ELE-Aging Inspection | 6/5/2020 | 6/5/2020 | 6/11/2020 | | PEND |
Daryl DeGrange
|
|
|
Spoke with homeowner, job still under construction, getting close.
|
ELE-Aging Inspection | 3/6/2020 | 3/6/2020 | 3/11/2020 | | DONE |
Mark Moncarr
|
|
|
If more time is needed to finish space above garage, please call and request an electrical extension.
|
ELE-Aging Inspection | 12/6/2019 | 12/6/2019 | 12/9/2019 | | DONE |
Mark Moncarr
|
|
|
2nd meter installed on structure. Fire rating allows 2nd meter on single structure. No final inspection has been done inside unit itself. Please call with progress on work being done.
|
Permanent Service | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | PASS |
Mark Moncarr
|
|
|
Cooper Phone #: ###-#### There is a 1 hr fire barrier between units. Need 2nd meter. p/s u/g n ok
|
Final | 8/22/2019 | 8/23/2019 | 8/23/2019 | A | CANC |
Mark Moncarr
|
|
|
Sharrie Phone #: ###-####
|
Meeting | | | 8/23/2019 | | DONE |
|
|
|
per Mark Moncarr ok to change the address to the ADU ( this was pulled on the main house while ADU was getting approved )
|
Final | 5/31/2018 | 6/1/2018 | 6/1/2018 | A | CANC |
Mark Moncarr
|
|
|
Cooper Phone #: ###-#### Should have been a RI and service.
|
Rough-In Permanent Service | 6/1/2018 | 6/1/2018 | 6/1/2018 | P | PASS |
Mark Moncarr
|
|
|
Ok cover. Service already energized. A second meter needed for space above garage. 2 meter pack on S side of house.
|
Conference | 10/5/2017 | 10/6/2017 | 10/6/2017 | A | DONE |
Mark Moncarr
|
|
|
Cooper Phone #: ###-#### Rough-in above garage was already done. Everything looked up to code.
|
Electrical Rough-In | 10/6/2017 | 10/6/2017 | 10/6/2017 | A | PASS |
Mark Moncarr
|
|
|
Ok cover area above garage. Living space, kitch, and bed.
|
Application received | | | 9/29/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/29/2017 | | DONE |
|
|
|
|