/27/2019 | 9/27/2019 | P | PASS |
Tell Riley
|
|
|
Dan Phone #: ###-####
|
BLD-Energy code compliance | 9/24/2019 | 9/25/2019 | 9/25/2019 | A | PASS |
Tell Riley
|
|
|
Dan Phone #: ###-####//ok to cover//call for shear when ready//
|
BLD-Framing/Rough-in | 9/24/2019 | 9/25/2019 | 9/25/2019 | A | PASS |
Tell Riley
|
|
|
Dan Phone #: ###-####//corrections made//
|
BLD-Framing/Rough-in | 9/23/2019 | 9/23/2019 | 9/23/2019 | P | NR |
Tell Riley
|
|
|
Daniel Phone #: ###-####//needs electrical inspection//need to add studs at locations discussed//need to add shear blocks//call in for framing after electrical passes//
|
Routing Walk-In (BLD) | 9/16/2019 | 9/16/2019 | 9/16/2019 | A | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 9/16/2019 | | 9/16/2019 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 9/16/2019 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 9/16/2019 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/16/2019 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 9/16/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/16/2019 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 8/14/2019 | 8/14/2019 | 8/14/2019 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 8/14/2019 | 8/14/2019 | 8/14/2019 | A | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 8/14/2019 | | 8/14/2019 | | FAIL |
Brian McGowan
|
|
|
Need updated engineering, section/detail at front porch/entry/living room
|
1st review completed | | | 8/14/2019 | | FAIL |
Brian McGowan
|
|
|
|
Application received | | 8/14/2019 | | | |
|
|
|
|