Information based on query as of Saturday, May 11, 2024.
Permit Information
Permit NumberBLD17-02185
StatusFinaled
Name EKC INC
Site Address 222 N 8TH ST
Project NameDiablo & Sons Mezcaleria
Customer Number 
ePlanReviewYes
Description
(DIABLO & SONS MEZCALERIA RESTAURANT AND BAR – FORMERLY POLLO REY MEXICAN ROTISSERIE – SOUTHWEST CORNER OF THE FIRST STORY AND BASEMENT FOOD PREPARATION ROOMS) (DRH16-00358) (2-20-19 PLAN MODIFICATION TO INSTALL VENEER STONE MASONRY COLUMN BASES SIMILAR TO THE ORIGINAL HISTORIC DESIGN AND TO REVISE THE EXTERIOR LANDING AND RAMP AT THE 8TH STREET ENTRANCE.) (2-13-18 PLAN MODIFICATION TO STRENGTHEN THE FLOOR TO SUPPORT AN OPEN-FIRE GRILLWORKS WOOD FUEL CHARBROILER LOCATED ON THE 1ST STORY ABOVE. THE STRUCTURAL CAPACITY OF THE FLOOR WAS EVALUATED WITH C4 x 4.5 CHANELS SISTERED TO EXISTING WOOD JOISTS. SPECIAL INSPECTION IS REQUIRED FOR WELDING) (1-11-18 PLAN MODIFICATION TO MAKE STRUCTURAL CHANGES TO THE EXISTING ROOF SYSTEM AND TO THE 2ND STORY FLOOR SYSTEM TO ACCOMMODATE THE GREASE DUCTS AND THE MAKE-UP AIR DUCT DESIGN THAT WAS APPROVED EARLIER AS PART OF THIS TENANT IMPROVEMENT PERMIT. THIS STRUCTURAL DESIGN WAS POSTPONED UNTIL AFTER THE ACTUAL EXISTING STRUCTURAL CONDITIONS OF THE ROOF COULD BE DETERMINED. THE WORK IS REQUIRED TO COMPLY WITH THE STRUCTURAL DESIGN AND DETAILS.) (12-13-17 PLAN MODIFICATION TO REMOVE 6 COLUMNS IN THE BASEMENT AND TO REDIRECT THE LOAD PATH TO EXISTING AND MODIFIED JOISTS AND HEADERS.) (11-20-17 PLAN MODIFICATION TO SHIFT SOME BASEMENT WALLS DUE TO CONSTRUCTION CONDITIONS AND TO UPDATE MECHANICAL DRAWINGS AND ELECTRICAL DRAWINGS.) The fire sprinkler system is used to substitute for 1-hr fire-resistance-rated construction of the building. To remodel a 2,289 square foot restaurant tenant space located on the 1st story and to expand the sidewalk seating to about 952 total square feet. The entry to the adjacent East tenant space will also be remodeled to include an entry vestibule at the exterior door. In addition, the windows of the East tenant space will be replaced with glazed vertical sliding overhead exterior doors. Work is to include interior nonbearing walls, suspended ceilings, gypsum board ceilings, sound attenuation insulation and plywood ceiling, three entry vestibules at exterior doors, maintaining an existing Type I grease hood and duct system with a listed 1-hr duct wrap system installed from the hood all the way to the exhaust fan on the roof, a modified hood make-up air system, a new Type I grease hood and duct system for solid fuel burning cooking equipment with a listed 1-hr duct wrap system installed from the hood all the way to the exhaust fan on the roof and served by the modified make-up air system, kitchen equipment, glazed vertical sliding overhead exterior doors, exterior doors, millwork, and finishes. To remodel food preparation areas in the basement (total area of about 3,000 square feet). Work is to include interior nonbearing walls, a bearing wall with a concrete footing, a new concrete floor on steel decking to replace a section of wood floor above the new grease hoods, two Type I grease hoods each served by a grease duct that becomes a common grease duct system with make-up air, a listed 1-hr grease duct wrap system continuous from the grease hoods all the way to the exhaust fan on the roof, walk-in coolers, food preparation equipment, and finishes. The changes to the roof structure required to support the added roof top equipment, improved roof access to serve new and existing roof top equipment, the chase wall through the 2nd story to accommodate ducts, and the increased exit access headroom height in the basement were all done under separate permits. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/29/20197/2/20197/2/2019APASS
DetailsDave Hannah
Please call me prior to inspection. I''ll bring the ADA accessible directional signs with me and place where they need to be during inspection. Thanks! Phone #: ###-#### Inspection requested via web by Brandon McCurdy
BLD-Final4/18/20194/19/20194/19/2019AFAIL
DetailsJim Storey
Exterior complete. Phone #: ###-#### Inspection requested via web by Brandon McCurdy mail box full// not on site// singage not in place// zoning not signed off
BLD-Final4/16/20194/17/20194/17/2019ANR
DetailsJim Storey
Entry ramp at 8th street complete and ready for inspection. Phone #: ###-#### Inspection requested via web by Brandon McCurdy
BLD-Aging Inspection3/4/20193/4/20193/7/2019 PEND
DetailsDave Hannah
should be in temp c of o status but had a plan mod
BLD-Conference1/11/20191/14/20191/14/2019APEND
DetailsDave Hannah
If possible, please give me at lease a 30 min. heads up and I''ll meet you at the site. I''ve got a couple of other folks that would like to review the 8th street entry pavers that need to be corrected. Phone #: ###-#### Inspection requested via web by Brandon McCurdy needs to see aproved plans
BLD-Conference11/16/201811/16/201811/16/2018APEND
DetailsDave Hannah
needs to fix landing at door on 8th street
BLD-Final10/11/201810/12/201810/12/2018PPART
DetailsMike Jordan
Pending on ADA (8th st) per Dave H 11/16/18 Dale Phone #: ###-####
FIRE-Final Inspection10/11/201810/12/201810/12/2018APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, hood suppression system inspection complete, fire extinguishers will be mounted in discussed locations. Final life fire safety inspection for area of work complete.

Dale Phone #: ###-####
BLD-Ceiling Grid Inspection9/7/20189/7/20189/7/2018PPASS
DetailsMike Jordan
dale Phone #: ###-####
BLD-Conference5/18/20185/21/20185/21/2018ADONE
DetailsDave Hannah
We like to go over any items that may need to be addressed in preparation for our building final to avoid any surprises. Thanks. Phone #: ###-#### Inspection requested via web by Brandon McCurdy
BLD-Framing/Rough-in4/24/20184/24/20184/25/2018PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Brandon McCurdy ok after elec oks rough ins
BLD-Aging Inspection3/22/20183/22/20183/23/2018 PEND
DetailsDave Hannah
BLD-Aging Inspection3/21/20183/21/20183/23/2018 PEND
DetailsDave Hannah
BLD-Footing11/3/201711/6/201711/7/2017PPASS
DetailsDave Hannah
Call prior to going Phone #: 2089496755 >> Inspection requested via mobile web by Tony Dondero