INSP-Final Inspection | 10/16/2019 | 10/17/2019 | 10/17/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Call ahead to Brian if you need him to meet onsite to verify candela changed. Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
INSP-Final Inspection | 10/14/2019 | 10/15/2019 | 10/15/2019 | A | PART |
Troy Cobbley
|
|
|
A temporary for fire alarm is being given. Provide as-builts/plan mods showing the strobe candella changes in the Cafeteria and all of the exisiting initiating devices in the scope of work. When plan review approvs the changes permit can be finaled.
Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
Plan Modification Accepted | | | 10/15/2019 | | DONE |
|
|
|
as built per kristin with johnson control
|
Plan assigned to (Lee) | 10/15/2019 | | 10/15/2019 | | DONE |
Lee G Meredith
|
|
|
|
Intake Approval | | | 10/15/2019 | | PASS |
|
|
|
|
1st review completed | | | 10/15/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 10/15/2019 | | 10/15/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/15/2019 | | DONE |
|
|
|
As built No fee.
|
Permit Ready to Issue | | | 10/15/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/15/2019 | | DONE |
|
|
|
as built
|
INSP-Final Inspection | 10/11/2019 | 10/14/2019 | 10/14/2019 | A | CANC |
Troy Cobbley
|
|
|
Brian Phone #: ###-####
|
Plan resubmittals received | | | 10/11/2019 | | DONE |
|
|
|
as built per Kristen-started workflow in eplan and assigned to Lee M
|
Plan assigned to (Lee) | 10/11/2019 | | 10/11/2019 | | DONE |
Lee G Meredith
|
|
|
|
Intake Approval | | | 10/11/2019 | | PASS |
|
|
|
|
1st review completed | | | 10/11/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 10/11/2019 | | 10/11/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/11/2019 | | DONE |
|
|
|
As built - No fee
|
Permit Ready to Issue | | | 10/11/2019 | | DONE |
|
|
|
as built approved
|
CHANGE STATUS TO (ISS) | | | 10/11/2019 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/12/2019 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 8/9/2019 | | 8/9/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 8/9/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 8/9/2019 | | 8/9/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/9/2019 | | DONE |
|
|
|
Passed with review comments.
|
Permit Ready to Issue | | | 8/9/2019 | | DONE |
|
|
|
met
|
Application received | | | 8/6/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 6 2019 9:03PM
|