BLD-Final | 10/23/2019 | 10/24/2019 | 10/24/2019 | A | PASS |
Tell Riley
|
|
|
Please call before. Phone #: ###-#### Inspection requested via web by Vaughn Pruett//approved plans provided//corrections made//upper kitchen moved to interior wall--only difference on plans//final complete per approved plans//
|
DOC - Permit Finaled | 10/24/2019 | 10/24/2019 | 10/24/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 10/17/2019 | 10/18/2019 | 10/18/2019 | A | FAIL |
Tell Riley
|
|
|
Please call before Phone #: ###-#### Inspection requested via web by Vaughn Pruett//correction notice issued//several items noted for code compliance//will need plans onsite for final as well//
|
BLD-Energy code compliance | 7/17/2019 | 7/17/2019 | 7/17/2019 | P | PART |
Tell Riley
|
|
|
Vaughn Phone #: ###-####//corrections made//designer printed new shear page--CS14 straps not needed//add insulation to wall between garage utility//
|
BLD-Framing/Rough-in | 7/12/2019 | 7/15/2019 | 7/15/2019 | A | PASS |
Tell Riley
|
|
|
Vaughn Phone #: ###-####//trusses ok//hold downs ok//add straps for shear walls per plans//ok to insulate only//
|
BLD-Framing/Rough-in | 7/11/2019 | 7/12/2019 | 7/12/2019 | A | FAIL |
Tell Riley
|
|
|
Vaugh Phone #: ###-####//add straps per plans//HDU anchors need 5" in concrete//need truss plans//correction notice posted..//
|
BLD-Wall Bracing | 6/10/2019 | 6/11/2019 | 6/11/2019 | A | FAIL |
Tell Riley
|
|
|
Vaughan Pruett Phone #: ###-####// no hold downs installed// obtain retro from designer for hold down install. call for re inspection.// ok to install house wrap. nailing ok per plans
|
BLD-Foundation | 5/1/2019 | 5/2/2019 | 5/2/2019 | P | PASS |
Jim Sly
|
|
|
Dustin-stem wall Phone #: ###-####
|
BLD-Footing | 4/26/2019 | 4/29/2019 | 4/29/2019 | A | PASS |
Jim Sly
|
|
|
Dustin Phone #: ###-####
|