Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberBLD19-02642
StatusFinaled
Name SIMPLICTY HOMES LLC
Site Address 10604 W CRUSER DR
Project Name 
Customer Number 
ePlanReviewNo
Description
**PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 1408 sq. ft., one story single family dwelling with 3 bedrooms, 2 bathrooms, approximately 144 sq. ft. of covered patio/porch and a 504 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. JJN ***SPRINKLERS ARE NOT REQUIRED***LGM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/18/201912/19/201912/19/2019APASS
DetailsMike Jordan
Greg Phone #: ###-####
DOC - Permit Finaled12/19/201912/19/201912/19/2019PPASS
DetailsMike Jordan
BLD-Energy code compliance10/24/201910/25/201910/25/2019APASS
DetailsMike Jordan
Greg Phone #: ###-####. All framing issues resolved.
BLD-Framing/Rough-in10/23/201910/23/201910/23/2019PPASS
DetailsTell Riley
Tyler Phone #: ###-####//need to add truss bracing and bracing at overbuild 4 ft oc///ok to insulate//
BLD-Framing/Rough-in9/25/20199/25/20199/25/2019PCANC
DetailsMike Jordan
Sam Phone #: ###-####
BLD-Wall Bracing9/25/20199/25/20199/25/2019PPASS
DetailsMike Jordan
Sam Phone #: ###-####
BLD-Wall Bracing9/24/20199/25/20199/25/2019AFAIL
DetailsMike Jordan
Greg - Sheer wall insp Phone #: ###-####. Noted several areas missing fasteners. Correction notice posted.
BLD-Foundation8/21/20198/21/20198/21/2019PPASS
DetailsMike Jordan
Desmond (?)-pour time 4:00 Phone #: ###-####
BLD-Footing8/19/20198/19/20198/19/2019PPASS
DetailsMike Jordan
irma Phone #: ###-####
BLD-Conference8/6/20198/7/20198/7/2019ADONE
DetailsMike Jordan
Greg Phone #: ###-####. Met contractor on site to observe the finished excavation. Material is 7 to 8 inch minus pit run. Per the contractor, non is fill matersl, all cut. Did note that the top 6 to 8 inches is losse. It was decided to compactbottom of excavation prior to buildinng forms.