BLD-Final | 12/27/2018 | 12/28/2018 | 12/28/2018 | A | PASS |
Dave Hannah
|
|
|
Laura Phone #: ###-####
|
BLD-Final | 12/20/2018 | 12/21/2018 | 12/21/2018 | A | NR |
Dave Hannah
|
|
|
Laura Phone #: ###-####
|
BLD-Final | 11/16/2018 | 11/16/2018 | 11/16/2018 | P | PART |
Dave Hannah
|
|
|
For OK to remove restirction to TCO and allow residential occupancy, (not ready for pernanent certificate of occupancy). Call Laura with questions at ###-####. ok for tco
|
FIRE-Final Inspection | 11/15/2018 | 11/16/2018 | 11/16/2018 | A | PASS |
Jim Page
|
|
|
Previously noted items for life fire safety have been corrected, life fire safety inspection is complete.
Laura Phone #: ###-####
|
BLD-Final | 10/31/2018 | 11/1/2018 | 11/2/2018 | P | PART |
Dave Hannah
|
|
|
Todd Phone #: ###-#### ok for tco ok for staff and ok to load furniture
|
FIRE-Final Inspection | 10/31/2018 | 11/1/2018 | 11/1/2018 | A | PART |
Jim Page
|
|
|
Partial life fire safety inspection complete, fire alarm inspection complete, fire sprinkler inspection complete, fire extinguishers are placed with current inspection tags. Final life fire safety sign off pending easement issues with building code official as well as acceptance of security gate operation in computer lab area.
Todd Phone #: ###-####
|
BLD-Final | 10/29/2018 | 10/31/2018 | 11/1/2018 | A | NR |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Final | 10/31/2018 | 10/31/2018 | 11/1/2018 | P | NR |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
FIRE-Final Inspection | 10/29/2018 | 10/30/2018 | 10/30/2018 | P | NR |
Jim Page
|
|
|
Project not ready for life fire safety inspection. Associated FIR permits need to be finaled before life fire safety inspection can be completed.
Todd Phone #: ###-####
|
FIRE-Final Inspection | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | FAIL |
Jim Page
|
|
|
Project not ready for life fire safety inspection. Associated FIR permits need to be finaled before life fire safety inspection can be completed.
Todd Phone #: ###-####
|
BLD-Conference | 10/16/2018 | 10/17/2018 | 10/17/2018 | A | DONE |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Conference | 10/15/2018 | 10/16/2018 | 10/16/2018 | A | CANC |
Mike Jordan
|
|
|
Todd Phone #: ###-####
|
BLD-Conference | 9/25/2018 | 9/26/2018 | 9/26/2018 | A | DONE |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 9/10/2018 | 9/10/2018 | 9/10/2018 | P | PASS |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 8/28/2018 | 8/29/2018 | 8/30/2018 | P | PASS |
Dave Hannah
|
|
|
Todd-partial-ast floor community foom Phone #: ###-####
|
BLD-Framing/Rough-in | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | FAIL |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 8/23/2018 | 8/24/2018 | 8/24/2018 | A | PART |
Dave Hannah
|
|
|
partial 1st fl - Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 8/21/2018 | 8/21/2018 | 8/21/2018 | P | NR |
Dave Hannah
|
|
|
partial framing // Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 8/15/2018 | 8/15/2018 | 8/16/2018 | P | PASS |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Energy code compliance | 8/13/2018 | 8/14/2018 | 8/14/2018 | P | PART |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 8/13/2018 | 8/13/2018 | 8/13/2018 | P | PASS |
Dave Hannah
|
|
|
Todd Phone #: ###-#### 3rd fl drops ok
|
BLD-Other | 8/10/2018 | 8/10/2018 | 8/10/2018 | P | PASS |
Dave Hannah
|
|
|
Todd-fire caulking Phone #: ###-####
|
BLD-Energy code compliance | 8/9/2018 | 8/9/2018 | 8/9/2018 | P | DONE |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 8/8/2018 | 8/8/2018 | 8/8/2018 | P | PASS |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Energy code compliance | 8/2/2018 | 8/3/2018 | 8/3/2018 | A | PASS |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 8/1/2018 | 8/1/2018 | 8/2/2018 | P | PART |
Dave Hannah
|
|
|
1st floor //Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 7/30/2018 | 7/30/2018 | 7/31/2018 | P | PART |
Dave Hannah
|
|
|
2nd floor // Todd Phone #: ###-####
|
BLD-Energy code compliance | 7/27/2018 | 7/27/2018 | 7/27/2018 | P | PASS |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Energy code compliance | 7/25/2018 | 7/25/2018 | 7/26/2018 | P | PASS |
Dave Hannah
|
|
|
stated not part of plan mod // Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 7/24/2018 | 7/24/2018 | 7/24/2018 | P | PASS |
Dave Hannah
|
|
|
todd Phone #: ###-####
|
