BLD-Final | 10/2/2018 | 10/2/2018 | 10/2/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
DOC - Permit Finaled | 10/2/2018 | 10/2/2018 | 10/2/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Blower Door Test Results | 10/2/2018 | 10/2/2018 | 10/2/2018 | P | DONE |
Mike Jordan
|
|
|
5.8ACH @50pa
|
BLD-Final | 9/28/2018 | 9/28/2018 | 9/28/2018 | P | NR |
Mike Jordan
|
|
|
Requesting late PM inspection. HVAC final scheduled for this afternoon, requesting building final after HVAC final. Phone #: ###-#### Inspection requested via web by Sam Brown. Needs mech. final.
|
BLD-Final | 8/20/2018 | 8/20/2018 | 8/20/2018 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown. Needs MEP finals first.
|
BLD-Energy code compliance | 7/12/2018 | 7/12/2018 | 7/12/2018 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Framing/Rough-in | 7/6/2018 | 7/6/2018 | 7/6/2018 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Other | 4/19/2018 | 4/19/2018 | 4/19/2018 | P | PASS |
Mike Jordan
|
|
|
Fire rated assembly at roof eave. Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Wall Bracing | 3/30/2018 | 3/30/2018 | 3/30/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Foundation | 11/21/2017 | 11/21/2017 | 11/21/2017 | P | PASS |
Mike Jordan
|
|
|
rebar // sam Phone #: ###-####. Interior thickend footings.
|
BLD-Footing | 10/20/2017 | 10/20/2017 | 10/20/2017 | P | PASS |
Mike Jordan
|
|
|
Manuel Phone #: ###-####
|