BLD-Final | 2/6/2020 | 2/10/2020 | 2/10/2020 | A | PASS |
Mike Jordan
|
|
|
Kim called to resch final for Monday 2/10 AM// Phone #: ###-#### Inspection requested via web by Kim Stolworthy
|
DOC - Permit Finaled | 2/10/2020 | 2/10/2020 | 2/10/2020 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Wall cover | 11/8/2019 | 11/8/2019 | 11/8/2019 | P | PASS |
Dave Hannah
|
|
|
Need insulation inspection so we can install Sheetrock. Thanks Phone #: ###-#### Inspection requested via web by Kim Stolworthy
|
BLD-Framing/Rough-in | 11/3/2019 | 11/4/2019 | 11/4/2019 | P | PASS |
Mike Jordan
|
|
|
Please call MIke at ###-#### 30 minutes prior so he can meet you there. Thanks Phone #: ###-#### Inspection requested via web by Kim Stolworthy
|
BLD-Framing/Rough-in | 10/27/2019 | 10/28/2019 | 10/28/2019 | P | CANC |
Mike Jordan
|
|
|
Please call 30 minutes prior so I can meet you at the residence. Mike Coltrin ###-#### Phone #: ###-#### Inspection requested via web by Kim Stolworthy
|
BLD-Wall Bracing | 10/28/2019 | 10/28/2019 | 10/28/2019 | P | PASS |
Mike Jordan
|
|
|
Please call 30 minutes prior so I can meet you at the residence. Mike Coltrin ###-#### Phone #: ###-#### Inspection requested via web by Kim Stolworthy
|
BLD-Foundation | 10/2/2019 | 10/3/2019 | 10/3/2019 | A | PASS |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru
|
BLD-Footing | 10/1/2019 | 10/2/2019 | 10/2/2019 | P | PART |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru
|
BLD-Footing | 9/26/2019 | 9/27/2019 | 9/27/2019 | P | PASS |
Tell Riley
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru//cancel per Ricardo//
|
Inspection Record Card- Bld | | | 9/25/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/25/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 9/24/2019 | | |
|
|
|
|
Plan assigned to (BJM) | 9/20/2019 | 9/20/2019 | 9/24/2019 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 9/20/2019 | | 9/24/2019 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 9/24/2019 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 9/24/2019 | | DONE |
|
|
|
plan mod approved
DO NOT RE ISSUE
|
Telephone call | | | 9/24/2019 | | DONE |
|
|
|
Spoke with Mike to inform him the plan mod is ready and what fees are due.
|
Plan Modification Accepted | | | 9/20/2019 | | DONE |
|
|
|
plan mod-changing from mono pour to footings and foundation-took to BJM
|
OVERRIDE | | | 9/12/2019 | | |
|
|
|
|
Routing Walk-In (BLD) | 9/12/2019 | 9/12/2019 | 9/12/2019 | A | PASS |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 9/12/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/12/2019 | | DONE |
|
|
|
|
Routing - PLANNING | 9/12/2019 | | 9/12/2019 | | PASS |
Sue Cummings
|
|
|
|
Routing - PLAN CHECK | 9/12/2019 | | 9/12/2019 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 9/12/2019 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 9/12/2019 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/12/2019 | | DONE |
Brian McGowan
|
|
|
|
Routing Walk-In (BLD) | 9/10/2019 | 9/10/2019 | 9/10/2019 | P | FAIL |
Josh Bogle
|
|
|
needed 2nd copy of prints, Planning sign-off, garage door headers
|
Routing Walk-In (Zoning) | 8/27/2019 | 8/27/2019 | 8/27/2019 | P | FAIL |
Stephanie Leonard
|
|
|
Need to obtain a CZC (acc. structure over 1,000 SF) prior to building permit
|
Routing - PLAN CHECK | 8/27/2019 | | 8/27/2019 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 8/27/2019 | | FAIL |
|
|
|
|
Application received | | 8/27/2019 | | | |
|
|
|
|