BLD-Framing/Rough-in | 7/20/2018 | 7/23/2018 | 7/24/2018 | P | PART |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Energy code compliance | 7/19/2018 | 7/19/2018 | 7/19/2018 | P | PASS |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 7/17/2018 | 7/18/2018 | 7/18/2018 | P | PART |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 7/16/2018 | 7/17/2018 | 7/17/2018 | A | PASS |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Energy code compliance | 7/13/2018 | 7/16/2018 | 7/16/2018 | P | PASS |
Dave Hannah
|
|
|
partial insulation - Todd Phone #: ###-####
|
BLD-Energy code compliance | 7/11/2018 | 7/12/2018 | 7/16/2018 | P | PART |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Energy code compliance | 7/12/2018 | 7/13/2018 | 7/16/2018 | P | PART |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Energy code compliance | 7/10/2018 | 7/11/2018 | 7/12/2018 | P | NR |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 7/6/2018 | 7/9/2018 | 7/10/2018 | P | PASS |
Dave Hannah
|
|
|
Todd Phone #: ###-#### 4th floor
|
BLD-Energy code compliance | 7/9/2018 | 7/10/2018 | 7/10/2018 | P | PART |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 7/9/2018 | 7/10/2018 | 7/10/2018 | P | PASS |
Dave Hannah
|
|
|
Todd Phone #: ###-#### third floor
|
BLD-Energy code compliance | 7/5/2018 | 7/6/2018 | 7/6/2018 | P | PASS |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Energy code compliance | 7/5/2018 | 7/5/2018 | 7/5/2018 | P | PART |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 7/2/2018 | 7/3/2018 | 7/3/2018 | P | PART |
Dave Hannah
|
|
|
Todd--- also insulation Phone #: ###-#### ground floor room west of entryway ok to insulate ceiling
|
BLD-Framing/Rough-in | 6/29/2018 | 7/2/2018 | 7/2/2018 | A | PART |
Dave Hannah
|
|
|
Todd Phone #: ###-#### 4th floor south end ok to insulate 3rd floor south end ok to insulate ceilings
|
BLD-Framing/Rough-in | 6/27/2018 | 6/27/2018 | 6/28/2018 | P | CANC |
Dave Hannah
|
|
|
Todd-partial-please call when on way so Todd can meet for inspection Phone #: ###-####
|
BLD-Framing/Rough-in | 6/28/2018 | 6/28/2018 | 6/28/2018 | A | PART |
Dave Hannah
|
|
|
Todd-partial-please call when on way so Todd can meet for inspection Phone #: ###-#### ceilings gruond floor hall ways ok to rock
|
BLD-Framing/Rough-in | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | PART |
Dave Hannah
|
|
|
Please call ahead for access - Todd Phone #: ###-#### k to cover lids on forth floor
|
BLD-Framing/Rough-in | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | PART |
Dave Hannah
|
|
|
Todd Phone #: ###-#### trash shoot ok to cover int walls
|
BLD-Framing/Rough-in | 5/25/2018 | 5/29/2018 | 5/29/2018 | A | NR |
Dave Hannah
|
|
|
Todd--partial framing Phone #: ###-####
|
BLD-Wall Bracing | 5/14/2018 | 5/14/2018 | 5/14/2018 | A | PART |
Dave Hannah
|
|
|
Todd Phone #: ###-#### shear on floors 2,3,and 4 ok
|
BLD-Wall Bracing | 5/10/2018 | 5/11/2018 | 5/14/2018 | A | CANC |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
FIRE-Conference | 5/10/2018 | 5/11/2018 | 5/11/2018 | P | DONE |
Jim Page
|
|
|
Fire conference about required signage complete.
Todd Phone #: ###-####
|
BLD-Wall cover | 5/9/2018 | 5/10/2018 | 5/10/2018 | A | PART |
Dave Hannah
|
|
|
Todd Phone #: ###-#### ok lids in corradors
|
BLD-Framing/Rough-in | 5/4/2018 | 5/8/2018 | 5/8/2018 | A | PART |
Dave Hannah
|
|
|
Todd Phone #: ###-#### ok to cover lids on corradors and down 2ft
|
BLD-Energy code compliance | 5/2/2018 | 5/4/2018 | 5/4/2018 | A | FAIL |
Jim Storey
|
|
|
Todd Phone #: ###-#### no framing insp.
|
BLD-Other | 4/27/2018 | 4/30/2018 | 4/30/2018 | A | PART |
Brandon Shaw
|
|
|
Stair #2
|
BLD-Wall Bracing | 4/18/2018 | 4/19/2018 | 4/19/2018 | A | PART |
Dave Hannah
|
|
|
Shear // Todd Phone #: ###-#### ok to cover ext 1st thru 4th wall shear and straping ok also roof sheeting strapes ok ok to cover roof.
|
BLD-Wall Bracing | 2/15/2018 | 2/16/2018 | 2/16/2018 | A | NR |
Dave Hannah
|
|
|
Todd-shear and hold down- Phone #: ###-####
|
BLD-Other | 1/16/2018 | 1/17/2018 | 1/17/2018 | A | DONE |
Dave Hannah
|
|
|
Todd-as per Todd this inspection has nbothing to do with the plan mod that''s in for review Phone #: ###-####
|
BLD-Foundation | 11/22/2017 | 11/27/2017 | 11/27/2017 | A | PASS |
Dave Hannah
|
|
|
Pouring at 9:30 - Todd Phone #: ###-####
|
BLD-Footing | 11/13/2017 | 11/14/2017 | 11/14/2017 | A | PEND |
Dave Hannah
|
|
|
Todd Phone #: ###-#### ok after spec inspection sign off
|