Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD19-00733
StatusIssued
Name PFLEGER KEVIN J
Site Address 2046 S TOLLGATE WAY
Project NamePfleger Addition
Customer Number 
ePlanReviewNo
Description
Permit for a 985sq' addition that adds a basement level Family Room & 1/2 bath, enlarges the Kitchen/Dining on the main level, and enlarges the Master Suite on the upper level. All work per plans, notations, attachments, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/16/20204/17/20204/17/2020ACANC
DetailsMike Jordan
BLD-Final4/15/20204/16/20204/16/2020AFAIL
DetailsMike Jordan
Call aheadKevin - requesting virtual inspection Phone #: ###-####. provide egress ladder in window well. Lower handrail on stairs to basement. Inspection conducted via google duo.
BLD-Energy code compliance11/20/201911/21/201911/21/2019APASS
DetailsMike Jordan
not ready until 10 am // Kevin Phone #: ###-####
BLD-Framing/Rough-in11/19/201911/20/201911/20/2019APASS
DetailsMike Jordan
Jose Phone #: ###-####. All issues resolved except for tempered glazing, windows on order. ok to insulate.
BLD-Framing/Rough-in11/15/201911/18/201911/18/2019AFAIL
DetailsMike Jordan
Kevin Phone #: ###-####. Complete airseal. Complete fireblocking. repair all broken floor joist, justify holes drilled into beams. Tempered glazing required at window by tub upstairs, and by french doors. strap all cut double top plates.
BLD-Framing/Rough-in11/15/201911/15/201911/15/2019PNR
DetailsMike Jordan
Kevin Phone #: ###-####. Needs to complete airseal first.
BLD-Wall Bracing9/25/20199/30/20199/30/2019APASS
DetailsMike Jordan
Jose Phone #: ###-####
BLD-Conference9/17/20199/18/20199/18/2019ADONE
DetailsMike Jordan
Kevin Phone #: ###-####
BLD-Foundation7/31/20198/1/20198/1/2019PPART
DetailsMike Jordan
Jerimy Phone #: ###-####
BLD-Foundation7/8/20197/9/20197/9/2019PCANC
DetailsMike Jordan
rebar // Cody Phone #: ###-####
BLD-Footing7/9/20197/9/20197/9/2019PPART
DetailsMike Jordan
rebar // Cody Phone #: ###-####. Basement footings .