BLD-Final | 8/12/2020 | 8/12/2020 | 8/12/2020 | P | PART |
Tony Young
|
|
|
Phase 2 TCO. Please call when in route Phone #: ###-#### Inspection requested via web by Chris Fuhrman// 2nd phase ok for temp occupancy
|
FIRE-Final Inspection | 8/12/2020 | 8/12/2020 | 8/12/2020 | P | PART |
Jim Page
|
|
|
Life fire safety inspection for TCO phase 2 complete, exit signs that were noted missing have been placed.
Phase 2 TCO. Please call when in route Phone #: ###-#### Inspection requested via web by Chris Fuhrman
|
BLD-Final | 8/5/2020 | 8/6/2020 | 8/6/2020 | A | PART |
Tony Young
|
|
|
Building Re-inspection. Access through South gate. Please call when in route Phone #: ###-#### Inspection requested via web by Chris Fuhrman// temp occupancy ok
|
BLD-Final | 7/17/2020 | 7/20/2020 | 7/20/2020 | P | PART |
Jim Storey
|
|
|
TCO Phone #: ###-#### Inspection requested via web by Chris Fuhrman handrail returns/ missing exit signs/ need smoke seal on fire door/ occ load signage/ temp occ
|
FIRE-Final Inspection | 7/17/2020 | 7/20/2020 | 7/20/2020 | A | PART |
Jim Page
|
|
|
Life fire safety inspection for TCO phase 1 complete.
TCO Phone #: ###-#### Inspection requested via web by Chris Fuhrman
|
FIRE-Final Inspection | 4/7/2020 | 4/7/2020 | 4/7/2020 | A | PART |
Jim Page
|
|
|
Fire sprinkler riser monitoring has been tested and complete, storage of furntiure in building is authorized. After this entry fire sprinklers are to remain active and monitored (Allowed to be put on test during normal working hours, fire sprinkler monitoring must be taken off of test at the end of the business day, if monitoring is not active then furntiure storage will be revoked).
|
BLD-Ceiling Grid Inspection | 4/2/2020 | 4/2/2020 | 4/2/2020 | P | PASS |
Dave Hannah
|
|
|
library, cafeteria ; music Phone #: ###-#### Inspection requested via web by Chris Fuhrman
|
BLD-Ceiling Grid Inspection | 2/28/2020 | 2/28/2020 | 2/28/2020 | A | PASS |
Jim Storey
|
|
|
no wires need at pirimtor admin and hallway ok to cover.
|
BLD-Ceiling Grid Inspection | 2/26/2020 | 2/27/2020 | 2/27/2020 | A | PART |
Jim Storey
|
|
|
1B Administration Area Phone #: ###-#### Inspection requested via web by Chris Fuhrman main wirers ok pending sica listing to not need perimitor wirers.
|
FIRE-Conference | 2/26/2020 | 2/27/2020 | 2/27/2020 | A | DONE |
Jim Page
|
|
|
Fire conferene complete.
Review new BSD occupancy and phasing schedule and requirements. Phone #: ###-#### Inspection requested via web by Chris Fuhrman
|
BLD-Framing/Rough-in | 2/20/2020 | 2/21/2020 | 2/21/2020 | A | PART |
Tony Young
|
|
|
Area C Gyp Ceilings Phone #: ###-#### Inspection requested via web by Chris Fuhrman.. ok pending trades
|
BLD-Ceiling Grid Inspection | 2/20/2020 | 2/21/2020 | 2/21/2020 | A | PART |
Tony Young
|
|
|
2B Classrooms Phone #: ###-#### Inspection requested via web by Chris Fuhrman,, ok pending trades
|
BLD-Ceiling Grid Inspection | 2/12/2020 | 2/12/2020 | 2/12/2020 | A | PASS |
Tony Young
|
|
|
Grid Ceiling 2A Phone #: ###-#### Inspection requested via web by Chris Fuhrman// work in progress,, ok
|
BLD-Framing/Rough-in | 2/12/2020 | 2/12/2020 | 2/12/2020 | A | PASS |
Tony Young
|
|
|
Hard Ceiling Area 2B and Cafe Phone #: ###-#### Inspection requested via web by Chris Fuhrman
|
BLD-Ceiling Grid Inspection | 1/30/2020 | 1/30/2020 | 1/30/2020 | P | PASS |
Dave Hannah
|
|
|
1A Phone #: ###-#### Inspection requested via web by Chris Fuhrman see plans for locations
|
BLD-Framing/Rough-in | 1/30/2020 | 1/30/2020 | 1/30/2020 | P | PASS |
Dave Hannah
|
|
|
Hard Ceilings 1B Phone #: ###-#### Inspection requested via web by Chris Fuhrman see plans for locations
|
BLD-Framing/Rough-in | 1/7/2020 | 1/7/2020 | 1/7/2020 | A | PART |
Tony Young
|
|
|
Gypsum Ceilings 1A - 2A Phone #: ###-#### Inspection requested via web by Chris Fuhrman// ok pending trades
|
BLD-Framing/Rough-in | 12/18/2019 | 12/18/2019 | 12/18/2019 | P | PART |
Tony Young
|
|
|
1B Please call Chris when in route Phone #: ###-#### Inspection requested via web by Chris Fuhrman// ok to start covering pending trades
|
FIRE-Conference | 12/13/2019 | 12/13/2019 | 12/13/2019 | P | DONE |
Jim Page
|
|
|
Fire conference complete, discussed items required for life fire safety for phase 1 occupancy.
