INSP-Final Inspection | 12/12/2019 | 12/18/2019 | 12/18/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Needs to be done at 7:00am Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 12/6/2019 | 12/6/2019 | 12/6/2019 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in scope of work complete, scope of work approved for cover.
Print on counter to left of entry lock box code 3266 Phone #: ###-#### Inspection requested via web by Sam Ball
|
Issue and Print Permit | | | 12/2/2019 | | DONE |
|
|
|
|
Intake Approval | | | 11/29/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 11/29/2019 | | 11/29/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 11/29/2019 | | 11/29/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 11/29/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/29/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 11/29/2019 | | DONE |
|
|
|
MET
|
Application received | | | 11/27/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 27 2019 5:39PM
|