Information based on query as of Tuesday, May 14, 2024.
Permit Information
Permit NumberBLD18-01779
StatusFinaled
Name ANDERSEN CONSTRUCTION COMPANY IDAHO
Site Address 1055 N CURTIS RD
Project NameSt. Al's - Conf Rm and MRI
Customer Number 
ePlanReviewYes
Description
(ST. ALPHONSUS HOSPITAL – REMODEL FOR CONFERENCE ROOM AND NEW MRI – 1ST STORY – BELOW SOUTH TOWER) (3-4-19 PLAN MODIFICATION TO CONSTRUCT A WALL AND INSTALL A 36 INCH WIDE DOOR WITH A TEMPERED GLASS VIEW PANEL AND ACCESS CONTROL HARDWARE TO SEPARATE A WAITING AREA FROM CLINIC SPACE. ACCESS CONTROL WILL BE ON THE WAITING AREA SIDE OF THE DOOR. FREE EGRESS IS ALWAYS REQUIRED FROM THE OPPOSITE SIDE. THE EXISTING SUSPENDED CEILING WILL BE MODIFIED TO ACCOMMODATE THE NEW WALL. A DIFFUSER WILL BE RELOCATED AND SOME HORN/STROBE WORK WILL BE DONE.) The fire sprinkler system is used for occupancy and for high rise. Demolition work includes removing existing concrete walls and concrete floor slabs on grade. To remodel a 3,845 square foot area located on the 1st story of St. Alphonsus hospital below the South tower. Work is to include a 584 square foot conference room, a 185 square foot break room, a dressing room with a bench accessible to the disabled, a relocated door in an existing toilet room, a door opening and minimum 20 minute door in a smoke barrier wall at an existing smoke compartment and I-2 rated corridor, new smoke dampers at duct penetrations of smoke barrier walls, a new door opening and an enlarged door opening in an existing 2-hr exit passageway wall and smoke barrier wall, 90 minute fire doors and smoke- and draft-control assemblies installed in the new door openings, a new concrete slab on grade, horizontal sliding glass wall panels, privacy curtains, suspended acoustical ceilings, gypsum board ceilings, millwork, and finishes. Two existing care suites (2,285 square feet and 1,341 square feet) will be combined into one 3,626 square foot care suite, lockers will be relocated, and a new 449 square foot MRI magnet room with copper shielding will be constructed. Some existing concrete walls and fire-resistance-rated walls will be demolished so that the new equipment can be moved into place, after which infill fire-resistance-rated walls will be constructed. Headers constructed of steel angle members will be installed at the top of the new openings in concrete walls. Special Inspection is required for anchors post-installed in hardened concrete. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/23/201910/23/201910/23/2019PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Darius Saxton
BLD-Final1/24/20191/25/20191/25/2019APART
DetailsMike Jordan
As early as possible - Please call Ami. Phone #: ###-#### Inspection requested via web by Ami Ostrow. OK for temp occ. Wating for new doors in the 2hr. exit passageway.
BLD-Conference1/24/20191/25/20191/25/2019ADONE
DetailsMike Jordan
Call Darius, please. Phone #: ###-#### Inspection requested via web by Ami Ostrow
BLD-Conference1/24/20191/24/20191/24/2019PDEFR
DetailsJim Storey
Call Darius, please. Phone #: ###-#### Inspection requested via web by Ami Ostrow out of time
BLD-Conference1/23/20191/23/20191/23/2019PDONE
DetailsMike Jordan
Please call Darius. Phone #: ###-#### Inspection requested via web by Ami Ostrow
FIRE-Final Inspection1/22/20191/23/20191/23/2019APASS
DetailsJim Page
Final life fire safety inspection for area of work complete.

Phone #: ###-#### Inspection requested via web by Darius Saxton
BLD-Ceiling Grid Inspection1/10/20191/10/20191/10/2019APASS
DetailsMike Jordan
As early as possible, please. Call Darius when on site. Thank you! Phone #: ###-#### Inspection requested via web by Ami Ostrow
BLD-Final1/7/20191/8/20191/8/2019PPART
DetailsMike Jordan
Partial for conference room. Please call Darius Phone #: ###-#### Inspection requested via web by Ami Ostrow. Conferance room only ok to occupy.
FIRE-Final Inspection1/7/20191/8/20191/8/2019APART
DetailsTroy Cobbley
Life safety for Conference Room only is passed.


Partial for conference room. Please call Darius Phone #: ###-#### Inspection requested via web by Ami Ostrow
BLD-Ceiling Grid Inspection1/2/20191/2/20191/2/2019APASS
DetailsMike Jordan
Early if possible. Phone #: ###-#### Inspection requested via web by Darius Saxton
BLD-Framing/Rough-in12/13/201812/14/201812/13/2018APASS
DetailsMike Jordan
Please come as early as possible - call Darius. Phone #: ###-#### Inspection requested via web by Ami Ostrow
BLD-Ceiling Grid Inspection12/4/201812/5/201812/5/2018APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Darius Saxton. Storage room hardlid and mag room.
BLD-Ceiling Grid Inspection11/30/201812/3/201811/30/2018ACANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Darius Saxton Inspection cancelled from web by: Darius Saxton
FIRE-Conference11/13/201811/14/201811/14/2018ADONE
DetailsTroy Cobbley
We spoke about doing phase sign offs for this area of work.
Call Darius when on site, please Phone #: ###-#### Inspection requested via web by Ami Ostrow
BLD-Framing/Rough-in11/8/201811/8/201811/8/2018PPASS
DetailsMike Jordan
Please call Darius when you get to the hospital. Phone #: ###-#### Inspection requested via web by Ami Tracy
BLD-Framing/Rough-in10/31/201810/31/201810/31/2018PPASS
DetailsMike Jordan
Partial to cover - please call Darius. Phone #: ###-#### Inspection requested via web by Ami Tracy
BLD-Conference10/5/201810/8/201810/8/2018APART
DetailsMike Jordan
Call Darius, please. Phone #: ###-#### Inspection requested via web by Ami Tracy. Interior steel stud framed wall for New MRI room. Ok to one side only for install of shielding.