Permit NumberBLD17-02156
StatusFinaled
Name RRC CONTRACTORS
Site Address 311 N CURTIS RD
Project NameBaird Oil - Metal Building Add
Customer Number 
ePlanReviewYes
Description
(BAIRD OIL – NEW METAL BUILDING ADDITION – SOUTHWEST SIDE OF EXISTING BUILDING) (DRH17-00093) (11-13-17 PLAN MODIFICATION TO MODIFY THE FOOTINGS AND FOUNDATION ALONG GRID 6 TO BE SIMILAR TO THE FOOTINGS AND FOUNDATION ALONG GRID 1 TO ALLOW FOR AN OVERHEAD DOOR IN THE WALL AT GRID 6. THE WALL BRACING ALONG GRID 6 IS ALSO REQUIRED TO MATCH THE WALL BRACING ALONG GRID 1.) This building does not have a fire sprinkler system. To construct a 4,408 square foot building adjacent to an existing 4,800 square foot building. Both buildings are considered to be one 9,208 square foot building for the application of the building code since they are separated by only 4 feet. Work is to include concrete footings, concrete stem walls, concrete slab on grade, steel column and girder moment frames, steel rod cross bracing, horizontal wall and roof purlins, steel siding, steel roofing, exterior windows, overhead doors, and side-hinged swinging doors. The building addition will not be insulated, conditioned, or have electric lighting. An existing gas pump and gas pump cover will be demolished. Special Inspection is potentially required for welding and for bolding. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. This permit is intended to establish a Certificate of Occupancy for the existing building and for the building addition. A separate permit is required for racks more than 8 feet tall. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/18/20189/18/20189/18/2018PPASS
DetailsMike Jordan
Bruce Phone #: ###-####
FIRE-Final Inspection7/19/20187/20/20187/20/2018APASS
DetailsTroy Cobbley
Life safety passed. Fire dept verified gate function

Bruce Phone #: ###-####
FIRE-Final Inspection6/28/20186/28/20187/2/2018PFAIL
DetailsTroy Cobbley
Need verification from the fire dept that the knox key for activation of the gate is functional.

Please call ahead for access - Bruce Phone #: ###-####
BLD-Final2/1/20182/2/20182/2/2018PPASS
DetailsMike Jordan
BRUCE Phone #: ###-####. Ok for Temp. occ. Will be ok for perm occ. once zoning and fire sign perm.
FIRE-Final Inspection2/1/20182/2/20182/2/2018APART
DetailsTroy Cobbley
A temporary for life safety is being given with scott and rons permission until the fire hydrant and opticon has been installed and tested.

BRUCE Phone #: ###-####
FIRE-Conference1/17/20181/17/20181/17/2018PDONE
DetailsTroy Cobbley
We discussed life safety issues. There were no fire review notes on site. I noted that an Opticon may be required at the electric gate and the contractor neeeded to verify the correct size of fire extinguishers needed. Also the fire hydrant has not been installed yet.


Bruce Phone #: ###-####
BLD-Conference1/16/20181/16/20181/16/2018PDONE
DetailsMike Jordan
Bruce Phone #: ###-####
BLD-Foundation11/15/201711/16/201711/16/2017APASS
DetailsBrandon Shaw
wall 11 pour time // shawn Phone #: ###-####
BLD-Footing11/14/201711/14/201711/14/2017PPASS
DetailsMike Jordan
pour time 1:15pm- Sean Phone #: ###-####. Additional column pad footings on north side of building for added overhead door.
BLD-Foundation11/3/201711/6/201711/6/2017PCANC
DetailsBrandon Shaw
Bruce Phone #: ###-####
BLD-Footing11/2/201711/2/201711/2/2017PPASS
DetailsMike Jordan
BLD-Other11/1/201711/2/201711/2/2017ANR
DetailsMike Jordan
rebar // Bruce Phone #: ###-####. Moved to pm inspection.