BLD-Final | 3/2/2020 | 3/3/2020 | 3/3/2020 | A | PASS |
Mike Jordan
|
|
|
Jeff Phone #: ###-####
|
DOC - Permit Finaled | 3/3/2020 | 3/3/2020 | 3/3/2020 | P | PASS |
Mike Jordan
|
|
|
All issues were resolved.
|
BLD-Blower Door Test Results | 3/3/2020 | 3/3/2020 | 3/3/2020 | A | DONE |
Mike Jordan
|
|
|
5.5
|
BLD-Final | 2/27/2020 | 2/28/2020 | 2/28/2020 | A | NR |
Tell Riley
|
|
|
Jeff Phone #: ###-####//install attic access door//insulate crawl access door//seal penetrations through garage separation wall//provide blower door test//CN posted//
|
BLD-Energy code compliance | 12/5/2019 | 12/6/2019 | 12/6/2019 | A | PASS |
Tell Riley
|
|
|
Jeff Phone #: ###-####
|
BLD-Framing/Rough-in | 12/4/2019 | 12/4/2019 | 12/4/2019 | P | PASS |
Tell Riley
|
|
|
Jeff Phone #: ###-####//corrections made//engineering provided for trusses installed backwards--gussetts nailing and added webs installed per engineering//ok to insulate//
|
BLD-Framing/Rough-in | 12/2/2019 | 12/3/2019 | 12/3/2019 | A | FAIL |
Tell Riley
|
|
|
jeff Phone #: ###-####//CN posted//need to fix truss clip north wall//add stud to beam pocket per engineering//add strap to portal frame on interior side per detail//provide engineered truss letter or fix for truss bearing points not lining up on wall per truss plans//
|
BLD-Wall Bracing | 11/4/2019 | 11/4/2019 | 11/4/2019 | P | PASS |
Dave Hannah
|
|
|
shear // Jeff Phone #: ###-####
|
BLD-Footing | 10/7/2019 | 10/7/2019 | 10/7/2019 | P | PASS |
Tell Riley
|
|
|
James Phone #: ###-####//ok per plans//
|
CHANGE STATUS TO (ISS) | | | 10/7/2019 | | DONE |
|
|
|
plan mod
|
OVERRIDE | | | 10/4/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 10/1/2019 | 10/1/2019 | 10/4/2019 | | DONE |
Jenny Nelson
|
|
|
10/07 plan mod
|
Routing - PLAN CHECK | 10/1/2019 | | 10/4/2019 | | PASS |
Jenny Nelson
|
|
|
1 hour plan mod fee
|
Permit Ready to Issue | | | 10/4/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 10/1/2019 | | DONE |
|
|
|
struc. engineering for porches
|
OVERRIDE | | | 9/20/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 8/29/2019 | 8/29/2019 | 9/20/2019 | | DONE |
Jenny Nelson
|
|
|
09/11 sfd L1 ePlan. 1st complete 9/10, covered patio engineering
|
Issue PAID IN FULL permit | | | 9/20/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/20/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/20/2019 | | 9/20/2019 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/20/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 9/20/2019 | | DONE |
|
|
|
met
|
1st review completed | | | 9/10/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 8/29/2019 | | 9/10/2019 | | FAIL |
Jenny Nelson
|
|
|
|
Routing - PLANNING | 8/29/2019 | | 9/3/2019 | | PASS |
Ethan Mansfield
|
|
|
|
Route to Impact Fee Review | 8/29/2019 | 9/1/2019 | 8/30/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 8/29/2019 | | 8/30/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/29/2019 | | 8/30/2019 | | PASS |
Morgan Webb
|
|
|
WEST BOISE SEWER DISTRICT
|
Routing - MECHANICAL | 8/29/2019 | | 8/30/2019 | | PASS |
Troy James
|
|
|
|
Intake Approval | | | 8/29/2019 | | FAIL |
|
|
|
no corrections form Brittany's fail
|
Intake Approval | | | 8/29/2019 | | FAIL |
|
|
|
they fixed the manual J's but didn't upload the ele sheet
|
Intake Approval | | | 8/29/2019 | | PASS |
|
|
|
|
Intake Approval | | | 8/26/2019 | | FAIL |
|
|
|
Manual J must have either address or lot, block and subdivision on the front, please upload electrical plan sheet
|
Application received | | | 8/20/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 20 2019 12:35PM
|