Permit Information
Permit NumberBLD19-01556
StatusFinaled
Name SUCCOR CREEK CONSTRUCTION LLC
Site Address 287 N MAPLE GROVE RD
Project NameSSP Investments Warehouse
Customer Number 
ePlanReviewYes
Description
(SSP INVESTMENTS WAREHOUSE) (DRH19-00124) // 10/25/19 PLAN MOD TO ADD ACCESSIBLE PARKING AND REVISE ACCESSIBLE ROUTE ON SITE. JAR // Permit to construct a new 10,000 sqft. pre-engineered metal storage building and related site improvments for SSP Investments. Work to include: construction of slab on grade concrete foundation, pre-engineered shell with insulation, interior non-bearing walls, restroom, electrical, mechanical, plumbing, and interior finishes to be in compliance with Ch. 8 of the 2015 IBC. Note: complies with ANSI/ASHREA 90.1. Special Inspections required per attached Form 310. Separate racking permit required for any racking over 8 ft in height. This building will be fully Fire Sprinklered with an approved Fire Alarm system. Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/26/201911/27/201911/27/2019APASS
DetailsMike Jordan
Barney Phone #: ###-####. Ok for perm occ.
BLD-Final11/20/201911/21/201911/21/2019APEND
DetailsMike Jordan
Barney Phone #: ###-####. Need final letter from special inspection agency and zoning final.
FIRE-Final Inspection11/20/201911/20/201911/20/2019PPASS
DetailsTroy Cobbley
Life safety passed.

Barney Phone #: ###-####
FIRE-Conference11/13/201911/13/201911/13/2019PDONE
DetailsTroy Cobbley
I went over life safety requirements with the general contractor. I noted unfinished alarm and sprinkler permits, missing address, missing signage....ect.
BLD-Conference11/12/201911/13/201911/13/2019ADONE
DetailsMike Jordan
Barnie Phone #: ###-####
BLD-Energy code compliance11/13/201911/13/201911/13/2019APASS
DetailsMike Jordan
Barnie Phone #: ###-####
BLD-Framing/Rough-in11/13/201911/13/201911/13/2019APASS
DetailsMike Jordan
Barnie Phone #: ###-####
BLD-Energy code compliance9/12/20199/12/20199/12/2019PNR
DetailsMike Jordan
BARNEY- Phone #: ###-####. Work is in progress but not completed.
BLD-Framing/Rough-in9/12/20199/12/20199/12/2019PNR
DetailsMike Jordan
BARNEY- Phone #: ###-####. Needs MEP rough in inspections first.
BLD-Other8/16/20198/19/20198/19/2019APEND
DetailsMike Jordan
red iron structural insp // Barney Harper Phone #: ###-####. High strength bolting. torque wrench method used. All plys in contact. Special inspection will be out this afternoon.
BLD-Concrete7/25/20197/29/20197/29/2019PPASS
DetailsMike Jordan
rebar for tension beam // Ryan Phone #: ###-####. rreinforcement for tension beams ok.
BLD-Foundation7/16/20197/17/20197/17/2019PPART
DetailsMike Jordan
Ryan Phone #: ###-####. Work in progress. #6 tension ties along grid 5 need to 90 into column pedestals as per approved plans. Ok to place pending special inspection. Special inspector to verify 90's at this location.
BLD-Footing7/12/20197/15/20197/15/2019APASS
DetailsMike Jordan
Ryan Phone #: ###-####. All clearance issues have been repaired.
BLD-Footing7/11/20197/12/20197/12/2019AFAIL
DetailsMike Jordan
Ryan Phone #: ###-####. Noted several areas were reinforcement does not have the minimum 3 inch clearance from ground. A correction notice was issued. Perimeter footings and column pad footings at this time only.