BLD-Final | 12/19/2019 | 12/19/2019 | 12/19/2019 | P | PASS |
Dave Hannah
|
|
|
Chase Phone #: ###-####
|
FIRE-Final Inspection | 1/28/2019 | 1/28/2019 | 1/28/2019 | P | CANC |
Jim Page
|
|
|
Keith Phone #: ###-####
|
FIRE-Final Inspection | 1/25/2019 | 1/28/2019 | 1/28/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, hood suppression system inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection complete.
.
early am please- Keith Phone #: ###-####
|
BLD-Conference | 1/22/2019 | 1/22/2019 | 1/28/2019 | P | PASS |
Dave Hannah
|
|
|
Keith-please call to meet Phone #: ###-####
|
BLD-Final | 1/24/2019 | 1/25/2019 | 1/25/2019 | A | PART |
Dave Hannah
|
|
|
Temp- Keith Phone #: ###-#### ok for temp occ of phase one
|
BLD-Ceiling Grid Inspection | 1/7/2019 | 1/8/2019 | 1/8/2019 | A | PASS |
Dave Hannah
|
|
|
Keith Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 12/28/2018 | 12/31/2018 | 12/31/2018 | A | PASS |
Dave Hannah
|
|
|
Keith Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 12/12/2018 | 12/13/2018 | 12/13/2018 | A | PASS |
Dave Hannah
|
|
|
keith Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/30/2018 | 11/30/2018 | 11/30/2018 | P | PART |
Dave Hannah
|
|
|
Keith Phone #: ###-#### second floor class rooms and hallway south side ok
|
BLD-Conference | 11/26/2018 | 11/27/2018 | 11/27/2018 | P | DONE |
Dave Hannah
|
|
|
After 1:30 please - Steve Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/9/2018 | 11/13/2018 | 11/13/2018 | A | PART |
Brandon Shaw
|
|
|
Ceiling grid in area B
|
BLD-Energy code compliance | 11/8/2018 | 11/9/2018 | 11/9/2018 | P | PASS |
Dave Hannah
|
|
|
Keith Phone #: ###-####
|
BLD-Framing/Rough-in | 11/7/2018 | 11/7/2018 | 11/8/2018 | P | PART |
Dave Hannah
|
|
|
Keith Phone #: ###-#### ok to insulate po to cover
|
BLD-Framing/Rough-in | 10/23/2018 | 10/24/2018 | 10/24/2018 | A | PASS |
Dave Hannah
|
|
|
Keith Phone #: ###-####
|
BLD-Framing/Rough-in | 10/1/2018 | 10/2/2018 | 10/2/2018 | A | PASS |
Dave Hannah
|
|
|
keith Phone #: ###-####
|
BLD-Conference | 9/26/2018 | 9/27/2018 | 9/27/2018 | A | DONE |
Dave Hannah
|
|
|
Keith Phone #: ###-####
|
BLD-Framing/Rough-in | 9/4/2018 | 9/4/2018 | 9/4/2018 | P | PART |
Dave Hannah
|
|
|
Keith Phone #: ###-####
|
BLD-Framing/Rough-in | 8/21/2018 | 8/21/2018 | 8/22/2018 | P | PASS |
Dave Hannah
|
|
|
Keith Phone #: ###-#### under stairs
|
BLD-Framing/Rough-in | 8/6/2018 | 8/8/2018 | 8/9/2018 | P | PASS |
Dave Hannah
|
|
|
Keith Phone #: ###-####
|
BLD-Framing/Rough-in | 7/10/2018 | 7/13/2018 | 7/13/2018 | A | PASS |
Dave Hannah
|
|
|
Keith Phone #: ###-#### ext walls bldg b and d ok to cover int walls bldg b ok
|
BLD-Framing/Rough-in | 4/24/2018 | 4/25/2018 | 4/25/2018 | A | NR |
Dave Hannah
|
|
|
Keith Phone #: ###-####
|
BLD-Concrete | 3/14/2018 | 3/15/2018 | 3/15/2018 | A | PASS |
Dave Hannah
|
|
|
Keith Phone #: ###-####
|
BLD-Concrete | 2/22/2018 | 2/23/2018 | 2/23/2018 | A | CANC |
Dave Hannah
|
|
|
|
BLD-Foundation | 2/21/2018 | 2/22/2018 | 2/22/2018 | A | CANC |
Dave Hannah
|
|
|
Keith Phone #: ###-####
|
BLD-Footing | 1/2/2018 | 1/2/2018 | 1/2/2018 | P | PART |
Dave Hannah
|
|
|
Keith Phone #: ###-#### ok after mti sign off
|
BLD-Footing | 12/27/2017 | 12/28/2017 | 12/29/2017 | P | PEND |
Dave Hannah
|
|
|
Keith Phone #: ###-#### ok after spec inspection final signoff
|