BLD-Final | 3/26/2019 | 3/27/2019 | 3/27/2019 | A | PASS |
Mike Jordan
|
|
|
Cisel Phone #: ###-####
|
DOC - Permit Finaled | | | 3/27/2019 | | DONE |
|
|
|
permit was finaled, not for occupancy
|
FIRE-Final Inspection | 3/21/2019 | 3/22/2019 | 3/22/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Cizel Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 2/28/2019 | 3/1/2019 | 3/1/2019 | A | PASS |
Mike Jordan
|
|
|
Cecil Phone #: ###-####
|
BLD-Framing/Rough-in | 1/25/2019 | 1/25/2019 | 1/25/2019 | P | PASS |
Mike Jordan
|
|
|
Cecil Phone #: ###-####. Interior steel sted framed walls ok.
|
BLD-Aging Inspection | 12/21/2018 | 12/21/2018 | 12/21/2018 | | PASS |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 12/20/2018 | 12/20/2018 | 12/21/2018 | | PASS |
Mike Jordan
|
|
|
Per Cecil with Kreizenbeck construction Demo has begun for phase 2 of the project.
|
BLD-Final | 8/7/2018 | 8/8/2018 | 8/8/2018 | A | PART |
Mike Jordan
|
|
|
Cecil Phone #: ###-####. Ok for temp occ for phase 1. Phase to be started in feb or march of 2019 (infusion room) will Need to request extnsion after 90 days.
|
FIRE-Final Inspection | 8/7/2018 | 8/8/2018 | 8/7/2018 | A | PART |
Troy Cobbley
|
|
|
A temp for life safety is being given with the Building Code Officials permission until the remaining work is performed.
Cecil Phone #: ###-####
|
FIRE-Final Inspection | 8/2/2018 | 8/3/2018 | 8/6/2018 | A | FAIL |
Troy Cobbley
|
|
|
Life safety is ready to sign off or be given a temporary at the Boise City Building Code Officials discression.
Cecil Phone #: ###-####
|
BLD-Framing/Rough-in | 3/22/2018 | 3/23/2018 | 3/23/2018 | A | PASS |
Mike Jordan
|
|
|
Cecil Phone #: ###-####. Interior steel stud framed walls in Rooms 102,103,and 104.
|