INSP-Final Inspection | 6/18/2019 | 6/19/2019 | 6/19/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 6/10/2019 | 6/11/2019 | 6/11/2019 | P | PASS |
Troy Cobbley
|
|
|
The hydro test was witnessed with no visible loss on the guage.
|
INSP-Supply line flush | 6/10/2019 | 6/11/2019 | 6/11/2019 | P | PASS |
Troy Cobbley
|
|
|
The underground supply line flush was witnessed.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 2/7/2019 | 2/7/2019 | 2/7/2019 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for undergorund supply complete, approved for cover.
Call Jim Page to verify he witnesses pipe installation back in 2018. The Shilo contact is Brian Collins. Thank you! Phone #: ###-#### Inspection requested via web by Stan Beus
|
Intake Approval | | | 1/25/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 1/25/2019 | | 1/25/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 1/25/2019 | | 1/25/2019 | | PASS |
Mark Stumbaugh
|
|
|
Underground Only
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/25/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 1/25/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 1/25/2019 | | DONE |
|
|
|
|
Application received | | | 1/19/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 19 2019 4:58PM
|