Information based on query as of Friday, April 26, 2024.
Permit Information
Permit NumberBLD17-04464
StatusFinaled
Name VISSER BUILDING CO
Site Address 503 S ASH ST
Project NameAsh Street Townhomes East Bldg
Customer Number17-04465 & 18-00248
ePlanReviewYes
Description
(ASH STREET TOWNHOMES - EAST BUILDING) There are three building permits under this Eplan (BLD17-04464, BLD17-04465 and BLD18-00248). // 06/21/19 PLAN MOD TO REVISE WINDOW SCHEDULE TO PROVIDE ONLY CODE REQUIRED EEROS. JAR // 11/02/18 PLAN MOD TO SEWER CONNECTION LOCATIONS, GRADING, AND SURFACE FINISH, LANDSCAPING PLANTING AND IRRIGATION, MECHANICAL EQUIPMENT ADN LOCATIONS, PLUMBING SEWER CONNECTIONS MODIFIED TO MATCH CIVIL. JAR // Permit to build the East Building, a 23,742 sq ft multi-family R2 apartment building. This project consists of two 3-story, multi-family residential buildings and one single-story detached carport, and related site work. The two multi-family buildings are of Type VB construction and fully sprinklered with an NFPA 13 system for building area increase. Separate fire sprinkler and fire alarm permits are required as regulated by Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/17/20197/18/20197/18/2019PPASS
DetailsDave Hannah
Wes Phone #: ###-####
BLD-Final7/16/20197/17/20197/17/2019ANR
DetailsDave Hannah
Wes Phone #: ###-####
BLD-Final7/10/20197/11/20197/11/2019APART
DetailsDave Hannah
Wes Phone #: ###-#### ok for tco needs to fix windows and sinks in type b units rest rooms
FIRE-Final Inspection6/24/20196/25/20196/25/2019APASS
DetailsJim Page
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags, knox box is located by fire sprinkler riser room. Final life fire safety inspection complete.

Wes Phone #: 208-###-####
BLD-Wall Bracing3/28/20193/29/20193/29/2019PPASS
DetailsDave Hannah
Interior Shear inspection in units #122, #124, #126, #128, #130, #132, #134 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Energy code compliance3/28/20193/29/20193/29/2019PPASS
DetailsDave Hannah
Insulation inspection in units #122, #124, #126, #128, #130, #132, #134 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall cover3/28/20193/29/20193/29/2019PPASS
DetailsDave Hannah
Wall Cover inspection in units #122, #124, #126, #128, #130, #132, #134 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Framing/Rough-in3/21/20193/21/20193/21/2019PPASS
DetailsDave Hannah
Rough-in inspection prior to insulation on Units #122, #124, #126, #128, #130, #132, #134 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing3/18/20193/18/20193/18/2019PPASS
DetailsDave Hannah
Interior shear inspection on units #114, #116, #118, #120 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Energy code compliance3/18/20193/18/20193/18/2019PPASS
DetailsDave Hannah
Insulation inspection on units #114, #116, #118, #120 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall cover3/18/20193/18/20193/18/2019PPASS
DetailsDave Hannah
wall cover inspection on units #114, #116, #118, #120 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Framing/Rough-in3/11/20193/12/20193/12/2019APASS
DetailsDave Hannah
Pre-insulation framing inspection in units #114, #116, #118. #120 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall cover3/11/20193/12/20193/12/2019APASS
DetailsDave Hannah
Wall cover inspection in unit #112 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing3/11/20193/12/20193/12/2019APASS
DetailsDave Hannah
Interior shear inspection in unit #112 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Energy code compliance3/11/20193/12/20193/12/2019APASS
DetailsDave Hannah
Insulation inspection in unit #112 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall cover3/5/20193/5/20193/5/2019APASS
DetailsDave Hannah
Wall cover inspection in Unit #102 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing3/5/20193/5/20193/5/2019APASS
DetailsDave Hannah
Interior Shear inspection in Unit #102 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Energy code compliance3/5/20193/5/20193/5/2019APASS
DetailsDave Hannah
