Description
Permit for repairs from fire/smoke damage. Work includes floor/joist/insulation repair, new Kitchen cabinets, some siding repair, and new flooring throughtout. Existing furnace to remain. All work per plans, notations, attachments, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/13/20202/14/20202/14/2020APASS
DetailsTell Riley
Dean- call 30 min prior if possible Phone #: ###-####//R-13 added to fill cavity and suported by twine below the r- 19 that was stapled to sub floor//final is complete//
DOC - Permit Finaled2/14/20202/14/20202/14/2020PPASS
DetailsTell Riley
BLD-Final2/11/20202/12/20202/12/2020ANR
DetailsTell Riley
Dean Phone #: ###-####
BLD-Final2/11/20202/11/20202/11/2020PNH
DetailsTell Riley
Dean- call for access Phone #: ###-####//no access dogs in house let GC know//
BLD-Final2/10/20202/10/20202/10/2020PNR
DetailsTell Riley
Dean- call for access Phone #: ###-####//no plumbing needed per Matt based on phone call//need to fix insulation in crawlspace--stapled to underfloor and compressed--some areas have gaps between the batts//
BLD-Energy code compliance12/5/201912/6/201912/6/2019APASS
DetailsTell Riley
call for access- Dean Phone #: ###-####
BLD-Framing/Rough-in12/5/201912/6/201912/6/2019APASS
DetailsTell Riley
call for access- Dean Phone #: ###-####//no plumbing changes--drain was inspected in mech permit//trades rough ok//framing ok per plans//
BLD-Framing/Rough-in11/25/201911/25/201911/25/2019PPART
DetailsTell Riley
call for lock box info // Dean Phone #: ###-####//under floor beam fix for damage//beam fix ok per engineering and working on wall stud fixes//under floor ok//need mechanical and plumbing and electrical rough ins completed prior to complete framing//