Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberESC17-01241
StatusFinaled
Name MICHAEL MCHARGUE
Site Address 9964 W OVERLAND RD
Project NameUnion Square Corner Retail
Customer Number 
ePlanReviewNo
Description
Retail Cold Shell to be built within the existing Union Square commercial area. Prevent trackout and fugitve dust, install sediment filter bags on any receiving strom drains, contain trash, and have spill kit onsite. Perimeter wattles and silt fence may not be required if there is existing vegetation and curbing surround area. Site preparation inspection required.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection12/3/201812/12/201812/12/2018PCANC
DetailsAndy J. Long
Site Final12/3/201812/3/201812/3/2018PDONE
DetailsMike Jordan
DOC - Permit Finaled12/3/201812/3/201812/3/2018PPASS
DetailsMike Jordan
General Inspection12/3/201812/3/201812/3/2018 CANC
DetailsAndy J. Long
General Inspection10/18/201810/18/201810/18/2018PPASS
DetailsMichael Zawacki
Exterior of building and most of parking lot work complete. Area still need to be landscaped. Bare area are belo grade of sidewalk.
General Inspection9/10/20189/10/20189/10/2018 PASS
DetailsMichael Zawacki
Entire area is below grade of parking lot. Dumpster on site, area clean and trash free.
General Inspection7/26/20187/26/20187/27/2018 PASS
DetailsAndy J. Long
WIP progress on earthwork for landscaping. Building shell and parking lot are complete. Crew using hose to water down stockpile that is being moved. Approved.
Site Preparation6/5/20186/5/20186/5/2018PPART
DetailsMichael Zawacki
Adam Phone #: ###-####
Site is below grade of parking lot. Will need stabalized entrance, already has trackout leaving site. Water will be needed for dust control. Concrete washout needed, old dumped washout was exposed on site during prep.
Issue & PRINT permit COM  6/4/2018 DONE
Routing - Erosion and Sediment9/26/2017 9/26/2017 PASS
DetailsAndy J. Long
ESC plan with narrative and site map approved. Valid ESC team designated; site preparation inspection is required.
Application received  9/13/2017 DONE
Application submitted via PDS Online on Sep 13 2017 9:52AM