Description
This permit scope of work is to replace the existing fire alarm system. A MANUAL SYSTEM WITH AUTOMATIC DETECTION IN CORRIDORS SERVING SLEEPING AREAS, A PULL STATION, SMOKE DETECTION ABOVE THE FACP, SPRINKLER SYSTEM MONITORING, ELEVATOR RECALL AND SHUNT FUNCTIONS, F/S DAMPER AND HVAC SHUTDOWN/MONITORING SHALL BE PROVIDED AS PART OF THIS SCOPE OF WORK. IN ADDITION, SYSTEM SMOKE DETECTORS WITH SOUNDER BASES WILL BE INSTALLED TO TAKE THE PLACE OF SINGLE STATION/MULTI STATION 120V SMOKE ALARMS.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  5/15/2015 DONE
Tom Gainor and Jason Blais requested an update on when the contractor would be complete. I emailed the contractor with a request for an update.
INSP-Alarm Testing8/31/20149/3/20149/3/2014ANR
DetailsForrest France
Completed initial project walkthrough. Items noted include; adjust notification at locations marked on plans at the 3rd, 2nd and 1st floors, (cd settings, spacing, height AFF), provide WP device at a 2nd floor bathroom, relocate a/v at the 2nd floor TV room, provide SD at the 2nd floor NAC, monitor sprinkler tamper at the 1st floor elevator control, relocate a/v at the kitchen exit access, post signage at the door to the FACP room, provide lock at circut breaker, post points map per review comments, provide documents cabinet. Provide plan modification for resubmittal to reflect field changes such as deleted ID's, door mag relays, elevator hat, changed room uses, added 1st floor vestibule, new ceiling mount devices in place of wall mount, - include IP DACT in place of phone lines. Remove all non-functional devices and system components from the previous panel including MP, SD, HD, power supplies, etc. prior to final.
INSP-Alarm Testing8/26/20148/26/20148/29/2014PDEFR
DetailsForrest France
Phone #: ###-#### Inspection requested via web by Keith Olstrom
INSP-Alarm Testing8/14/20148/20/20148/19/2014PDEFR
DetailsForrest France
Rescheduled for next week per conversation with contractor.
INSP-Conference8/19/20148/19/20148/19/2014PDONE
DetailsForrest France
Regarding project inspection and testing schedule.
Miscellaneous action  7/16/2014 DONE
Stephanie Cobbley emailed to let me know she had been informed that the detector bases have independant bases form the smoke detectors. She wanted to know if there was an additional charge for the addresses and could she note them on as built drawings. I informed her that I felt the bases were part of the detector assembly so no additional charge and that as built documentation was adequate. She also stated that due to other changes, she will be submitting a plan modification in the near future.
Permit Ready to Issue  6/17/2014 DONE
DetailsChristina Prado
Issue and Print Permit  6/17/2014 DONE
DetailsChristina Prado
Inspection Record Card- Fire6/17/2014 6/17/2014 DONE
DetailsChristina Prado
Plan assigned to (Lee)6/16/2014 6/16/2014 DONE
DetailsLee G Meredith
Miscellaneous action  6/16/2014 DONE
Emailed Stephanie for use clarification on Isolation Room 128. She responded stating the room is now an office so notification and detection are not required.
1st review completed  6/16/2014 PASS
Alarm Plan Check6/16/2014 6/16/2014 PASS
DetailsLee G Meredith
PLANS TAKEN FRONT DESK ALARM  6/16/2014 DONE
Plans approved with review comments.
Application received  6/13/2014 DONE
Application submitted via PDS Online on Jun 13 2014 10:47AM