Information based on query as of Saturday, May 11, 2024.
Permit Information
Permit NumberBLD17-03010
StatusFinaled
Name ENERGREEN DEVELOPMENT COMPANY LLC
Site Address 1514 W RIVER ST
Project Name15th & River St Condos Bldg 2
Customer NumberBLD17-03009 EPLAN GRD18-00032
ePlanReviewNo
Description
(2 PERMITS FILED UNDER BLD17-03009 IN EPLANREVIEW)(15TH & RIVER CONDOMINIUMS - BLDG 2) **Permit for the construction of a 3-story 5-unit concrete and wood framed apartment building with work to include general site work and construction of the new building per the approved plans. Special inspections required per attached Form 310. This building is fully fire sprinklered with an NFPA 13-R system. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/25/20203/25/20203/25/2020PPASS
DetailsDave Hannah
Tim Phone #: ###-####
FIRE-Final Inspection3/18/20203/19/20203/19/2020APASS
DetailsJim Page
Previously noted items have been corrected, fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection complete, signature card not available at time of inspection.

Tim Phone #: ###-####
FIRE-Final Inspection3/18/20203/18/20203/18/2020PFAIL
DetailsJim Page
Fire riser room is not a rated room as required by Boise Municipal Code, Chapter 7 Fire Prevention Code section 903.1.2. Provide building permit fire review comments for project, documents are required to be onsite, per conversation with point of contact they are not onsite. Install addressing that is compliant with 2016 IFC section 505, current addressing does not meet the requirements of section 505. Provide corner lot addressing as defined in the BMC Chapter 7 section 505.3. Provide fire extinguishers with current inspection tags for each unit, fire extingiushers can be mounted under the sink. Correct the addressing with the monitoring company.

Tim Phone #: ###-####
BLD-Conference3/9/20203/10/20203/10/2020ACANC
DetailsDave Hannah
Tim Phone #: ###-####
BLD-Final3/10/20203/10/20203/10/2020PNR
DetailsDave Hannah
Tim Phone #: ###-####
BLD-Aging Inspection2/13/20202/13/20202/19/2020 PASS
DetailsDave Hannah
BLD-Aging Inspection2/12/20202/12/20202/19/2020 PASS
DetailsDave Hannah
BLD-Energy code compliance10/1/201910/1/201910/1/2019PPASS
DetailsDave Hannah
Tim Phone #: ###-#### this finishs this blg for energy ok to cover
BLD-Energy code compliance9/24/20199/24/20199/24/2019APASS
DetailsDave Hannah
BLD-Wall cover9/23/20199/23/20199/24/2019PPASS
DetailsDave Hannah
Tim Phone #: ###-####
BLD-Framing/Rough-in9/4/20199/4/20199/4/2019PPASS
DetailsDave Hannah
Tim Phone #: ###-####
BLD-Foundation4/25/20194/25/20194/26/2019PPASS
DetailsDave Hannah
Tim Phone #: ###-#### third floor center walls ok
BLD-Foundation4/15/20194/15/20194/16/2019PPART
DetailsDave Hannah
Tim Phone #: ###-#### third floor ext wallsok
BLD-Foundation2/28/20192/28/20192/28/2019PCANC
DetailsBrandon Shaw
Tim Phone #: ###-####
BLD-Foundation2/19/20192/19/20192/19/2019PPART
DetailsDave Hannah
Tim Phone #: ###-#### second floor int walls
BLD-Foundation1/28/20191/28/20191/28/2019PPART
DetailsDave Hannah
Tim Phone #: ###-#### second level ext walls ok
BLD-Footing12/20/201812/21/201812/21/2018APASS
DetailsDave Hannah
Tim Phone #: ###-####
BLD-Foundation12/19/201812/20/201812/20/2018APASS
DetailsDave Hannah
wall-tim Phone #: ###-####
BLD-Foundation11/28/201811/28/201811/28/2018PPART
DetailsDave Hannah
Wall-Tim Phone #: ###-#### second lift ok to place
BLD-Foundation10/16/201810/16/201810/16/2018PPASS
DetailsMike Jordan
Tim-pour time 3:30 Phone #: ###-####
BLD-Foundation10/11/201810/11/201810/11/2018PPASS
DetailsDave Hannah
Tim Phone #: ###-####
BLD-Footing10/2/201810/2/201810/2/2018PPASS
DetailsDave Hannah
tim Phone #: ###-####