Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD17-04625
StatusFinaled
Name PETRA INC
Site Address 2090 S HUDSON AVE
Project NameSkyline Apartments
Customer NumberBLD17-04623 IN EPLAN
ePlanReview 
Description
Building C: (SKYLINE APARTMENTS – BUILDING TYPE 2, Building A, B, C, E, G and J) (24 units)PLAN MOD RELOCATE WAHER/DRYER FROM BATHROOM TO HALLWAY ADD CLOSED DOOR AS NOTED ON APPROVED PLANS 7-2-18**AJS**The NFPA 13-R fire sprinkler system is used for occupancy and for story increase. To construct a 25,320 square foot three story VB Type of Construction apartment building (8,458 sq. ft. 1st story and 8,431 sq. ft. 2nd story and 8,431 sq. ft. 3rd story). Each unit is 1 story. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud bearing walls, wood stud shear walls, fiberglass shingles, 1-hr dwelling unit separations, 1 hour fire barriers for stair and breezeways, rated doors in breezeway, interior nonbearing walls, millwork, and finishes. Special Inspection is NOT required. The roof truss design is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13-R as regulated by the Fire Department. Separate fire sprinkler permits shall be obtained prior to beginning any modification or installation work on such systems. **ajs**192 unit apartment project with (9) apartment buildings, clubhouse, and associated site work
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection10/7/201910/7/201910/7/2019 PASS
DetailsJim Storey
BLD-Aging Inspection8/6/20198/6/20198/6/2019 DONE
DetailsJim Storey
BLD-Final6/6/20196/7/20196/7/2019APASS
DetailsJim Storey
Building Final Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Final5/30/20195/31/20195/31/2019PNR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by J.C. Murray
FIRE-Final Inspection5/30/20195/31/20195/31/2019APASS
DetailsJim Page
Fire sprinkler inspection complete, fire al;arm inspection complete, fire extinguishers are placed with current inspection tags, knox box is located by fire sprinkler riser room. Final life fire safety inspection complete, fire alarms must be monitored after occupancy.

Fire / Life ; Safety Phone #: ###-#### Inspection requested via web by J.C. Murray
FIRE-Final Inspection5/9/20195/10/20195/10/2019ACANC
DetailsTroy Cobbley
Not ready for life safety. Still need sprinkler final and paving has not been started yet for fire dept access. Bld C - FIRE / LIFE ; SAFETY re-inspection patched sprinkler holes Phone #: ###-#### Inspection requested via web by J.C. Murray
FIRE-Final Inspection5/8/20195/9/20195/9/2019ACANC
DetailsTroy Cobbley
Not ready for final. Need the project related fire sprinkler permit finaled and ceiling repaired prior to an inspection

Bld C - FIRE / LIFE ; SAFETY Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Ceiling Grid Inspection1/14/20191/15/20191/15/2019PPASS
DetailsJim Storey
Bld C; south 12 units, drop ceilings for cover. fire caulking Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Wall cover12/28/201812/28/201812/28/2018PPASS
DetailsJim Storey
Bld C - drop ceilings for cover, B-Units Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Ceiling Grid Inspection12/21/201812/21/201812/21/2018PPASS
DetailsJim Storey
Bld C - D-Units, north 6. ceiling grid for cover drop ceilings. Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Other12/11/201812/12/201812/12/2018APASS
DetailsMike Jordan
rc channel // clint Phone #: ###-####. RC channel for floor ceilng assemblies and corridor.
BLD-Energy code compliance12/6/201812/7/201812/7/2018PPASS
DetailsJim Storey
Bld C - south 12. B-Units and D-Units. all three floors.
insulation for cover. Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Framing/Rough-in12/4/201812/5/201812/5/2018PPASS
DetailsJim Storey
Bld C - south units B and D. south 12 for fire caulking and framing. Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Framing/Rough-in12/4/201812/4/201812/4/2018PDEFR
DetailsJim Storey
Bld C - south units B and D. south 12 for fire caulking and framing. Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Framing/Rough-in11/30/201811/30/201811/30/2018PPASS
DetailsJim Storey
Bld C - north B-Units recheck on fire caulking in furnace cavities. Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Energy code compliance11/30/201811/30/201811/30/2018PPASS
DetailsJim Storey
Bld C - north B-Units 1st, 2nd, 3rd floors 6 Units Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Framing/Rough-in11/28/201811/29/201811/29/2018ANR
DetailsJim Storey
revised Bld C inspection for North (6) B-Units
framing and fire caulking. Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Framing/Rough-in11/27/201811/28/201811/28/2018PCANC
DetailsJim Storey
Bld C - interior framing/ fire caulking
B-Units and south D-Units Phone #: ###-#### Inspection requested via web by J.C. Murray north b 6 units ok to insulate.
BLD-Framing/Rough-in11/14/201811/15/201811/15/2018APASS
DetailsJim Storey
Bld C- roof truss engineering Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Framing/Rough-in11/13/201811/14/201811/14/2018ADEFR
DetailsJim Storey
Bld C- roof truss engineering and interior framing. Phone #: ###-#### Inspection requested via web by J.C. Murray no plans
BLD-Framing/Rough-in10/16/201810/16/201810/16/2018PPASS
DetailsJim Storey
exterior shear nailing and strapping Building C Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Framing/Rough-in9/20/20189/21/20189/21/2018APART
DetailsBrandon Shaw
Perimeter anchor bolts and hold downs.
BLD-Energy code compliance8/7/20188/8/20188/8/2018PPASS
DetailsJim Storey
Building C - foundation insulation and vapor barrier Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Foundation7/13/20187/13/20187/13/2018PPASS
DetailsJim Storey
WALL // Manny Phone #: ###-####
BLD-Footing7/10/20187/10/20187/10/2018PPASS
DetailsJim Storey
JC Phone #: ###-####