Permit Information
Permit NumberBLD19-02930
StatusFinaled
Name CM COMPANY
Site Address 1475 N COLE RD
Project NamePrimary Health Cole & Fairview
Customer Number 
ePlanReviewYes
Description
(PRIMARY HEALTH AT COLE & FAIRVIEW) (DRH19-00254) **03/06/2020 PLAN MOD FOR LOT LINE ADJUSTMENT AND SITE LANDSCAPING. JAR ** Permit to construct a new 6,340 sq ft medical clinic building. Existing building demolished under BLD19-03527. Work to include: construction of concrete spread footings and ground floor slab; wood framed exterior walls and wood truss roof; exterior windows and doors; electrical lighting and power; mechanical roof top units and ductwork; plumbing. Envelope, lighting, and mechanical in compliance with the 2015 IECC. All work shall comply with the approved drawings, the plan review report, and all applicable codes. Special Inspections required per the attached Form 310. This building will be sprinklered with a fully compliant NFPA 13 and NFPA fire alarm system. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/16/20206/17/20206/17/2020APASS
DetailsMike Jordan
Screened- Tom Phone #: ###-####. Ok for temp occ. Will be ok for perm occ. once electrical and plumbing sign perm.
FIRE-Final Inspection6/8/20206/9/20206/9/2020APASS
DetailsTroy Cobbley
Life safety passed. Hardware on Mech Room door to be single action, to be verified by the building inspector.

screeend // Tom Phone #: ###-####
FIRE-Final Inspection6/4/20206/4/20206/4/2020PFAIL
DetailsTroy Cobbley
Provide final for fire alarm and fire sprinkler permits, provide ADA compliant hardware for Riser Room door, repair exit sign and get approval for the missing fire hydrant at the corner of Fairview and Cole (plans show existing on corner)

screened // Tom Phone #: ###-####
BLD-Ceiling Grid Inspection3/31/20203/31/20203/31/2020PPASS
DetailsMike Jordan
Tom Phone #: ###-####
BLD-Framing/Rough-in1/27/20201/28/20201/28/2020APASS
DetailsMike Jordan
scott Phone #: ###-####. Interior steel stud framed walls ok.
BLD-Energy code compliance1/17/20201/17/20201/17/2020PPASS
DetailsMike Jordan
Scott Phone #: ###-####
BLD-Energy code compliance1/13/20201/13/20201/13/2020PCANC
DetailsMike Jordan
Scott Phone #: ###-####
BLD-Framing/Rough-in1/13/20201/13/20201/13/2020PPASS
DetailsMike Jordan
Scott Phone #: ###-####. exterior wood framed walls only ok to insulate.
BLD-Other12/16/201912/16/201912/16/2019PPASS
DetailsMike Jordan
roof nailing - Scott Phone #: ###-####
BLD-Wall Bracing12/11/201912/11/201912/11/2019PPASS
DetailsDave Hannah
BLD-Wall Bracing12/10/201912/11/201912/11/2019ANR
DetailsMike Jordan
Scott Phone #: ###-####. Moved to pm. inspection.
BLD-Other12/2/201912/3/201912/3/2019PDONE
DetailsMike Jordan
slab on grade // Scott Phone #: ###-####
BLD-Foundation11/5/201911/5/201911/5/2019PPASS
DetailsMike Jordan
Scott Phone #: ###-####
BLD-Foundation10/29/201910/30/201910/30/2019PCANC
DetailsMike Jordan
rebar// scott Phone #: ###-####
BLD-Footing10/25/201910/28/201910/28/2019APART
DetailsMike Jordan
rebar // Scott Phone #: ###-####. Permiter footing. Work in progress. Will have special inspection. will need concrete blankets due to cold temps. Ok to place concrete pending special inspection.