INSP-Final Inspection | 6/11/2019 | 6/12/2019 | 6/12/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler ispection complete.
Call James to coordinate, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 3/12/2019 | 3/13/2019 | 3/13/2019 | A | PASS |
Jim Page
|
|
|
All tenting in place at time of inspection. All piping approved for cover.
Tenting Inspection, call Anthony if there are any issues. Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 3/12/2019 | 3/12/2019 | 3/12/2019 | A | PART |
Jim Page
|
|
|
Rough in inspection for overhead fire sprinkler piping complete, piping between conditioned spaces approved for cover. Tenting not completed at time of inspection, cover is n ot approved in tenting required areas.
|
INSP-Sprinkler Rough-in/Hydro | 3/12/2019 | 3/12/2019 | 3/12/2019 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.
Call Anthony before heading out Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
Sprinkler Plan Check | 3/7/2019 | | 3/8/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/8/2019 | | DONE |
Mark Stumbaugh
|
|
|
No Fee
|
Permit Ready to Issue | | | 3/8/2019 | | DONE |
|
|
|
plan mod approved
|
CHANGE STATUS TO (ISS) | | | 3/8/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 3/7/2019 | | DONE |
|
|
|
Per attached email. Change in underground size on site and re-calculated the system to update the overhead system pipe sizes.
|
Plan assigned to (Stumbaugh) | 3/7/2019 | | 3/7/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 2/4/2019 | | 2/5/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 2/5/2019 | | 2/5/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/5/2019 | | DONE |
Mark Stumbaugh
|
|
|
No Fee
|
Permit Ready to Issue | | | 2/5/2019 | | DONE |
|
|
|
plan mod pproved
|
CHANGE STATUS TO (ISS) | | | 2/5/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 2/4/2019 | | DONE |
|
|
|
Adding a double check backflow device. Eplan workflow started.
|
Issue and Print Permit | | | 11/5/2018 | | DONE |
|
|
|
|
Intake Approval | | | 10/30/2018 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 10/30/2018 | | 10/30/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/30/2018 | | 10/30/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 10/30/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/30/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 10/30/2018 | | DONE |
|
|
|
all requirements met
|
Application received | | | 10/26/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 26 2018 12:02PM
|