BLD-Final | 10/17/2019 | 10/18/2019 | 10/18/2019 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
FIRE-Final Inspection | 8/14/2019 | 8/15/2019 | 8/15/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items have been completed, final life fire safety inspection complete.
Mike Phone #: ###-####
|
BLD-Final | 7/18/2019 | 7/19/2019 | 7/19/2019 | P | NR |
Jim Storey
|
|
|
mIKE Phone #: ###-#### ok to stock racking per fire tco
|
FIRE-Final Inspection | 7/18/2019 | 7/19/2019 | 7/19/2019 | A | PART |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Partial final inspection complete for life fire safety, last remaining items to be completed before final life fire safety sign off is provide FACP signage on door leading to fire panel, install fire lane signage as specified in review comments under notes 9 and 10 of the building permit fire code review comments. Need to verify if old fire pump room is staying in place ot being removed, if existing pump room stays then fire sprinklers will need to be provided. 30 day TCO authorized per conversation with Ron Johnson with Boise Fire contingent on the 3 noted items getting completed.
mIKE Phone #: ###-####
|
FIRE-Final Inspection | 7/15/2019 | 7/16/2019 | 7/16/2019 | P | CANC |
Jim Page
|
|
|
Cancelled per conversation with point of contact, fire alarm inspection has been cooridanted with me, Apex and any parties associated with access to the existing building for 7AM on 19JULY2019. Mike Phone #: ###-####
|
BLD-Final | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | CANC |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 7/14/2019 | 7/15/2019 | 7/15/2019 | A | FAIL |
Jim Page
|
|
|
Relocate exit signs that are blocked due to racking placement. Fire hydrants need to be rotated so that the large hose connection (Steamer Connection) is pointing at the fire lane as required.
Jim Wellman Phone #: ###-#### Inspection requested via web by Jim Wellman
|
BLD-Final | 7/14/2019 | 7/15/2019 | 7/15/2019 | A | NR |
Jim Storey
|
|
|
Jim Wellman Phone #: ###-#### Inspection requested via web by Jim Wellman
|
FIRE-Conference | 7/2/2019 | 7/3/2019 | 7/3/2019 | A | DONE |
Jim Page
|
|
|
Fire conference is complete, items that are not associated with construction are not to be stored in the warehouse. As of this entry the racking permit has not been inspected, the fire alarms cannot be completed due to the fire alarm permit being under review and no life fire safety inspection has been performed. I spoke with Ron Johnson with Boise Fire Department and he agrees with my decision.
call ahead // Mike Phone #: ###-####
|
FIRE-Conference | 6/25/2019 | 6/26/2019 | 6/26/2019 | A | DONE |
Jim Page
|
|
|
Fire conference complete, per international fire code, section 1013.1 requires exit signs to be visible within 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign.
Mike Phone #: ###-####
|
BLD-Conference | 6/4/2019 | 6/5/2019 | 6/5/2019 | P | DONE |
Jim Page
|
|
|
Fire conference complete.
Mike-Conference with Fire inspector- please call about an hor before Phone #: ###-####
|
BLD-Framing/Rough-in | 5/7/2019 | 5/8/2019 | 5/8/2019 | P | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-#### fire pump rm ok to cover
|
BLD-Ceiling Grid Inspection | 4/18/2019 | 4/18/2019 | 4/18/2019 | P | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/12/2019 | 4/15/2019 | 4/15/2019 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/9/2019 | 4/10/2019 | 4/10/2019 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/8/2019 | 4/9/2019 | 4/9/2019 | A | CANC |
Mike Jordan
|
|
|
Mike Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/4/2019 | 4/5/2019 | 4/5/2019 | A | PART |
Jim Storey
|
|
|
Mike Phone #: ###-#### east side ok
|
BLD-Ceiling Grid Inspection | 3/25/2019 | 3/25/2019 | 3/25/2019 | P | PART |
Jim Storey
|
|
|
Mike Phone #: ###-#### ok to instal tile as progressing across ceilling.
|
FIRE-Conference | 3/19/2019 | 3/19/2019 | 3/19/2019 | A | DONE |
Jim Page
|
|
|
General contractor has been notified as of this date that fire hydrants around project need to be made active during construction.
|