Permit Information
Permit NumberBLD18-01080
StatusFinaled
Name OLIVE GROVE LLC
Site Address 4252 W ROSE HILL ST
Project NameOlive Grove Apartments II
Customer Number 
ePlanReviewYes
Description
(OLIVE GROVE APARTMENTS II – OLIVE GROVE SENIOR LIVING DEVELOPMENT – PHASE II) (DRH17-00590) (PUD17-00030) (10-30-18 PLAN MODIFICATION TO REMOVE THE FORMERLY PROPOSED ENERGY RECOVER EXHAUST AND MAKE-UP AIR SYSTEM FROM EACH APARTMENT AND TO PROVIDE A CONTINUOUS EXHAUST SYSTEM, WITHOUT MAKE-UP AIR, TO SERVE EACH APARTMENT.) The NFPA 13R fire sprinkler system is used for occupancy. To construct a new 10,276 square foot apartment building (5,248 square feet 1st story and 5,028 square feet 2nd story) having a total of 16 dwelling units (8 units per story). All ground floor units are required to comply as Type B dwelling units with at least one ground floor unit also complying as a Type A dwelling unit. Work is to include concrete footings, concrete stem walls, concrete piers, concrete slab on grade with thickened sections at interior bearing walls, wood stud bearing walls, wood columns, wood stud shear walls with structural sheathing and hold downs, a 1-hr fire-resistance-rated 2nd story floor constructed of wood joists and wood sheathing, an egress balcony and stairways to serve the 2nd story, guards at the 2nd story, exterior doors and windows, cast stone exterior wall wainscot, exterior horizontal lap siding, exterior vertical board and batten siding, 1-hr fire-resistance-rated wood truss roof system with wood roof sheathing, attic draft stops, fiberglass shingles, interior nonbearing walls, 1-hr fire-resistance-rated dwelling unit separation walls, millwork, and finishes. Special Inspection is required for soils, steel connectors for wood, and for anchors post-installed in hardened concrete. The design for the roof trusses is a deferred submittal item. Existing Building C and the new building are considered to be one building. Both buildings are required to have an NFPA 13R fire sprinkler system, both buildings are required to be of Type V-A construction, and both buildings are required to have an R-2 type fire alarm system. The separation of existing Building C from the other existing buildings on site is required to comply with the 2015 IBC based on an imaginary property line drawn between them. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/21/20196/21/20196/21/2019PPASS
DetailsTell Riley
window safety devices installed approved plans// final is complete//
BLD-Final6/20/20196/21/20196/21/2019AFAIL
DetailsTell Riley
Rocco- Phone #: ###-####//add window opening control device per plans// call for re-inspection//
FIRE-Final Inspection6/19/20196/19/20196/19/2019PPASS
DetailsTroy Cobbley
life safety passed

Matt Phone #: ###-####
BLD-Conference6/17/20196/18/20196/18/2019ADONE
DetailsTell Riley
Rocco Phone #: ###-####//discuss review notes for final inspect//
FIRE-Conference6/17/20196/18/20196/18/2019ADONE
DetailsTroy Cobbley
We went over life safety requirements, need plans, need to relocate fire extinguisher, need to verify the smoke alarms ring back.

Charles Phone #: ###-####
BLD-Other5/9/20195/9/20195/9/2019PPASS
DetailsJim Sly
Chuck- inspection for sauna tubes Phone #: ###-####
BLD-Energy code compliance3/6/20193/7/20193/7/2019APASS
DetailsJim Storey
Charles Phone #: ###-####
BLD-Framing/Rough-in3/4/20193/5/20193/5/2019APASS
DetailsJim Sly
Chuck Phone #: ###-####
BLD-Framing/Rough-in2/28/20193/1/20193/1/2019APASS
DetailsJim Sly
Steve-(GC) Phone #: ###-####
BLD-Framing/Rough-in2/20/20192/20/20192/21/2019PNR
DetailsDave Hannah
Steve-Charles hired GC-he''s calling in the inspections Phone #: ###-#### needs to fire caulk install draft stops in attic fix i joist cut by plumber
BLD-Conference1/31/20191/31/20191/31/2019PDONE
DetailsBrandon Shaw
First story appartments to be as per plans- 1 hour rated bath fans...
BLD-Conference1/11/20191/14/20191/14/2019APASS
DetailsDave Hannah
fire rating issues with duct work // Steve Phone #: ###-#### ok to use metal duct for ext duct
BLD-Framing/Rough-in1/2/20191/2/20191/2/2019PPART
DetailsJim Sly
Steve Phone #: ###-####
Truss repairs.....OK above deck....OK to cover when trades approved in that area.
BLD-Framing/Rough-in12/12/201812/13/201812/13/2018ADONE
DetailsJim Sly
Charles Phone #: ###-####
Consultation.........
BLD-Wall Bracing11/13/201811/13/201811/13/2018PDONE
DetailsJim Sly
Charles Phone #: ###-####
Walk thru ......appears OK.......pending special insp. approval.
BLD-Conference10/29/201810/29/201810/30/2018PDONE
DetailsJim Sly
Charles Phone #: ###-####
BLD-Conference10/1/201810/2/201810/2/2018ADONE
DetailsJim Sly
Charles Phone #: ###-####
Inspection of.....Footings for columns, foam insulation at wall, vapor barrier, thickened slab.....all OK.
BLD-Foundation8/24/20188/27/20188/27/2018APASS
DetailsDave Hannah
Charles Phone #: ###-####
BLD-Footing8/23/20188/23/20188/23/2018APASS
DetailsJim Sly
BLD-Foundation8/22/20188/23/20188/23/2018ACANC
DetailsJim Sly
Chuck Phone #: ###-####
BLD-Conference8/22/20188/22/20188/22/2018PDONE
DetailsJim Sly
Charles Phone #: ###-####
BLD-Conference8/15/20188/15/20188/16/2018PDONE
DetailsJim Sly
Chuck Phone #: ###-####