Information based on query as of Thursday, May 16, 2024.
Permit Information
Permit NumberBLD18-02570
StatusFinaled
Name EKC INC
Site Address 802 W BANNOCK ST
Project NameVanilla - Suite #1400
Customer Number 
ePlanReviewYes
Description
(Vanilla – SUITE #1400 MEZANINE CEILING REPLACEMENT) //Plan modification #2: to upgrade existing walls in the mechanical closet adjacent to the stair enclosure. Work to include: 2-hour rated wall, a new 90-minute door, a new fire/smoke damper at existing duct penetration. 4-2-2019 JG// - //Plan modification #1: to remove metal panel ceiling from scope of work and replace with acoustic ceiling, add new walls to create a conference room and extend new design floor ceiling over new conference room on the 14th floor. 3/1-2019 JG// NO OCCUPANCY ALLOWED UNDER THIS PERMIT. TENANT SHALL APPLY FOR CERTIFICATE OF OCCUPANCY PRIOR TO OCCUPYING THE SPACE. Permit is to remodel an existing 1,236 sq. ft. business tenant space. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, removal of select suspended acoustic ceiling, removal of select guardrail and relocate, new construction of metal panel ceiling attached to existing structural ceiling, new light fixtures, electrical work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. Note 1: if floor/ceiling is to be replaced as noted on plans structural engineering calculation are required and shall submit for review and have prior approval for the deferred submittals of engineering documents. Note 2: special inspection is required, see attached #310 form. This building is fully Fire Sprinklered because building is a high rise. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/16/20195/17/20195/17/2019PPASS
DetailsDave Hannah
Call ahead // Jon Phone #: ###-####
FIRE-Final Inspection5/16/20195/17/20195/17/2019APASS
DetailsMark Scharfen
South stair exit light needs battery, extinguishers on site but not hung. Signed off-vanilla finish. Will be installed by end of day.

Call ahead // Jon Phone #: ###-####
DOC - Permit Finaled  5/17/2019 DONE
final passed 5/17/19 permit is not for occupancy, TI only
BLD-Framing/Rough-in4/25/20194/25/20194/26/2019PPASS
DetailsDave Hannah
call for access- John Phone #: ###-####
BLD-Framing/Rough-in4/17/20194/17/20194/17/2019PPART
DetailsJim Storey
Jon Phone #: ###-#### struc. floor south mez ok to deck/ si reports pending.
BLD-Framing/Rough-in3/20/20193/21/20193/21/2019APASS
DetailsDave Hannah
Jon-box beam header Phone #: ###-####
BLD-Other2/25/20193/4/20193/4/2019ADONE
DetailsDave Hannah
Status? work is in progress
BLD-Conference2/21/20192/21/20192/21/2019PDONE
DetailsDave Hannah
Jon Phone #: ###-####
BLD-Conference11/30/201812/4/2018 A 
DetailsDave Hannah
Status? work completed? Permit not issued.