Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberBLD19-01927
StatusFinaled
Name OKLAND CONSTRUCTION CO INC
Site Address 1290 W MYRTLE ST
Project NameUsao/Gsa
Customer Number 
ePlanReviewYes
Description
(USAO/GSA) Permit for a first time tenant on the 4th and fifth stories of the existing pioneer crossing building with work to include the build out of 1,647 sq, ft on the fourth story including a 1,313 sq. ft. conference room, a 97 sq. ft. storage room and 237 sq. ft. break room. Improvements on the 5th story include office, conference, break, storage and lobby areas. This building is fully fire sprinklerd with a one story type 1A podium and a 4 story type IIB building above the podium. The assembly use on the 3rd story of the upper building has not been required to be separated from the 5th story as it is considered accessory the story and is regulated as a B occupancy. This Building is fully fire sprinklered for height and area Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/11/20203/12/20203/12/2020APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Sam Reading
FIRE-Final Inspection3/11/20203/12/20203/12/2020APASS
DetailsJim Page
Previously noted item has been corrected, final life fire safety inspection is complete.

Phone #: ###-#### Inspection requested via web by Sam Reading
FIRE-Final Inspection3/10/20203/11/20203/11/2020AFAIL
DetailsJim Page
Could not test release function on north stairwell door due to wiring issue, will need to retest release after repair is made.

Test remote unlock switch for L5 stairwell doors. Phone #: ###-#### Inspection requested via web by Sam Reading
FIRE-Final Inspection3/2/20203/3/20203/3/2020ACANC
DetailsJim Page
Code exceptions done. Need final ok for c of o Phone #: ###-#### >> Inspection requested via web by Sam Reading Inspection cancelled from web by: Sam Reading
BLD-Final3/2/20203/3/20203/3/2020ACANC
DetailsDave Hannah
Code exceptions done. Need final ok for c of o Phone #: ###-#### >> Inspection requested via web by Sam Reading Inspection cancelled from web by: Sam Reading
BLD-Final2/14/20202/18/20202/18/2020APART
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Sam Reading ok for tco ok for co after fire gos perm
FIRE-Final Inspection2/14/20202/18/20202/18/2020APART
DetailsJim Page
Partial final inspection for life fire safety is complete for area of work. Fire sprinkler inspection is complete, fire alarm inspection is complete and NFPA72 compliant, waiting on as-builts to be submitted/approved for candella change in corner offices, fire alarm permit can be finaled after fire alarm permit is back in issued status. A formal letter of approveal to the building code official is required from the architect requesting the 2018 chapter 10 IFC exception for stairwell doors to be allowed locked and release on fire alarm activation as well as the combination tumbler look setup on the file room door and secure storage directly south of the file room. Combination looks do not meet IFC requirements for single action operation and will require approval from the building code official. 30 day TCO authorized by Joe Bruce, Fire Section Supervisor.

Phone #: ###-#### Inspection requested via web by Sam Reading
FIRE-Final Inspection2/13/20202/14/20202/14/2020PFAIL
DetailsTroy Cobbley
Provide all of the small documents, provide letter from the architect for compliance with the 2018 IFC 1010.1.9.11 exception #3, repair the exit sign in the 4th floor conference room.

Phone #: ###-#### Inspection requested via web by Sam Reading
BLD-Final2/13/20202/14/20202/14/2020PCANC
DetailsBrandon Shaw
Phone #: ###-#### >> Inspection requested via web by Sam Reading Inspection cancelled from web by: Sam Reading
FIRE-Conference2/7/20202/7/20202/7/2020ADONE
DetailsJim Page
Fire conference complete, discussed items for life fire safety inspection. All door hardware to include delayed egress needs to in place and functional. Stairwell card readers needs to comply with 2015 IFC section 1010.1.9.11 per conversation with Joe Bruce, Fire Section Supervisor.
FIRE-Final Inspection2/4/20202/7/20202/7/2020ACANC
DetailsJim Page
Was suppose to be scheduled as conference instead of final, this request is cancelled.

Phone #: ###-#### Inspection requested via web by Sam Reading
BLD-Final2/7/20202/7/20202/7/2020PCANC
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by Sam Reading Inspection cancelled from web by: Sam Reading
BLD-Final2/4/20202/7/20202/7/2020ACANC
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by Sam Reading Inspection cancelled from web by: Sam Reading
BLD-Ceiling Grid Inspection1/31/20201/31/20201/31/2020PPASS
DetailsDave Hannah
Cover inspection for 4th floor Conference and break room. Phone #: ###-#### Inspection requested via web by Sam Reading
BLD-Ceiling Grid Inspection1/15/20201/16/20201/16/2020APASS
DetailsDave Hannah
Cover inspection for level 5, West and Northwest corridors and offices. Phone #: ###-#### Inspection requested via web by Sam Reading
BLD-Ceiling Grid Inspection1/13/20201/13/20201/13/2020PPASS
DetailsDave Hannah
inspection for cover Level 5 from Gridline-C south Phone #: ###-#### Inspection requested via web by Sam Reading
BLD-Ceiling Grid Inspection1/7/20201/7/20201/8/2020PPART
DetailsDave Hannah
Grid inspection east of elevators. excepting corridors, admin storage room, and mail room. Phone #: ###-#### Inspection requested via web by Sam Reading offices and hallway east side ok
FIRE-Conference12/24/201912/30/201912/30/2019ADONE
DetailsJim Page
Fire conference complete.

Emergency light fixture layout, workstation furniture, additional signage requirements Phone #: ###-#### Inspection requested via web by Sam Reading
BLD-Wall cover12/5/201912/5/201912/11/2019PPASS
DetailsDave Hannah
L4 shaft wall. Fire-rated enclosure under stairs Phone #: ###-#### Inspection requested via web by Sam Reading
BLD-Wall cover11/18/201911/18/201911/21/2019PPASS
DetailsDave Hannah
Fire rating at 4th floor demising wall. Phone #: ###-#### Inspection requested via web by Sam Reading
BLD-Framing/Rough-in11/19/201911/20/201911/20/2019APART
DetailsDave Hannah
Ceiling cover for hardlids on level 5 Phone #: ###-#### Inspection requested via web by Sam Reading hard lids ok to cover
BLD-Wall cover10/30/201910/30/201910/30/2019PPASS
DetailsDave Hannah
Fire Treated Plywood inspection for south stair interior wall and Secure store room West. Phone #: ###-#### Inspection requested via web by Sam Reading
BLD-Wall cover10/11/201910/14/201910/14/2019PPASS
DetailsDave Hannah
Fire treated plywood walls L5 corridors and East Phone #: ###-#### Inspection requested via web by Sam Reading
BLD-Conference9/18/20199/19/20199/19/2019ADONE
DetailsDave Hannah
Inspector requirements for Tenant build-out Phone #: ###-#### Inspection requested via web by Sam Reading