Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberBLD18-00494
StatusFinaled
Name REILLY CONSTRUCTION LLC
Site Address 4455 E WARM SPRINGS AVE
Project NameAspen Valley Senior Living
Customer Number 
ePlanReviewYes
Description
(ASPEN VALLEY SENIOR LIVING – ASSISTED LIVING AND MEMORY CARE FACILITIES) (DRH17-00409) (3-4-19 PLAN MODIFICATION TO CONSTRUCT TWO SHADE TRELLIS STRUCTURES WITHIN THE COURTYARDS SERVING AN ASSISTED LIVING AND MEMORY CARE FACILITY. EACH COURTYARD WILL HAVE ONE TRELLIS. WORK INCLUDES CONCRETE FOOTINGS INSTALLED BELOW AN EXISTING CONCRETE SLAB ON GRADE, METAL COLUMNS, METAL BEAMS, METAL JOISTS, AND METAL LATTICE OPEN TO THE SKY. ETC.) (9-27-18 PLAN MODIFICATION TO CLARIFY WHERE CEILING RADIATION DAMPERS, COMBINATION SMOKE AND FIRE DAMPERS, AND FIRE DAMPERS ARE REQUIRED.) The fire sprinkler system is used for building area increase and for occupancy. The footings, foundations, under slab plumbing, and concrete slab on grade were done early start permit BLD18-01504. To construct a 47,379 square foot, one story building (33,224 square feet West “building” and 14,155 square feet East “building” separated by a 2-hr fire wall) to be used as an assisted living facility (50 units) and as a memory care facility (16 units having a total floor area of about 6,853 square feet). Within the assisted living facilities, occupants are expected to be able to respond to an emergency situation without assistance. Within the memory care facility, occupants are expected to need assistance to respond to an emergency situation. In both facilities, the need for bed movement is not expected within or between smoke compartments (i.e. no one is confined to their bed). Work is to include concrete footings, concrete stem walls, concrete pedestals, concrete slab on grade with thickened sections to support interior bearing walls, exterior and interior wood stud walls, exterior and interior wood stud bearing walls with headers at openings, exterior and interior wood stud shear walls with hold downs, wood beams and columns, wood trussed roof system with girder trusses, wood roof sheathing, exterior windows, exterior doors, board and batten siding, lap siding, manufactured stone wainscot, wood trellis accent awnings, metal accent awnings, corrugated metal siding, asphalt shingles, standing seam metal roofing, a 6 foot tall masonry screen wall, a 6 foot tall masonry trash enclosure, and a porte cochere. Special Inspection is required for soils, concrete, shear walls, and roof diaphragms. The design for roof trusses is a deferred submittal item. Other work includes 22 “Unit A” assisted living units each having a toilet/shower room (375 sq. ft. each), 26 “Unit B” assisted living units each having a toilet/shower room (467 sq. feet each), 1 “Unit D” assisted living unit having a toilet/shower room (600 sq. ft.), 1 “Unit E” assisted living unit having a toilet/shower room (467 sq. ft.), and 16 “Unit C” memory care sleeping units each having a toilet room (208 sq. ft. each), a Men’s multi-user toilet room accessible to the disabled, a Women’s multi-user toilet room accessible to the disabled, two single-user toilet rooms accessible to the disabled, a commercial kitchen, a Type I grease hood and duct system, a Type II dishwasher hood and duct system, make-up air, exterior grease trap, a 2-hr fire wall to create separate buildings for building area, 1-hr smoke barrier walls to create smoke compartments, millwork, and interior finishes. At least 2 of the assisted living units are required to comply as “accessible units”. The rest are required to comply as “Type B dwelling units”. All of the memory care units will comply as “accessible units”. A separate permit is required for the future gazebo and trellis. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/21/20195/21/20195/21/2019PPASS
DetailsBrandon Shaw
DOC - Permit Finaled5/21/20195/21/20195/21/2019PPASS
DetailsBrandon Shaw
BLD-Final5/10/20195/10/20195/10/2019PCANC
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Scott Simons
BLD-Final5/8/20195/10/20195/10/2019APART
DetailsBrandon Shaw
Temp. C of O is OK'd, see FIR18-00690 notes- Tested system. TCO of 10 days granted to verify 6 corrections. Approved by Ron Johnson

ada room strobes do not turn off until reset.
sounders in rooms 101, 107, 118 sound steady (bad base).

2 smokes in beam pockets to be lowered to bottom of beam (greater than .1 less than .4)
FIRE-Final Inspection5/8/20195/10/20195/10/2019PPASS
DetailsMark Scharfen
Passed fire life safety.n e-lights, exit lights and extinguishers all checked.

