BLD-Wall Bracing | 11/8/2019 | 11/8/2019 | 11/8/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Conference | 11/7/2019 | 11/8/2019 | 11/8/2019 | P | CANC |
Tell Riley
|
|
|
ready for framing inspection so I can cover and begin roof, windows, doors, and siding installation. I will be onsite from one until 4:30 pm, thanks Paul Phone #: ###-#### Inspection requested via web by J Goll//needs shear inspection//
|
BLD-Other | 10/17/2019 | 10/18/2019 | 10/18/2019 | P | DONE |
Tell Riley
|
|
|
I would like to cover part of roof sheathing that is ready for roofing, The rough in framing is not quite complete, but will be complete this weekend, trusses are being installed next week, I would appreciate a review of rough in framing. I live within a mile, if I am not onsite, please call me and I can be there in 5 minutes. anytime between 11 and 4 works for me. Thanks Paul Phone #: ###-#### Inspection requested via web by J Goll
|
BLD-Other | 8/22/2019 | 8/23/2019 | 8/23/2019 | A | PART |
Tell Riley
|
|
|
Ready to pour concrete slab floor, 5 continuous loops for radiant floor heating are installed, they will be filled with water before pouring concrete which is scheduled to pour tuesday 10:30 am. Not sure which permit this inspection should be done, But want to make sure all is good, thanks Paul Phone #: ###-#### Inspection requested via web by J Goll//correction notice issued to have radiant pipe tested and inspected prior to pouring slab//vapor barrier installed//
|
BLD-Foundation | 4/17/2019 | 4/19/2019 | 4/19/2019 | P | PASS |
Jim Sly
|
|
|
Paul Phone #: ###-#### Inspection requested via web by J Goll
|
BLD-Footing | 7/18/2018 | 7/18/2018 | 7/19/2018 | P | PASS |
Jim Sly
|
|
|
Jesse Phone #: ###-####
|
BLD-Footing | 7/16/2018 | 7/17/2018 | 7/17/2018 | A | NR |
Mike Jordan
|
|
|
Jesse Phone #: ###-####. No one on site. no plans. looks like excavation not deep enough ? will need to reschedule.
|