Information based on query as of Wednesday, May 8, 2024.
Permit Information
Permit NumberBLD18-01250
StatusFinaled
Name EKC INC
Site Address 222 N 8TH ST
Project NameFidelity/Montandon Awnings
Customer Number 
ePlanReviewYes
Description
(FIDELITY / MONTANDON BUILDING – AWNINGS AT 8TH STREET AND IDAHO STREET) (DRH18-00043) (CZC17-00279) The fire sprinkler system is used to substitute for 1-hr fire-resistance-rated construction. To construct a new steel awning (2,145 square feet total) on the 8th Street side (6 feet 10 inches at upper projection and 13 feet 9 inches at the lower projection) and on the Idaho Street side (6 feet 9 inches projection) of the Fidelity / Montandon Building. The awnings will cover fenced sidewalk dining and drinking seating for “Diablo & Son’s” and “Bittercreek Alehouse / Red Feather Lounge”. The ceiling of the awnings will have a minimum 10 foot clearance above the sidewalk. The awning frame will be constructed of steel channels, tube steel beams, cantilevered tube steel beams, and tube steel outriggers. The frame will be attached to existing masonry and/or concrete building columns with post-installed anchors. The awning will have tube steel beams, steel angles, steel decking, glass mat sheathing on top of the steel decking, a fully adhered PVC roofing membrane on top of the glass mat sheathing, and a 2 x 2 lay-in ceiling grid with tin panels and light fixtures below. A sloped 2 inch diameter steel rod with clevis connections at the awning and at the existing exterior wall of the building will also support the awning. A steel clevis plate with through bolts and backing plate (or anchors post-installed in masonry or hardened concrete) will be provided to connect the sloped steel rods to the existing building at approximately the same elevation as the 2nd story floor diaphragm. The roof of the awnings will slope away from the building and will drain to the planters below via down spouts. Special Inspection is required for welding, for bolting, and for anchors post-installed in masonry or hardened concrete. Special Inspection is also required to investigate the 10 existing building columns and the exterior walls that will support the new canopy by ground penetrating radar or other means to establish the column and wall base material and reinforcing. Once the existing conditions are determined, a structural evaluation is required to verify that the existing elements will not be overloaded by the new awnings. This structural evaluation is a deferred submittal item. A retractable canvas awning will also be installed next to the fixed steel awning on the Idaho Street side. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The area below the fixed awning is required to have fire sprinkler coverage. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  7/17/2019 DONE
Per passing Building Final inspection on 7/2/19 by David H
BLD-Final6/29/20197/2/20197/5/2019APASS
DetailsDave Hannah
Please call me prior to inspection. I''ll meet you onsite and hand over the missing SI report needed for final inspection and permit closure. Phone #: ###-#### Inspection requested via web by Brandon McCurdy
BLD-Final4/18/20194/19/20194/19/2019AFAIL
DetailsJim Storey
As requested, I''ll bring the SI final acceptance letter with me to hand over during inspection. Phone #: ###-#### Inspection requested via web by Brandon McCurdy Brandon McCurdy mail box full// not on site// singage not in place// zoning not signed off
BLD-Final4/16/20194/17/20194/17/2019ANR
DetailsJim Storey
SI report emailed on 1/24/19. Request permit to be finaled. Phone #: ###-#### Inspection requested via web by Brandon McCurdy
BLD-Final1/23/20191/24/20191/24/2019ANR
DetailsJim Storey
Request building final and permit to be closed out. Phone #: ###-#### Inspection requested via web by Brandon McCurdy need si report.
FIRE-Final Inspection12/13/201812/14/201812/14/2018APASS
DetailsJim Page
Fire sprinkler inspection complete, no fire alarm modifications. Final life fire safety inspection for scope of work complete.Dale Phone #: ###-####
BLD-Framing/Rough-in10/1/201810/1/201810/1/2018PPASS
DetailsDave Hannah
Dale Phone #: ###-####
BLD-Ceiling Grid Inspection9/20/20189/21/20189/21/2018APASS
DetailsDave Hannah
Dale Phone #: ###-####
BLD-Final12/13/201812/14/2018 P 
DetailsDave Hannah
Dale Phone #: ###-####