INSP-Final Inspection | 9/11/2017 | 9/12/2017 | 9/12/2017 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 9/6/2017 | 9/8/2017 | 9/8/2017 | A | FAIL |
Troy Cobbley
|
|
|
Need the overspaced pendant corrected as previously noted.
|
INSP-Sprinkler Rough-in | 8/23/2017 | 8/24/2017 | 8/24/2017 | A | PASS |
Troy Cobbley
|
|
|
Remaining piping is ok to cover. I noted one sprinkler head that is located too far from a wall/door. It will need to be relocated to a position as shown on the plans and wil be verified at the final inspection.
|
INSP-Sprinkler Rough-in | 7/25/2017 | 7/26/2017 | 7/26/2017 | A | PASS |
Troy Cobbley
|
|
|
Rough to cover inspection in the restrooms is passed. Piping can be covered.
|
Intake Approval | | | 7/19/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 7/19/2017 | | 7/19/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/19/2017 | | 7/19/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 7/19/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/19/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 7/19/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/19/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/19/2017 | | 7/19/2017 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | | 7/18/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 18 2017 4:33PM
|