BLD-Final | 5/6/2019 | 5/7/2019 | 5/7/2019 | A | PASS |
Mike Jordan
|
|
|
Brian Phone #: ###-####. Ok for trmp occ. All issues resolved. Will be ok for perm occ. once plumbing signs perm.
|
BLD-Final | 5/3/2019 | 5/6/2019 | 5/6/2019 | P | PART |
Mike Jordan
|
|
|
Brian Phone #: ###-####. Ok for temp occ. Needs to provide code compliant lever hardware on tanning room doors. Also reviewed special inspection report mfor the welding for new RTU supports. Also provde prrof of tempered glass in doors to tanning area.
|
FIRE-Final Inspection | 5/6/2019 | 5/6/2019 | 5/6/2019 | P | PASS |
Mark Scharfen
|
|
|
Checked extinguishers, exit lighting and emergency lighting. Passed fire life safety.
|
BLD-Final | 5/2/2019 | 5/3/2019 | 5/3/2019 | P | NR |
Mike Jordan
|
|
|
Brian Phone #: ###-####. Needs fire sprinkler and fire/life/safety finals.
|
BLD-Ceiling Grid Inspection | 4/30/2019 | 4/30/2019 | 4/30/2019 | P | PASS |
Jim Sly
|
|
|
Brian Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/26/2019 | 4/29/2019 | 4/29/2019 | P | NR |
Mike Jordan
|
|
|
Bryan Phone #: ###-####. Needs sprinkler rough in inspection first.
|
BLD-Framing/Rough-in | 3/22/2019 | 3/25/2019 | 3/25/2019 | A | PASS |
Mike Jordan
|
|
|
Brian Phone #: ###-####. Interior steel stud framed walls for phase 2, restrooms and locker rooms ok.
|
BLD-Framing/Rough-in | 3/18/2019 | 3/19/2019 | 3/19/2019 | A | PASS |
Mike Jordan
|
|
|
Brian Phone #: ###-####. Interior steel stud framed walls, phase 2, tanning area and IT room.
|
BLD-Framing/Rough-in | 3/14/2019 | 3/15/2019 | 3/18/2019 | P | PART |
Dave Hannah
|
|
|
Bryan Phone #: ###-#### north high wall between gym and rooms ok to cover
|
BLD-Framing/Rough-in | 3/4/2019 | 3/4/2019 | 3/4/2019 | P | PASS |
Mike Jordan
|
|
|
Bryan Phone #: ###-####. Interior steel stud framed walls and soffits only for phase 1.
|