Final | 7/22/2020 | 7/23/2020 | 7/23/2020 | A | PASS |
Tom Saunders
|
|
|
FINAL Phone #: ###-#### Inspection requested via web by Zane Robertson... job complete...card signed...ok to final
|
Final | 7/6/2020 | 7/7/2020 | 7/7/2020 | A | PART |
Tom Saunders
|
|
|
Left for final: hand dryers, pool rm-GFCI protect lighting,panel cover, activity rm ceiling, tree moved/removed infront of service disconnects
|
Final | 7/2/2020 | 7/6/2020 | 7/6/2020 | A | PART |
Eric Story
|
|
|
final Phone #: ###-#### Inspection requested via web by Zane Robertson Roof top units and comm room/Elevator cab lights need swapped to 15 amp and need access to pit for inspection
|
Final | 7/1/2020 | 7/2/2020 | 7/2/2020 | P | CANC |
Tom Saunders
|
|
|
Phone #: ###-#### >> Inspection requested via web by Zane Robertson Inspection cancelled from web by: Zane Robertson
|
Final | 6/30/2020 | 7/1/2020 | 7/1/2020 | P | PART |
Tom Saunders
|
|
|
Downstairs final Phone #: ###-#### Inspection requested via web by Zane Robertson...
OK for final...game rm, activity rm walls, downstairs offices, entry, and reception
For final...rooftop units, low volt rm, exterior recps, bathroom outlets dwnstairs, hand dryers-all baths, pool rm, breakroom, fire riser rm, panel schedules, and parking lot lights
Building still needs sign and elevator inspections...outside contractors scope of work
|
Final | 6/29/2020 | 6/30/2020 | 6/30/2020 | P | PART |
Tom Saunders
|
|
|
Upstairs final inspection Phone #: ###-#### Inspection requested via web by Zane Robertson ... patial final for upstairs...ok hand dryers will need done by final...safed off LV rack needs bonded by final
|
Final | 6/26/2020 | 6/29/2020 | 6/29/2020 | A | NR |
Daryl DeGrange
|
|
|
Upstairs final inspection Phone #: ###-#### Inspection requested via web by Zane Robertson Not ready at this time, Hand dyers and dishwasher not installed leaving MC exposed with out being terminated in j-box. GFIC receptacle installed behind refrigertor leaving it not readily accessible. Office area with out power. panel dirtectory for upstairs area not complete.
|
Electrical Rough-In | 6/18/2020 | 6/19/2020 | 6/19/2020 | A | PASS |
Tom Saunders
|
|
|
First floor above grid inspection. Phone #: ###-#### Inspection requested via web by Zane Robertson..grid ok to cover
|
Electrical Rough-In | 6/14/2020 | 6/15/2020 | 6/15/2020 | A | PASS |
Tom Saunders
|
|
|
upstairs above grid inspection. Phone #: ###-#### Inspection requested via web by Zane Robertson...2nd floor grid ok to cover
|
Permanent Service | 4/16/2020 | 4/16/2020 | 4/16/2020 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Zane Robertson... p/s u/g new ok...6 meters needed
|
Rough-In Permanent Service | 4/13/2020 | 4/13/2020 | 4/13/2020 | P | NR |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Zane Robertson... not ready for service...panels need completion and AFC label required for service...110.9
|
Electrical Rough-In | 4/13/2020 | 4/13/2020 | 4/13/2020 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Zane Robertson... rough in of walls and hard lids for 1st floor ok... excluding - service rm, elevator room, and pool panel rm which is someone elses scope of work
|
Electrical Rough-In | 4/8/2020 | 4/8/2020 | 4/8/2020 | P | PASS |
Tom Saunders
|
|
|
Soffit inspection Phone #: ###-#### Inspection requested via web by Zane Robertson..
exterior soffits and first entry lid ok to cover meter pac and exterior service ok...interior panels need made up for service completion...uffer under stairs discussed LV racking system bonding and main waterline for fire sprinkler system bond
|
Electrical Rough-In | 4/6/2020 | 4/6/2020 | 4/6/2020 | P | PASS |
Rock A. Hudson
|
|
|
Rough in for second floor Phone #: ###-#### Inspection requested via web by Zane Robertson Discussed if medical wiring method needed, tamper requirements, no lighting below 7'6", commissioning report for lighting control system. Contractor ran medical grade wiring method in all rooms for therapy. Confirmed city approved set of prints on site. Level 2 walls and hardlids rough in ok cover.
|
Issue PAID IN FULL permit | | | 1/7/2020 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 1/7/2020 | | DONE |
|
|
|
This permit was created on the web by Zane Robertson
|
First Notice | 7/23/2020 | 7/23/2020 | | | |
Tom Saunders
|
|
|
|