Permit Information
Permit NumberBLD19-03484
StatusIssued
Name KB FINANCIAL LLC
Site Address 2322 W HILL TERRACE LN
Project NameNORTH HILL SUBDIVISION
Customer NumberBLD19-03482-03485
ePlanReview 
Description
**W.U.I. FOOTHILLS ZONE A CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR SIDING REQUIRED** **PRESCRIPTIVE ENERGY REQUIREMENTS** **FOUR TOWNHOMES UNDER EPLAN BLD19-03482** Permit for the construction of a new 1500 sq. ft., (first story garage, second story 1500 sq ft.) townhouse with 2 bedrooms, 2 bathrooms, approximately and a 668 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. ***Sprinkelrs not required***LGM
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Concrete4/30/20204/30/20204/30/2020PPART
DetailsTony Young
screened // Austin Phone #: ###-####// upper foundation wall
BLD-Conference4/24/20204/27/20204/27/2020APASS
DetailsTony Young
want to discuss entry stairs and confirm framer fixes are acceptable Phone #: ###-#### Inspection requested via web by ron beckman
BLD-Concrete4/22/20204/23/20204/23/2020APASS
DetailsTony Young
screened - rebar // Austin Phone #: ###-####
upper footings ok,, soils ok via e-mail
BLD-Energy code compliance4/21/20204/22/20204/22/2020APASS
DetailsTony Young
wall insulation in, would like to sheetrock Phone #: ###-#### Inspection requested via web by ron beckman
BLD-Wall cover4/19/20204/20/20204/20/2020APASS
DetailsTony Young
Townhome has been airsealed, would like to install wall insulation and sheetrock Phone #: ###-#### Inspection requested via web by ron beckman// frame ok,, ok to insulate
BLD-Energy code compliance4/19/20204/20/20204/19/2020ACANC
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by ron beckman Inspection cancelled from web by: ron beckman
BLD-Conference4/16/20204/16/20204/16/2020PPART
DetailsTony Young
Would like fire wall framer fixes inspected and would like to insulate part of garage ceiling so garage doors can be installed to secure building Phone #: ###-#### Inspection requested via web by ron beckman// ok after sealing gaps in firewall,, ok to insulate garage areas
BLD-Wall Bracing4/2/20204/3/20204/3/2020APASS
DetailsDave Hannah
additional hold downs were installed 4/2/2020. Would like to cover exterior walls for stucco prep Phone #: ###-#### Inspection requested via web by ron beckman
BLD-Wall Bracing3/26/20203/27/20203/30/2020PPART
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by ron beckman nailing of pannals ok but hold dows/bolting of portel frame panals not done
BLD-Foundation3/18/20203/18/20203/18/2020PPASS
DetailsDave Hannah
rebar // Austin Phone #: ###-####
BLD-Footing3/6/20203/9/20203/9/2020ACANC
DetailsTony Young
austin Phone #: ###-####// wrong permit called in
BLD-Wall Bracing3/3/20203/4/20203/4/2020APART
DetailsTony Young
Ron Phone #: ###-####,, upper firewalls ok
BLD-Framing/Rough-in2/21/20202/21/20202/21/2020PPART
DetailsTony Young
Ron Phone #: ###-####,, pony wall ok to cover
BLD-Wall Bracing2/18/20202/18/20202/19/2020PPART
DetailsTony Young
Ron Phone #: ###-####// lower garage firewall ok
BLD-Foundation1/7/20201/8/20201/8/2020APART
DetailsTony Young
Austin Phone #: ###-####,, work in progress on upper foundation walls
BLD-Foundation12/20/201912/23/201912/23/2019APART
DetailsTony Young
Austin Phone #: ###-####// upper level of home footings
BLD-Foundation12/5/201912/6/201912/6/2019APASS
DetailsTony Young
Austin Phone #: ###-####
BLD-Foundation12/4/201912/5/201912/6/2019PPART
DetailsTony Young
Austin Phone #: ###-####
BLD-Foundation11/20/201911/21/201911/21/2019APART
DetailsTell Riley
Austin Phone #: ###-####//garage portion only//ok per plans//discussed cold weather requirements--will get blankets onsite// WIP//footings only//
PubWorks Subgrade Approval11/8/201911/8/201911/8/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Meeting  10/23/2019 DONE
Email was sent to Leon to clarify if all 4 permits needed zoning inspection- per Leon in person conversation, No zonong inpections on none of the permits 19-03485, 19-03484, 19-03483 and 19-03482
Issue PAID IN FULL permit  10/23/2019 DONE
Inspection Record Card- Bld  10/23/2019 DONE
OVERRIDE  10/22/2019  
Plan assigned to (J_N)10/18/201910/18/201910/22/2019 DONE
DetailsJenny Nelson
Routing PW Grading-Hillside10/21/2019 10/22/2019 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
PLANS/APPL TAKEN TO FRONT DESK  10/22/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  10/22/2019 DONE
4 TOWNHOMES - ISSUE WITH BLD19-03###-####3, 03485
1st review completed  10/21/2019 DONE
DetailsJenny Nelson
Routing - Erosion and Sediment9/26/2019 10/21/2019 PASS
DetailsMichael Zawacki
Please refer to ESC19-01248 for site
Plan assigned to (RDP)9/26/20199/26/201910/18/2019 DEFR
DetailsRob Patrick
10/15 sfd L2 PAPER
Routing - PLAN CHECK9/26/2019 10/18/2019 PASS
DetailsJenny Nelson
Routing - PUBLIC WORKS9/26/2019 10/18/2019 PASS
DetailsMorgan Webb
Routing PW Grading-Hillside10/4/2019 10/4/2019 FAIL
DetailsMelissa Jannusch
see changemarks in ePlan
Route to Impact Fee Review9/26/20199/29/201910/2/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Routing - PLANNING9/26/2019 10/2/2019 PASS
DetailsLeon Letson
Routing - MECHANICAL9/26/2019 9/30/2019 PASS
DetailsTroy James
Routing - FIRE9/26/20199/26/20199/27/2019 PASS
DetailsLee G Meredith
Fire code review passed. Sprinklers not required. No comments.
Routing - Addressing9/26/2019 9/27/2019 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN TECH  9/26/2019 DONE
Intake Approval  9/26/2019 PASS
Recd Pcfee & Taken To Pln CK  9/26/2019 DONE
Plans ACCEPTED BY PLAN TECH  9/23/2019 FAIL
All floor plans need to match the site plan - site plan shows 2 townhomes staggered from the other two.
Application received  9/8/2019 DONE
Application submitted via PDS Online on Sep 8 2019 3:06PM