Information based on query as of Sunday, April 28, 2024.
Permit Information
Permit NumberBLD18-00829
StatusIssued
Name GOLL INVESTMENTS LLC
Site Address 10938 W MCMILLAN RD
Project Namegoll residence
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 2016 sq. ft., two story (first story 1224 sq. ft., second story 794 sq. ft.) single family dwelling with 2 bedrooms, 2.5 bathrooms, approximately 72 sq. ft. of covered patio/porch and a 792 sq. ft. attached garage per the approved plans and any notations. Future Solar Collector systems noted on drawings will be under separate permit. Rescheck Energy Compliance. R-1C zoning and setbacks per planning.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Wall Bracing11/8/201911/8/201911/8/2019PPASS
DetailsTell Riley
BLD-Conference11/7/201911/8/201911/8/2019PCANC
DetailsTell Riley
ready for framing inspection so I can cover and begin roof, windows, doors, and siding installation. I will be onsite from one until 4:30 pm, thanks Paul Phone #: ###-#### Inspection requested via web by J Goll//needs shear inspection//
BLD-Other10/17/201910/18/201910/18/2019PDONE
DetailsTell Riley
I would like to cover part of roof sheathing that is ready for roofing,
The rough in framing is not quite complete, but will be complete this weekend, trusses are being installed next week, I would appreciate a review of rough in framing. I live within a mile, if I am not onsite, please call me and I can be there in 5 minutes. anytime between 11 and 4 works for me.
Thanks Paul Phone #: ###-#### Inspection requested via web by J Goll
BLD-Other8/22/20198/23/20198/23/2019APART
DetailsTell Riley
Ready to pour concrete slab floor, 5 continuous loops for radiant floor heating are installed, they will be filled with water before pouring concrete which is scheduled to pour tuesday 10:30 am. Not sure which permit this inspection should be done, But want to make sure all is good, thanks Paul Phone #: ###-#### Inspection requested via web by J Goll//correction notice issued to have radiant pipe tested and inspected prior to pouring slab//vapor barrier installed//
BLD-Foundation4/17/20194/19/20194/19/2019PPASS
DetailsJim Sly

Paul Phone #: ###-#### Inspection requested via web by J Goll
BLD-Footing7/18/20187/18/20187/19/2018PPASS
DetailsJim Sly
Jesse Phone #: ###-####
BLD-Footing7/16/20187/17/20187/17/2018ANR
DetailsMike Jordan
Jesse Phone #: ###-####. No one on site. no plans. looks like excavation not deep enough ? will need to reschedule.