BLD-Final | 1/2/2020 | 1/3/2020 | 1/3/2020 | A | PASS |
Brandon Shaw
|
|
|
Please call when you are on your way. ###-#### Phone #: ###-#### Inspection requested via web by Mark Roberts
|
DOC - Permit Finaled | 1/3/2020 | 1/3/2020 | 1/3/2020 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 11/26/2019 | 11/27/2019 | 11/27/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire aalrm inspection is complete, fire extinguishers are placed with current inspection tags, knox box is located by the FDC. Final life fire safety inspection for area of work complete, signature card was destroyed, no signatures provided.
Please call when on route. Thank you Phone #: ###-#### Inspection requested via web by Mark Roberts
|
FIRE-Final Inspection | 11/19/2019 | 11/19/2019 | 11/19/2019 | P | FAIL |
Jim Page
|
|
|
Site work for fire truck access is not complete, fire truck access must be complete before life fire safety can be signed off per note number 1 of building permit fire code review. Provide signage for fire sprinkler riser room as well as fire alarm control panel per note number 14. Provide address numbers on both east and south sides per boise municipal code 505.3. Fire sprinkler system requires a re-hydro due to the amount of corrections that were made.
Mark - Fire/Life Safety. Working with sprinkler contractor to get inspection for FIR19-00111 this afternoon as well. Phone #: ###-####
|
FIRE-Final Inspection | 11/15/2019 | 11/18/2019 | 11/18/2019 | A | CANC |
Troy Cobbley
|
|
|
Not ready for final due to the project related fire sprinkler permit not being finaled yet. Mark and I did discuss general life safety requirements. It appears the new fire extinguishers need annual inspection. Mark Phone #: ###-####
|
BLD-Conference | 11/11/2019 | 11/12/2019 | 11/12/2019 | A | DONE |
Brandon Shaw
|
|
|
Pre final walk thru...
|
BLD-Aging Inspection | 11/12/2019 | 11/12/2019 | 11/12/2019 | | DEFR |
Brandon Shaw
|
|
|
Work in progress...
|
Extend Permit 90/180 days | 11/12/2019 | 11/12/2019 | 11/12/2019 | P | DONE |
Brandon Shaw
|
|
|
|
BLD-Wall cover | 6/28/2019 | 7/1/2019 | 7/1/2019 | A | PASS |
Brandon Shaw
|
|
|
Need to check that RC channel is approved for cover. Please call me when you''re on your way. Phone #: ###-#### Inspection requested via web by Mark Roberts
|
BLD-Other | 6/27/2019 | 6/28/2019 | 6/28/2019 | A | NR |
Tony Young
|
|
|
Need to check that RC channel is approved for cover. Please call me when you''re on your way. Phone #: ###-#### Inspection requested via web by Mark Roberts
|
BLD-Energy code compliance | 6/24/2019 | 6/25/2019 | 6/25/2019 | A | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Wall cover | 6/20/2019 | 6/21/2019 | 6/21/2019 | A | FAIL |
Jim Storey
|
|
|
First floor inspection please. Phone #: ###-#### Inspection requested via web by Mark Roberts unable to contact missing rc and fire gyp unusable spaces and line sets not fire chalked/ stair glbs not alowed to bear on concrete.
|
BLD-Wall cover | 6/19/2019 | 6/20/2019 | 6/20/2019 | A | PASS |
Brandon Shaw
|
|
|
Second floor only please. Thank you Phone #: ###-#### Inspection requested via web by Mark Roberts
|
BLD-Energy code compliance | 6/17/2019 | 6/17/2019 | 6/17/2019 | P | PART |
Brandon Shaw
|
|
|
Ok to cover...
|
BLD-Conference | 6/10/2019 | 6/11/2019 | 6/11/2019 | A | DONE |
Brandon Shaw
|
|
|
Talked with Brandon, we are planning on meeting onsite at 9 AM. Thank you Phone #: ###-#### Inspection requested via web by Andy Eells
|
BLD-Framing/Rough-in | 6/7/2019 | 6/10/2019 | 6/10/2019 | A | DEFR |
Brandon Shaw
|
|
|
Approved plans are in the riser room Phone #: ###-#### Inspection requested via web by Andy Eells
|
BLD-Framing/Rough-in | 6/7/2019 | 6/7/2019 | 6/7/2019 | P | FAIL |
Brandon Shaw
|
|
|
Need Mech rough-in...
|
BLD-Conference | 5/2/2019 | 5/2/2019 | 5/2/2019 | P | PART |
Brandon Shaw
|
|
|
Pre-framing/ Fire caulking...
|
BLD-Framing/Rough-in | 3/28/2019 | 3/28/2019 | 3/28/2019 | P | PART |
Brandon Shaw
|
|
|
Partial framing inspection Soffits and stairwells...
|
BLD-Wall Bracing | 3/14/2019 | 3/15/2019 | 3/15/2019 | A | PASS |
Mike Jordan
|
|
|
Shear inspection. Approved plans are in garage. I would like to meet inspector on site please give me a call ###-#### Phone #: ###-#### Inspection requested via web by Andy Eells. Exterior and interior shear ok.
|
BLD-Conference | 1/23/2019 | 1/23/2019 | 1/23/2019 | P | DONE |
Brandon Shaw
|
|
|
|
BLD-Footing | 1/3/2019 | 1/3/2019 | 1/3/2019 | P | PASS |
Brandon Shaw
|
|
|
Frost protection is required...
|
BLD-Foundation | 11/6/2018 | 11/7/2018 | 11/7/2018 | A | PASS |
Brandon Shaw
|
|
|
Jared Draper is concrete guy. Requested 9 am please if possible. 2500 psi concrete spec. Inspection for foundation wall Phone #: ###-#### Inspection requested via web by Andy Eells
|
BLD-Footing | 11/2/2018 | 11/5/2018 | 11/5/2018 | A | PASS |
Jim Storey
|
|
|
MTI scheduled for bar placement at 10am on the 5th. 2500psi spec mix. Sawtooth L.S staked out building Phone #: ###-#### Inspection requested via web by Andy Eells rebar ok si pending reports
|