Scott Phone #: ###-####
BLD-Ceiling Grid Inspection4/1/20194/1/20194/1/2019PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Scott Simons
BLD-Wall cover1/29/20191/29/20191/29/2019PPASS
DetailsBrandon Shaw
Drywall layering area B...
BLD-Energy code compliance1/18/20191/18/20191/18/2019PPART
DetailsBrandon Shaw
Area B exterior walls, ok to insulate...
BLD-Framing/Rough-in1/15/20191/15/20191/15/2019PPASS
DetailsBrandon Shaw
Front and back patio cover soffits...
BLD-Wall cover1/11/20191/11/20191/11/2019PPASS
DetailsBrandon Shaw
Layering drywall Area C...
BLD-Wall cover1/7/20191/8/20191/8/2019APART
DetailsBrandon Shaw
Ceiling drywall layering inspection, rooms only, BLDG C
BLD-Energy code compliance1/2/20191/3/20191/3/2019APART
DetailsBrandon Shaw
Section C energy code compliance
BLD-Other12/27/201812/27/201812/27/2018PPART
DetailsBrandon Shaw
Drywall layer inspection Area D, East wing...
BLD-Other12/20/201812/21/201812/21/2018APART
DetailsBrandon Shaw
Drywall 2nd layer area D, west wing...
BLD-Other12/17/201812/18/201812/18/2018APART
DetailsBrandon Shaw
Area D west wing rooms,drywall...
BLD-Energy code compliance12/11/201812/12/201812/12/2018APART
DetailsBrandon Shaw
Energy code for area D
BLD-Wall cover12/3/201812/4/201812/4/2018APART
DetailsBrandon Shaw
Layering drywall hallway Area A
BLD-Other11/29/201811/30/201811/30/2018APART
DetailsBrandon Shaw
Drywall layering Area A, resident rooms
BLD-Other11/27/201811/28/201811/28/2018APART
DetailsBrandon Shaw
Drywall ceiling joint overlapping, BLDG A
OK to cover with second layer
BLD-Framing/Rough-in11/19/201811/20/201811/20/2018APART
DetailsBrandon Shaw
Framing Area A Phone #: ###-#### Inspection requested via web by Scott Simons
BLD-Framing/Rough-in11/19/201811/19/201811/19/2018PCANC
DetailsJim Sly
Framing Area A Phone #: ###-#### Inspection requested via web by Scott Simons
BLD-Energy code compliance11/13/201811/14/201811/14/2018PPART
DetailsBrandon Shaw
Tenting and spray foam
OK to insulate exterior...
BLD-Framing/Rough-in11/7/201811/8/201811/8/2018APART
DetailsBrandon Shaw
OK to insulate exterior walls, BLDG A...
BLD-Other11/6/201811/6/201811/6/2018PDONE
DetailsBrandon Shaw
Smoke dampers, access panels, and fire wall penetrations...
BLD-Conference10/30/201810/30/201810/30/2018PDONE
DetailsBrandon Shaw
Finaled by mistake, per Brandon Shaw 30OCT2018
DOC - Permit Finaled10/30/201810/30/201810/30/2018PPASS
DetailsBrandon Shaw
BLD-Conference10/24/201810/26/201810/26/2018ACANC
DetailsBrandon Shaw
Conference on area B fire rated partitions and ceiling height changes Phone #: ###-#### Inspection requested via web by Scott Simons
BLD-Other10/23/201810/23/201810/23/2018PDONE
DetailsBrandon Shaw
Fire wall final layer inspection and also final shear wall inspection Phone #: ###-#### Inspection requested via web by Scott Simons
BLD-Wall Bracing10/23/201810/23/201810/23/2018PPART
DetailsBrandon Shaw
Exterior shear done...
BLD-Other10/23/201810/23/201810/23/2018PPART
DetailsBrandon Shaw
Fire Walls, BLDG's C & D
BLD-Conference10/17/201810/17/201810/17/2018PDONE
DetailsBrandon Shaw
Clarifications on firewall and fire chase requirements

Smoke partition, BLDG's C/D...
Exhaust and Make-up air, O2 room, BLDG A...
BLD-Wall cover10/10/201810/10/201810/10/2018PPART
DetailsBrandon Shaw
Firewall - Second layer, South side, BLD C
First layer, North side, BLD C...
BLD-Other9/25/20189/26/20189/26/2018APART
DetailsBrandon Shaw
Fire wall, first layer
BLD-Wall Bracing9/25/20189/26/20189/26/2018APART
DetailsBrandon Shaw
BLDG C
BLD-Concrete9/12/20189/13/20189/13/2018PPASS
DetailsBrandon Shaw
Finish slab footings and floor for Area B Phone #: ###-#### Inspection requested via web by Scott Simons
BLD-Energy code compliance9/10/20189/11/20189/11/2018PPART
DetailsBrandon Shaw
Exterior gypsum inspection area d and area A
BLD-Framing/Rough-in8/26/20188/27/20188/27/2018APART
DetailsBrandon Shaw
Shear wall inspection for west wing area
BLD-Foundation8/24/20188/24/20188/24/2018PPASS
DetailsBrandon Shaw
Trash enclosure and screen wall
BLD-Wall Bracing8/23/20188/23/20188/23/2018PPART
DetailsBrandon Shaw
Memory care side- work in progress
BLD-Footing8/22/20188/23/20188/23/2018PPASS
DetailsBrandon Shaw
Trash encloser // Dane Phone #: ###-####