Permit NumberBLD19-03315
StatusFinaled
Name COLTRIN MIKE A
Site Address 1196 S LIZASO AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
PLAN MOD- 9/24/19- (Using a footing and stem wall for the Foundation instead of a monolithic pour). Permit to construct a 1200 sq ft detached Garage with 14' tall walls. Engineering has been provided. Separate electrical permit is required. All work to be done as per plans, notes and provided engineering. ***BJM***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/6/20202/10/20202/10/2020APASS
DetailsMike Jordan
Kim called to resch final for Monday 2/10 AM// Phone #: ###-#### Inspection requested via web by Kim Stolworthy
DOC - Permit Finaled2/10/20202/10/20202/10/2020PPASS
DetailsMike Jordan
BLD-Wall cover11/8/201911/8/201911/8/2019PPASS
DetailsDave Hannah
Need insulation inspection so we can install Sheetrock.
Thanks Phone #: ###-#### Inspection requested via web by Kim Stolworthy
BLD-Framing/Rough-in11/3/201911/4/201911/4/2019PPASS
DetailsMike Jordan
Please call MIke at ###-#### 30 minutes prior so he can meet you there. Thanks Phone #: ###-#### Inspection requested via web by Kim Stolworthy
BLD-Framing/Rough-in10/27/201910/28/201910/28/2019PCANC
DetailsMike Jordan
Please call 30 minutes prior so I can meet you at the residence. Mike Coltrin ###-#### Phone #: ###-#### Inspection requested via web by Kim Stolworthy
BLD-Wall Bracing10/28/201910/28/201910/28/2019PPASS
DetailsMike Jordan
Please call 30 minutes prior so I can meet you at the residence. Mike Coltrin ###-#### Phone #: ###-#### Inspection requested via web by Kim Stolworthy
BLD-Foundation10/2/201910/3/201910/3/2019APASS
DetailsMike Jordan
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru
BLD-Footing10/1/201910/2/201910/2/2019PPART
DetailsMike Jordan
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru
BLD-Footing9/26/20199/27/20199/27/2019PPASS
DetailsTell Riley
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru//cancel per Ricardo//
Inspection Record Card- Bld  9/25/2019 DONE
CHANGE STATUS TO (ISS)  9/25/2019 DONE
OVERRIDE  9/24/2019  
Plan assigned to (BJM)9/20/20199/20/20199/24/2019 DONE
DetailsBrian McGowan
Routing - PLAN CHECK9/20/2019 9/24/2019 PASS
DetailsBrian McGowan
Case Summary (BLD)  9/24/2019 DONE
DetailsBrian McGowan
Permit Ready to Issue  9/24/2019 DONE
plan mod approved
DO NOT RE ISSUE
Telephone call  9/24/2019 DONE
Spoke with Mike to inform him the plan mod is ready and what fees are due.
Plan Modification Accepted  9/20/2019 DONE
plan mod-changing from mono pour to footings and foundation-took to BJM
OVERRIDE  9/12/2019  
Routing Walk-In (BLD)9/12/20199/12/20199/12/2019APASS
DetailsBrian McGowan
Permit Ready to Issue  9/12/2019 DONE
Issue PAID IN FULL permit  9/12/2019 DONE
Routing - PLANNING9/12/2019 9/12/2019 PASS
DetailsSue Cummings
Routing - PLAN CHECK9/12/2019 9/12/2019 PASS
DetailsBrian McGowan
Case Summary (BLD)  9/12/2019 DONE
DetailsBrian McGowan
Inspection Record Card- Bld  9/12/2019 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  9/12/2019 DONE
DetailsBrian McGowan
Routing Walk-In (BLD)9/10/20199/10/20199/10/2019PFAIL
DetailsJosh Bogle
needed 2nd copy of prints, Planning sign-off, garage door headers
Routing Walk-In (Zoning)8/27/20198/27/20198/27/2019PFAIL
DetailsStephanie Leonard
Need to obtain a CZC (acc. structure over 1,000 SF) prior to building permit
Routing - PLAN CHECK8/27/2019 8/27/2019 FAIL
DetailsJosh Bogle
1st review completed  8/27/2019 FAIL
Application received 8/27/2019