BLD-Final | 10/8/2018 | 10/8/2018 | 10/8/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
DOC - Permit Finaled | 10/8/2018 | 10/8/2018 | 10/8/2018 | P | PASS |
Mike Jordan
|
|
|
Window has been tempered.
|
BLD-Final | 10/5/2018 | 10/5/2018 | 10/5/2018 | P | FAIL |
Mike Jordan
|
|
|
Any issues, please contact Dylon, assistant site supervisor, at ###-####. Phone #: ###-#### Inspection requested via web by Sam Brown. Tempered glazing required on window by stairs at mid landing.
|
BLD-Blower Door Test Results | 10/5/2018 | 10/5/2018 | 10/5/2018 | P | DONE |
Mike Jordan
|
|
|
5.5ACH @50pa.
|
BLD-Energy code compliance | 7/12/2018 | 7/12/2018 | 7/12/2018 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Framing/Rough-in | 7/6/2018 | 7/6/2018 | 7/6/2018 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Other | 4/16/2018 | 4/16/2018 | 4/17/2018 | P | PASS |
Jim Sly
|
|
|
Fire rated assembly at roof eave. Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Wall Bracing | 3/30/2018 | 3/30/2018 | 3/30/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Foundation | 11/21/2017 | 11/21/2017 | 11/21/2017 | P | PASS |
Mike Jordan
|
|
|
rebar // sam Phone #: ###-####. Interior thickend footings.
|
BLD-Foundation | 10/20/2017 | 10/20/2017 | 10/20/2017 | P | PASS |
Mike Jordan
|
|
|
wall // Manuel Phone #: ###-####
|