Permit Information
Permit NumberBLD18-03228
StatusFinaled
Name HARDING HOMES INC
Site Address 1936 N 26TH ST
Project NameDewey Street Residence - South
Customer Number 
ePlanReviewYes
Description
***Prescriptive component energy approach*** Permit for the construction of a new 2,507 sq. ft., two story (first story 1,263 sq. ft., second story 1,244 sq. ft.) single family dwelling with 4 bedrooms, 4 bathrooms, approximately 475 sq. ft. of covered patio/porch and a 600 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. MDH
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Blower Door Test Results4/25/20194/26/20194/26/2019APASS
DetailsTony Young
Dennis Phone #: ###-####/// 3.5
BLD-Final4/25/20194/26/20194/26/2019APASS
DetailsTony Young
Dennis Phone #: ###-####
DOC - Permit Finaled4/26/20194/26/20194/26/2019PPASS
DetailsTony Young
BLD-Final4/25/20194/25/20194/25/2019PNR
DetailsTony Young
Dennis Phone #: ###-####,, needs blower door test,, fire caulking
BLD-Energy code compliance1/11/20191/11/20191/11/2019PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by James Jackson
BLD-Framing/Rough-in1/8/20191/8/20191/8/2019PPART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by James Jackson,, needs to verify rim joist insulation at garage warm wall,, strap beam/platre upstairs hall,, ok to insulate
BLD-Wall Bracing12/10/201812/10/201812/10/2018PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by James Jackson,, exterior ok
BLD-Conference11/14/201811/15/201811/15/2018PPART
DetailsTony Young
Gene Phone #: ###-####,, walk through to look at all the engineering,, ok so far,, work in progress
BLD-Conference10/29/201810/30/201810/30/2018APART
DetailsTony Young
Meet to discuss the overkill on this project. Phone #: ###-#### Inspection requested via web by James Jackson,, any changes need to go through the engineer
BLD-Foundation10/15/201810/15/201810/15/2018PPASS
DetailsBrandon Shaw
Work in progress
BLD-Footing10/12/201810/12/201810/12/2018PPASS
DetailsJim Sly
Willy Phone #: ###-####