Review phase 1 occupancy / egress plan. Please call Chris when in route. Thank you, Phone #: ###-#### Inspection requested via web by Chris Fuhrman
|
FIRE-Conference | 12/10/2019 | 12/11/2019 | 12/11/2019 | A | CANC |
Jim Page
|
|
|
Tried calling point of contact listed 2 times over a 15 minute time period, first time went right to voicemail but no message could be left because mailbox was full. 2nd call phone rang through, still went to voicemail but could not leave a message. procceeded to next inspection, conference will need to be rescheduled. This conference is cancelled.
Review phase 1 turnover plan. Please call Chris when in route. Thank you, Phone #: ###-#### Inspection requested via web by Chris Fuhrman
|
BLD-Wall cover | 12/6/2019 | 12/6/2019 | 12/6/2019 | P | PART |
Tony Young
|
|
|
Please call Chris when in route Phone #: ###-#### Inspection requested via web by Chris Fuhrman// area A1 and A2 ok to cover
|
BLD-Energy code compliance | 12/6/2019 | 12/6/2019 | 12/6/2019 | P | PASS |
Tony Young
|
|
|
Please call Chris when in route Phone #: ###-#### Inspection requested via web by Chris Fuhrman,, exterior insulation wrap ok
|
BLD-Framing/Rough-in | 12/5/2019 | 12/6/2019 | 12/6/2019 | A | PART |
Tony Young
|
|
|
Please call Chris when in route Phone #: ###-#### Inspection requested via web by Chris Fuhrman,, area 1a walk through
|
BLD-Wall Bracing | 11/18/2019 | 11/18/2019 | 11/18/2019 | P | PART |
Tony Young
|
|
|
SHEAR // Terry Phone #: ###-####.. areas marked on the plans
|
BLD-Framing/Rough-in | 11/12/2019 | 11/12/2019 | 11/12/2019 | P | PART |
Tony Young
|
|
|
Terry Phone #: ###-####,, area A-1 interior ok pending trades,, B-1 interior ok pending trades,, B-1 exterior shear work in progress,, ok to cover when ready
|
BLD-Wall Bracing | 11/8/2019 | 11/8/2019 | 11/8/2019 | P | DEFR |
Tony Young
|
|
|
Please call Chris when in route. Thank you, Phone #: ###-#### Inspection requested via web by Chris Fuhrman
|
BLD-Wall Bracing | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | PART |
Dave Hannah
|
|
|
Please call Chris when in route Phone #: ###-#### Inspection requested via web by Chris Fuhrman area a ok
|
BLD-Conference | 10/9/2019 | 10/10/2019 | 10/10/2019 | A | PART |
Tony Young
|
|
|
Review upcoming framing inspections and egress phasing plan for new school Phone #: ###-#### Inspection requested via web by Chris Fuhrman/// walk through.. will need fire/ l/ s on egress issues 1st,, ok to start sheeting exterior on south walls
|
BLD-Conference | 10/8/2019 | 10/9/2019 | 10/9/2019 | P | DEFR |
Tony Young
|
|
|
Review upcoming framing inspections and egress phasing plan for new school Phone #: ###-#### Inspection requested via web by Chris Fuhrman// called and left a voicemail,, out of time
|
BLD-Energy code compliance | 7/17/2019 | 7/18/2019 | 7/18/2019 | A | PART |
Dave Hannah
|
|
|
Chris Phone #: ###-#### insulated cmu units
|
BLD-Foundation | 7/1/2019 | 7/1/2019 | 7/2/2019 | P | PART |
Tony Young
|
|
|
Chris Phone #: ###-####,, special inspector on site.. pending report
|
BLD-Foundation | 6/27/2019 | 6/27/2019 | 6/27/2019 | P | PEND |
Tony Young
|
|
|
Chris-pour time 1:30 Phone #: ###-####,, special inspection report
|
BLD-Footing | 6/20/2019 | 6/21/2019 | 6/21/2019 | A | PEND |
Tony Young
|
|
|
for area B interior // Chris Phone #: ###-####,, work in progress,, special inspector will be on site for rebar and sample etc.
|
BLD-Foundation | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PART |
Tony Young
|
|
|
area B-Chris Phone #: ###-####,, ok pending special inspection reports
|
BLD-Footing | 6/5/2019 | 6/6/2019 | 6/6/2019 | A | PART |
Tony Young
|
|
|
Chris-stem walls area A-footings area B-pour time 12:30 Phone #: ###-####,, pending special inspection
|
BLD-Footing | 5/15/2019 | 5/16/2019 | 5/16/2019 | P | PART |
Tony Young
|
|
|
Concrete scheduled for 3 PM. Strata scheduled for 2 PM special inspections Please call when in route or to discuss. Thank you, Phone #: ###-#### Inspection requested via web by Chris Fuhrman,, special inspector on site
|
BLD-Footing | 5/16/2019 | 5/16/2019 | 5/16/2019 | A | PART |
Tony Young
|
|
|
Concrete scheduled for 3 PM. Strata scheduled for 2 PM special inspections Please call when in route or to discuss. Thank you, Phone #: ###-#### Inspection requested via web by Chris Fuhrman,, site visit,, work in progress
|