Permit Information
Permit NumberBLD19-02603
StatusFinaled
Name RADIX CONSTRUCTION INC
Site Address 7100 W STATE ST
Project NameU.S. Bank
Customer Number 
ePlanReviewYes
Description
(US BANK) Permit is to remodel approx. 350 sq. ft. within an existing Albertson’s grocery store. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, removal of select millwork, removal of select acoustic suspended ceiling, removal of select gypsum soffit, construction of interior non-bearing walls to create an office, a BOH area, and open banking area, select new door/door frames, select new interior storefront, millwork, new select suspended acoustic ceiling, electrical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. Fire sprinklers used for building area increase. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/31/201911/1/201911/1/2019APASS
DetailsTony Young
Dave Phone #: ###-####
FIRE-Final Inspection10/18/201910/21/201910/21/2019APASS
DetailsTroy Cobbley
Life safety passed. The building inspector is going to verify the door hardware on the office.

Dave Phone #: ###-####
FIRE-Final Inspection10/16/201910/17/201910/17/2019PFAIL
DetailsTroy Cobbley
*** FAIL No ceiling tiles installed. Fire sprinklers not installed in tiles. Duct wrap needs repaired in 2 places where sitting on grid. MAS***
Dave Phone #: ###-####
BLD-Framing/Rough-in10/14/201910/15/201910/15/2019APASS
DetailsTony Young
Dave Phone #: ###-####,, grid ok