Insulation inspection in Unit #102 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Framing/Rough-in3/5/20193/5/20193/5/2019APASS
DetailsDave Hannah
Framing inspection prior to insulation in unit #112 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing2/27/20192/27/20192/27/2019PPASS
DetailsBrandon Shaw
Interior Shear inspection for unit #204 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall cover2/27/20192/27/20192/27/2019PPASS
DetailsBrandon Shaw
wall cover inspection for unit #204 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Energy code compliance2/27/20192/27/20192/27/2019PPASS
DetailsBrandon Shaw
Energy Code inspection for unit #204 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing2/26/20192/26/20192/26/2019PPASS
DetailsBrandon Shaw
Insulation inspection on units #202, #204, #106, #108, #110
BLD-Wall cover2/26/20192/26/20192/26/2019PPASS
DetailsBrandon Shaw
Insulation inspection on units #202, #204, #106, #108, #110
BLD-Energy code compliance2/26/20192/26/20192/26/2019PPASS
DetailsBrandon Shaw
Insulation inspection on units #202, #204, #106, #108, #110
BLD-Framing/Rough-in2/19/20192/20/20192/20/2019APASS
DetailsDave Hannah
Framing inspection prior to insulation in units #102, #104 #106, #108, #110, #202, #204 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Framing/Rough-in2/12/20192/12/20192/14/2019PNR
DetailsDave Hannah
Framing inspection in units #102, #202, #204, #104, #106, #108, #110, #112 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Framing/Rough-in2/7/20192/7/20192/7/2019APART
DetailsDave Hannah
Inspection of Roof trusses prior to spray foam application. Phone #: ###-#### Inspection requested via web by Hunter Gomez ok to spray trusses
BLD-Framing/Rough-in2/7/20192/7/20192/7/2019ACANC
DetailsDave Hannah
Inspection of roof truss system prior to spray foam application Phone #: ###-#### >> Inspection requested via web by Hunter Gomez Inspection cancelled from web by: Hunter Gomez
BLD-Wall Bracing1/17/20191/18/20191/18/2019APASS
DetailsDave Hannah
Exterior Shear inspection on all remaining shear walls (East side already inspected) and the final missing hold down (HDU4) in the northwest Sw-3 shearwall. Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing12/20/201812/21/201812/21/2018APASS
DetailsDave Hannah
Exterior 3rd floor shear inspection on eastside north shear walls prior to masonry Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing12/17/201812/17/201812/17/2018APASS
DetailsDave Hannah
Shear inspection on 3rd floor east facing shear walls from Gridline 15-10. Mid to late AM if possible. Please call Hunter prior to arrival @ ###-#### Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing12/14/201812/14/201812/14/2018APASS
DetailsDave Hannah
Exterior Shear inspections of 1st ; 2nd floor East wall from gridline 9-3 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing12/6/201812/6/201812/7/2018PPASS
DetailsDave Hannah
Exterior Shear inspection on 1st and 2nd floor walls. East Side of east building, gridlines 14,13,12,11 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing12/7/201812/7/201812/7/2018APASS
DetailsDave Hannah
Exterior Sheer inspection, 1st;2nd floor, east side of building, gridlines 14, 13, 12, 11 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing11/20/201811/20/201811/20/2018PPART
DetailsDave Hannah
Inspection of Hold down anchors (HDU4) prior to being covered by framing Phone #: ###-#### Inspection requested via web by Hunter Gomez first floor ok
BLD-Foundation7/17/20187/17/20187/18/2018PPASS
DetailsDave Hannah
Late afternoon inspection of the rebar in thickened footings; 7am pour tomorrow morning with MTI special inspection Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Energy code compliance6/21/20186/22/20186/22/2018APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Hunter Gomez. rigid insulation on interior side of footings ok.
BLD-Foundation6/15/20186/18/20186/18/2018APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Footing6/11/20186/11/20186/12/2018PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Ben Sears