BLD-Blower Door Test Results | 11/12/2019 | 11/12/2019 | 11/12/2019 | P | DONE |
Tell Riley
|
|
|
4.3 ACH50
|
BLD-Final | 11/11/2019 | 11/12/2019 | 11/12/2019 | A | PASS |
Tell Riley
|
|
|
Please call me for garage code. Thanks! Phone #: ###-#### Inspection requested via web by Aron Mock
|
DOC - Permit Finaled | 11/12/2019 | 11/12/2019 | 11/12/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Conference | 8/30/2019 | 8/30/2019 | 8/30/2019 | P | DONE |
Mike Jordan
|
|
|
encroaching on neighbor''s property Phone #: ###-####. Set backs appear to be ok. No approved plans on site to verify.
|
BLD-Energy code compliance | 7/11/2019 | 7/12/2019 | 7/12/2019 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Aron Mock
|
BLD-Framing/Rough-in | 7/10/2019 | 7/11/2019 | 7/11/2019 | A | PASS |
Tell Riley
|
|
|
Please call prior to inspection Phone #: ###-#### Inspection requested via web by Aron Mock//ok to insulate//add blocking at stairs and landing//
|
BLD-Wall Bracing | 7/10/2019 | 7/11/2019 | 7/11/2019 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Aron Mock//bracing ok//conversion chart for staples was provided//
|
BLD-Wall Bracing | 6/18/2019 | 6/18/2019 | 6/18/2019 | P | FAIL |
Dave Hannah
|
|
|
Frame should be on site. Let me know if there are any concerns. Phone #: ###-#### Inspection requested via web by Aron Mock needs to install holddowns
|
BLD-Conference | 5/13/2019 | 5/13/2019 | 5/13/2019 | P | DONE |
Jim Sly
|
|
|
GC contact is ###-####
|
BLD-Foundation | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | PASS |
Jim Sly
|
|
|
Jose Phone #: ###-####
|
BLD-Footing | 4/19/2019 | 4/22/2019 | 4/22/2019 | A | PASS |
Jim Sly
|
|
|
Jose Phone #: ###-####
|