Permit Information
Permit NumberBLD18-02821
StatusFinaled
Name PARADIGM CONSTRUCTION COMPANY LLC
Site Address 3088 E WINDSONG DR
Project NameChristie Residence
Customer Number 
ePlanReviewNo
Description
***10/30/19 PLAN MODIFICATION FOR NEW GRADING PLAN*** This structure is required to be fully fire sprinklered in compliance with NFPA 13D**Permit for the construction of a new 4097 sq. ft., two story (lower floor is 1600 sq. ft., main floor level is 2497 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 550 sq. ft. of covered patio/porch and a 1656 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliace. R-1A/DA zoning and setbacks per planning. ***RDP***
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/4/201911/4/201911/5/2019PPASS
DetailsBrandon Shaw
Call when on the way to meet // Matt Phone #: ###-####
DOC - Permit Finaled11/5/201911/5/201911/5/2019PPASS
DetailsBrandon Shaw
BLD-Conference10/29/201910/30/201910/30/2019ADONE
DetailsBrandon Shaw
please call 1/2 hr prior. Was hoping to do a courtesy final. Thanks Jim Phone #: ###-#### Inspection requested via web by James Larkin
BLD-Energy code compliance6/26/20196/27/20196/27/2019PPASS
DetailsBrandon Shaw
Please call 1/2 hr prior. Thanks Jim Phone #: ###-#### Inspection requested via web by James Larkin
BLD-Framing/Rough-in6/25/20196/25/20196/25/2019PPASS
DetailsBrandon Shaw
please call 1/2 hr prior Thanks Jim Phone #: ###-#### Inspection requested via web by James Larkin
FIRE-Supply Line Cover6/19/20196/19/20196/19/2019ACANC
DetailsJim Page
Tenting inspection needs to be requested by the fire sprinkler contractor, this request is cancelled and future fire sprinkler related inspection must be done under associated FIR permit.

Insulation or tent over fire sprinkler piping that is in attic area of project. Not sure if we ordered the correct inspection? Phone #: ###-#### Inspection requested via web by James Larkin
BLD-Wall cover6/13/20196/14/20196/14/2019APASS
DetailsMike Jordan
Fire protection on Soffit cans. 2 layers of type x 5\8. Phone #: ###-#### Inspection requested via web by James Larkin
BLD-Wall Bracing6/3/20196/3/20196/3/2019PPASS
DetailsJim Storey
Jim Phone #: ###-####
BLD-Wall Bracing5/24/20195/28/20195/28/2019PCANC
DetailsBrandon Shaw
Please call 1/2 hr prior. Phone #: ###-#### >> Inspection requested via web by James Larkin Inspection cancelled from web by: James Larkin
BLD-Wall Bracing5/23/20195/24/20195/24/2019ACANC
DetailsBrandon Shaw
Please call 1/2 her prior. Thanks Jim Phone #: ###-#### >> Inspection requested via web by James Larkin Inspection cancelled from web by: James Larkin
BLD-Wall Bracing5/22/20195/23/20195/23/2019PCANC
DetailsBrandon Shaw
Please Call 1/2 prior Phone #: ###-#### >> Inspection requested via web by James Larkin Inspection cancelled from web by: James Larkin
BLD-Foundation4/26/20194/29/20194/29/2019APASS
DetailsDave Hannah
Edgar- foundation wall Phone #: ###-####
BLD-Footing4/23/20194/23/20194/23/2019PPASS
DetailsBrandon Shaw
edgir Phone #: ###-####
BLD-Footing4/22/20194/22/20194/22/2019PFAIL
DetailsJim Storey
retaining wall // Edgar Phone #: ###-#### no vert steel// bar in dirt at steps/ no plans on site.
BLD-Foundation2/1/20192/1/20192/1/2019PPASS
DetailsBrandon Shaw
wall- Ben Phone #: ###-####
BLD-Footing1/18/20191/18/20191/18/2019APASS
DetailsBrandon Shaw
Retaining wall footings
BLD-Foundation12/10/201812/11/201812/11/2018PCANC
DetailsBrandon Shaw
Please call 1/2 hr prior. Thanks Jim Phone #: ###-#### Inspection requested via web by James Larkin
BLD-Foundation12/10/201812/11/201812/11/2018APASS
DetailsBrandon Shaw
Work in progress...
Frost protection is reqired
BLD-Footing11/28/201811/28/201811/28/2018PPASS
DetailsBrandon Shaw
Work in progress
BLD-Footing11/27/201811/27/201811/27/2018PNR
DetailsBrandon Shaw
Need soil sub-grade submitted and approved by PW...
BLD-Footing11/26/201811/27/201811/27/2018ACANC
DetailsBrandon Shaw
Please call 1/2 hr prior. Thanks Jim Phone #: ###-#### >> Inspection requested via web by James Larkin Inspection cancelled from web by: James Larkin